Sunteți pe pagina 1din 43

LP BY PASS SYSTEM

24 December 2013 PMI Revision 00 1

Presentation outline
Introduction of LP Bypass system Overview of LP Bypass System details and lay out Control scheme of LP bypass system

24 December 2013

PMI Revision 00

L.P. BYPASS SYSTEM

LP bypass bypasses steam to IPT & LPT & maintain flow through RH. Function of LP bypass:1. To monitor the pressure in reheat system and to control it under certain operating condition. 2. The volume of steam not utilized by the IPT & LPT during start up & shut down must pass through condenser.

24 December 2013

PMI Revision 00

LP BYPASS SYSTEM
LP Bypass system provide a very effective means of controlling reheat steam flow during
Startup Low-load / part load operation Sudden load rejection

24 December 2013

PMI Revision 00

LP BYPASS SYSTEM
It enhances fast starting capability of turbines from all initial conditions e.g.

Cold condition Warm condition Hot Condition

24 December 2013

PMI Revision 00

LP BYPASS SYSTEM
LP steam-bypass system operates in parallel with the turbine

Protects Condenser from excessive temperature and pressure that could result from sudden injection of superheated steam

24 December 2013

LP BYPASS SYSTEM
The controls for LP Bypass system are combination of electrical and well proven hydraulic system
Electro-hydraulic converter provides the necessary link between hydraulic actuator and electrical system

24 December 2013

PMI Revision 00

SEQUENCE OF EVENTS RESULTING FROM LOAD REJECTION Upon receiving load rejection signal from electrical system: Turbine Speed Controller assumes control of the TG set It initiates fast closure of HP & IP turbine control valves through position controller

Fast closure of turbine control valves cause an immediate decrease in HP 1st. Stage pressure
24 December 2013 PMI Revision 00 8

SEQUENCE OF EVENTS RESULTING FROM LOAD REJECTION Pressure increases in main and reheat steam systems These pressure changes are sensed by HP and LP Bypass controllers Respective bypass valves are opened

24 December 2013

PMI Revision 00

If LP steam- bypass system fails or the condenser cannot accept LP bypass steam , Safety Valves open and dump steam to atmosphere

24 December 2013

PMI Revision 00

10

24 December 2013

PMI Revision 00

11

24 December 2013

PMI Revision 00

12

24 December 2013

PMI Revision 00

13

System details and layout


The controls for LP Bypass system are combination of electrical and well proven hydraulic system Electro-hydraulic converter provides the necessary link between hydraulic actuator and electrical system

24 December 2013

PMI Revision 00

14

Control scheme
Set point formation Pressure control for LP bypass system LP bypass HYDRAULIC System Protection system

24 December 2013

PMI Revision 00

15

Control scheme
The LPBypass Controller acts as a maximum pressure Controller It regulates the reheater pressure either to the fixed set value or suitably derived variable set value If the reheater pressure exceeds this set value, the Controller causes the electro-hydraulic converter to operate and initiate bypass operation

24 December 2013

PMI Revision 00

16

Set Value formation

The Two set values fixed and variable are formed for the LPBypass control system set value to be used is determined by a maximum value selector For the formation of variable set point, a pressure transducer is used to measure the steam pressure in HP turbine

24 December 2013

PMI Revision 00

17

Bypass Controller Block Diagram

24 December 2013

PMI Revision 00

18

LP Bypass System

24 December 2013

PMI Revision 00

19

Features of LPBP Controller


LPBP controller maintains pressure after reheater by controlling LP bypass valves It acts on the coil of the LPBP E-H converter to position the control valves. Two setpoints, fixed and variable are used in maximum selection circuit Variable setpoint is derived from HP first stage pressure Water spray is in two stages depending on steam flow through LPBP stations. LPBP valves cannot open until adequate spray water pressure and required vacuum is there and condenser wall temp is not high. Valves can also be operated manually
24 December 2013 PMI Revision 00 20

LP BYPASS SETPOINTS

24 December 2013

PMI Revision 00

21

CONTROLLER OUTPUT CHARACTERI STICS

24 December 2013

PMI Revision 00

22

Hydraulic Mode of Operation

The controller controls plunger coil of Electro Hydraulic Converter With increase in voltage, the jet pipe is deflected towards right Converter piston moves downwards leading to generation of LPB signal oil through Follow-up pistons provided in the hydraulic control system
24 December 2013 PMI Revision 00 23

Hydraulic Mode of Operation

Two Follow-up Pistons actuate and open first stage of water injection valve Remaining two Follow-up Pistons generate signal oil for opening LPBypass stop and control valve
24 December 2013 PMI Revision 00 24

ADJUSTMENT OF LPBYPASS CONVERTER

24 December 2013

PMI Revision 00

25

Design of LPBypass Valves for 210 MW Steam Turbine

Controlled by 8 bar mineral oil

24 December 2013

PMI Revision 00

26

Design of LPBypass Valve for 500 MW Steam Turbine

Controlled by 36 bar FRF

24 December 2013

PMI Revision 00

27

Protection Devices

Low Vacuum Condensor Protection Spray Water Pressure Switch Condensor Temperature Protection
24 December 2013 PMI Revision 00 28

Protection Devices cause closure of bypass station in case of following eventualities


a) Condensor vacuum is low ( > 0.6 bar absolute ) b) Spray water pressure is low (< 8.5 / 9.5 bar ) c) Temperature of condenser body is high (> 90 C )

24 December 2013

PMI Revision 00

29

Water Injection Valves operate in two stages

Second stage Water Injection Valves open when steam flow through LPBypass Valves increases more than 45 %
24 December 2013 PMI Revision 00 30

CURVE FOR LPBYPASS CONTROLLER

24 December 2013

PMI Revision 00

31

Damping device

24 December 2013

PMI Revision 00

32

24 December 2013

PMI Revision 00

33

24 December 2013

PMI Revision 00

34

Actuator Bypass Stop Valve


24 December 2013 PMI Revision 00 35

Actuator LPBPCV
24 December 2013 Revision 00 500 PMI MW 36

Pilot valve for Water Injection Valve

24 December 2013

PMI Revision 00

37

Water Injection Valve

24 December 2013

PMI Revision 00

38

Combined Bypass Stop & Control Valve 210 MW

24 December 2013

PMI Revision 00

39

Feedback for Pilot valve of Bypass Control Valve 210 MW

24 December 2013

PMI Revision 00

40

24 December 2013

PMI Revision 00

41

24 December 2013

PMI Revision 00

42

THANK YOU

24 December 2013

PMI Revision 00

43

S-ar putea să vă placă și