Documente Academic
Documente Profesional
Documente Cultură
MANAGEMENT
Tommy Dreelan Managing Director
WELL SERVICES
Ciaran Dreelan Well Services Director Garry Michie Well Services General Manager Bill Marr Well Engineering Manager
Wireline Manager
PREMISES
Aberdeen Integrated Workshop, Warehouse, Yard and Office facility with room for expansion situated on an overall 10 acre site.
Ellesmere Port Integrated Workshop, Warehouse, Yard and Office facility including a purpose built three pipe test loop for pigging trials, situated on an overall 2 acre site.
HSEQ OBJECTIVES
NO accidents / NO harm to people and NO damage to environment, 100% compliance to date ISO 9001 2000
Awarded March 2002
ISO 14001
End October 2002
BUSINESS OBJECTIVES
Dedicated & Focused Leadership Understanding & Working With our Clients Be Profitable
SERVICES OFFERED
Well Services
Coiled Tubing Services Fluid & Nitrogen Pumping Services Wireline Services Hydraulic Workover Services Subsea Well Intervention Process -
Conditioning, Nitrogen
Purging Helium Leak Detection
Engineering Services
Engineering Services
DIFFERENTIATION
HSEQ & Operational Performance Focused Proven track record of a strong and dedicated team. Innovative SME Niche Service Provider Independence in Market Place Starting from a clean sheet Cost effective Equipment Safety / Operational Criteria
PERSONNEL
Calibre of Personnel Competence Management System Training Identification and Implementation Dedicated Focal Point for Contract Management Continuity of Personnel for Contract Management & Offshore Personnel Experience
EQUIPMENT
Nothing exists in comparison (exceeds legislative and published client requirements)
Full Understanding of clients Requirements Soundproofed to <80DbA @ 1 Mtr Environmental Emission Control Eliminate risk through design
TRACK RECORD
The following is a list of companies which we have worked for throughout the past 12 months covering Well Services:-
PUMP UNIT
PUMP UNIT
FULL OPEN DOORS FOR MAINTENANCE ACCESS OR MAJOR COMPONENT CHANGE-OUT BULKHEAD WITH ALL CONNECTIONS IDENTIFIED AND BUNDED
N2 UNIT
N2 UNIT
CT UNIT OVERVIEW
NEW GENERATION EQUIPMENT REEL, 5 SERIES INJECTOR, SOUNDPROOFED TO 80 dbA, NOX ENV EMMISSIONS, ELIMINATE RISK THROUGH DESIGN, FULL DATA ACQUISITION, CT DETECTOR, CCTV, GIN POLE SYSTEM,
INJECTOR HR 580
KEY FEATURES 80,000 LBS PULL, 40,000 LBS SNUB LIGHTER BY 1000 LBS SMALLER BY 10 L, W & H HYDRAULIC TELESCOPIC GIN POLE HYDRAULIC PIPE STABBING SYSTEM ELECTRONIC LOAD CELL - ACCURRACY DUAL COUNTER WHEELS ACCURRACY WORK PLATFORMS GEAR BOX WITH VARIABLE DISPLACEMENT MOTOR ELIMINATES RISK OF RUN AWAY AS NO HI/LO GEAR
REEL
KEY FEATURES HYDRAULIC TELESCOPIC GIN POLE HYDRAULIC PIPE STABBING SYSTEM WORK PLATFORM REMOTE SPOOLER AT REEL BACK UP COUNTER GUARDING TUBING OILER WIPE FOR INHIBITOR HYDRAULIC TUBING CLAMP
POWER PACK
KEY FEATURES SOUNDPROOFED TO 80 dbA EMMISSIONS CONTROL IMO MARPOL NOx TECHNICAL CODE FULL GUARDING & ROLLERS FOR UMBILICALS INTEGRATED ACCUMULATOR PACKAGE
CONTROL CAB
KEY FEATURES FULL GUARDING & ROLLERS FOR UMBILICAL ADEQUATE SPACE FOR COMPANY MAN DURING CRITICAL ACTIVITY HOSE REELS REDUCING RIG UP TIME & EFFORT
CONTROL CAB
KEY FEATURES CERBERUS JOB SIMULATION, MODELLING & PIPE FATIGUE ORION DATA ACQUISITION INCL WELL & OPERATING PARAMETERS INCL ALL HYD CONTOL PRESSURES CT DETECTOR CCTV SYSTEM FULL BACK UP GAUGES ESS EMERGENCY STOP SYSTEM LINK TO WSS OFFICE
WIRELINE UNIT
KEY FEATURES INTEGRAL POWER PACK SLIMLINE FOOTPRINT DUAL DRUM MULTI SIZE SOUNDPROOFED TO 80 dbA CLEAR VIEW OF RIG FLOOR FOR ELEVATED RIG UP MULTI FUNCTION COUNTERHEAD WEIGHT INDICATOR INTEGRAL TO COUNTERHEAD AUX HYD CONNECTION FOR ADDITIONAL POWER PACK CLOSED LOOP HYDRAULIC SYSTEM INTEGRAL BOP CONTROLS COMPOSITE SHEAVES
BENEFITS TO CLIENT
Tailored Solutions to Reduce Client Costs Competence, Knowledge and past Track Record with various companies Guaranteed Continuity of Personnel for Contracts Aggressive Organisation With High Expectations New & Best Equipment Tailored to Operational Needs
CONCLUSION
Any Questions?