GRE WATER PIPELINE AND GATHERING SYSTEM INSTALLATION KHAZZAN GAS PROJECT
Date : Tuesday 17th DECEMBER-2013 Muscat
DOMESTIC ARRANGEMENTS
Emergency Exit Fire Alarms and Evacuation Toilets and Breaks First Aid Facilities GSM on Silence mode please
37kms GHTF
RWTF
LAUNCHER
13Kms -GRE header line -01 10Kms -GRE header line -02 `
RWTF
LAUNCHER
RECEIVER
Sr.no. 1 2
Start
Finish 17-Dec-13
Days
01-Jan-14
29-Mar-14 87 days
3
4 5
27-Jul-14
01-Mar-14 01-Mar-14
EXECUTION STRATEGY
CONSTRUCTION APPROACH
Provide commissioning assistance Systems ready for Pre commissioning Completion of Punch Points Completion of Hydro test Activities
Critical Activities
Critical Activities that have been envisaged at this stage from past experience in working similar kind of works are:
Transportation of Pipes
ROW Construction. Trenching considering the amount of hard rock
available.
Transportation of Pipes
Approximate distance to site for transportation is 500 kms Number of estimated trailer trips is approx.250 trips This activity will be sub-contracted to an experienced and approved Transportation company. Method Statement for transportation will be developed and approved by Company prior to start of any activity. Mini HSE workshop shall be conducted for this activity prior to start.
Proper Journey Management (JM) during mobilization phase is key to safe and timely completion. Journey Management procedures will be put in place immediately upon award giving route details/rest areas/speed limits /emergency response etc. Any Movement of resources from Coast to Site will be through proper JM controlled by Coastal Journey Managers. Site based Journey Manager will be established immediately upon award with first mobilization. Manpower movement after establishment from Coast to QarnAlam will be in Public transport. Daily Bus shuttle will be provided from QarnAlam to Block 61 Contractor camp. Thuraya Phone will be provided to the Bus driver to maintain communication at all times.
PIPELINE CONSTRUCTION
RIGHT OF WAY (ROW)
After the approval of First phase of camp, Right of way will be Commenced from the starting of Gathering Header 2 (South) till end point of Hanya Pipeline(approx. 10km+37kms = 47kms).
Planned production for ROW preparation is 500 mtrs per day, Utililizing 2 Dozers & 2 Graders.
Ripper Survey will be carried out immediately after First Phase camp is approved to ascertain the rock quantities
PIPELINE CONSTRUCTION
TRENCHING
It is planned to commence the trenching of 10& 12 pipelines with two trenchers simultaneously.
At this stage rock-blasting is not envisaged, however ripper survey as stated earlier will be carried out in initial stages to establish or rule out requirement of rock-blasting.
Reviewing the Atkins geo-reports of trial pits, at most of the places moderate to hard rock with range of UCS from 1.5 to 281 encountered. With past experience on such strata 300-400 mtrs of linear trench on 10/12 Pipeline per trencher can be
PIPELINE CONSTRUCTION
STRINGING, JOINTING & LOWERING Stringing of both the pipelines 10 and 12 will commence simultaneously. Four independent Jointing teams will be mobilized for 10(2 crew) & 12(2 crews) line after qualification and certification. Jointing productivity for 10 and 12 pipelines is planned as 15 and 20 joints respectively. Pipes for qualification of bonders shall be required 4 weeks in advance Doubling of pipes shall be done above ground and doubled pipes will be lowered and bonded in the trench.
PIPELINE CONSTRUCTION
Back End Activities Back end activities like post padding, laying of FOC cable and installation of tiles, back filling and formation of windrows shall be done on the same rate of progress as planned for the day. Hydrostatic Testing Pipe cleaning activities shall be planned section wise as per approved procedures. Hydrostatic testing activities shall be carried out in sections. Final Testing will be carried out after tie-in joints are carried out.
PIPELINE CONSTRUCTION
WADI CONSTRUCTION
Wadi area is identified for 12 Pipeline is 3.2Kms and for both the headers is 2.2 kms. 4 Major Wadis are identified. Additional Depth and Protection with Sand Sacks depending of Type of wadi will be carried out Approximately 15,000 sand sacks to be laid.
PIPELINE CONSTRUCTION
Well Head & On-Plot Works On-plot Fabrication and Pre-casting foundation works works will be preferred to be carried out at our coastal facilities. Well head construction : 12 nos The amount of concrete works per well is 30 Cu Mtrs. Piping Inch Dia per well head Approx. 280 Inch Dia.
MOBILIZATION
ADMINISTRATOR TBA
7
8 9 10 11 11 12 13 14 15 16 17 18 19 20 21 22 23
Foreman-Rigging
Adminstrator Sotre Keeper Journey Manager Surveyor Mason Carpenter Steel Fixer Rigger Fitter Welder Grinder Painter Electrician Plumber A/c Mechanic Plant Mechanic Plant Electrician
Nos.
Nos. Nos. Nos. Nos. Nos. Nos. Nos. Nos. Nos. Nos. Nos. Nos. Nos. Nos. Nos. Nos. Nos.
1
1 1 1 1 12 10 4 2 1 1 1 1 1 1 1 2 1
7
8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
Nos.
Nos. Nos. Nos. Nos. Nos. Nos. Nos. Nos. Nos. Nos. Nos. Nos. Nos. Nos. Nos. Nos. Nos. Nos.
1
1 1 1 2 2 1 1 1 1 2 1 1 2 1 2 1 1 2
24
25 26 27
Operators
Helpers LD Drivers HD Drivers
Nos.
Nos. Nos. Nos.
13
20 7 4
INTERFACE ACTIVITY
All work in these areas shall be suitably planned and executed so as to minimize any interference with company's operational activities. Other interface related issues GPS anticipate are: Project management issues between Client & GPS at Head Office Engineering and Drawings Receipt of certified materials procured by Client Field Changes Drawings and actual site condition discrepancies.
INTERFACE ACTIVITY
Interface Party
Company/GRE vendor Company/PDO/OGC
Company operations / Company Site Representative / commissioning Team CompanyOperations /Utility owners ROP / Other Contractors Client Appointed contractors
PROJECT SERVICES
GENERAL MANAGER
N.I. VAHORA
HITECH
TECHNICIANS (TBA)
ASHRAF
HEAD OFFICE LOGISTICS T.B.A. TO BE ADVISED
OM PRAKASH
JEYACHANDIRAN
RAM KARAN
RAM BACHAN
FIROZ KHAN
MANOJ KUMAR
TBA
ABDUL MANAN
Manpower Histogram
1.2 300
1 40 50 50 50 50 50 50 40 35 30 30 0.6 22 20 1 0.4 18 20 12 6 6 10 10 4 1 2 2 4 1 1 1 1 2 1 1 1 1 1 20 1 12 16 14 1 1 20 18
250
36
0.8
35
35
35
35
35
30 22 18
200
18 25
18 25
20 1
18 25 20 1
18 25 20 1
18 25 20 1
18 25 20
14
25 20 20
30
150 18 20 1 12 14 1 14 8 10 10 1 100
20
20
35 25 2 14 2 8 2 2 4 4 2 2 8 2 1 2 1 2 1 2 1 2 1 2 1 1 2 1 Jan-14 4 2 14 2 8 2 2 4 4 2 4 8 2 1 2 1 2 1 2 1 2 1 2 1 1 2 1 Feb-14 5 2 14 2 8 2 2 4 4 1 2 4 8 2 1 2 1 2 1 2 1 2 1 2 1 1 2 1 Mar-14 6 2 14 2 8 2 2 4 4 1 2 4 8 2 1 4 1 2 1 2 1 2 1 2 1 1 2 1 Apr-14 7 2 14 2 8 2 2 4 4 1 2 4 8 2 1 4 1 2 1 2 1 2 1 2 1 1 2 1 May-14 8 2 14 2 8 2 2 4 4 1 2 4 8 2 1 4 1 2 1 2 1 2 1 2 1 1 2 1 Jun-14 9 2 14 2 8 2 2 4 4 1 2 4 8 2 1 4 1 2 1 2 1 2 1 2 1 1 2 1 Jul-14 10 2 14 2 8 2 2 4 4 1 2 4 8 2 1 4 1 2 1 2 1 2 1 2 1 1 2 1 Aug-14 11 2 14 2 8 2 2 4 4 1 2 4 8 2 1 4 1 2 1 2 1 2 1 2 1 1 2 1 Sep-14 12 35
35
35
35
35
35
35
12 25
0.2
10 10 12
16 1 6 1 2 2 4 1 1 1 1 2 1 1 1 Nov-13 2
0 Oct-13
20 2 10 2 8 2 2 4 4 2 2 4 1 1 2 1 2 1 2 1 2 1 2 1 1 2 1 Dec-13 3
20 2 10 1 1 8 8 1 50 2 8 1 3 2 3 1 1 3 2 3 1 6 2 1 3 1 1 1 4 2 1 1 2 2 1 1 2 2 1 1 2 2 1 1 2 2 1 1 1 1 2 2 1 1 0 Oct-14 Nov-14 13 14
Equipment Histogram
2.5 100
90
1 1 1 2 2 8 1 2 2 1.5 8 3 3 1 3 2 3 2 3 3 3 2 2 1 2 2 2 2 3 2 6 0 4 2 4 2 4 2 2 Jan-14 4 1 1 1 2 2 1 1 1 2 2 1 1 1 2 2 1 1 1 2 2 1 2 2 1 2 2 1 2 2
8
3 3 1 3 2 3 2 3 3 3 2 1 2 22 2 2 3 2 6 0 4 2 4 6 4 2 2 Feb-14 5
8
3 3 1 3 2 3 2 3 3 3 2 1 2 22 2 2 3 2 6 0 4 2 4 6 4 2 2 Mar-14 6
8
3 3 1 3 2 3 2 3 3 3 2 1 2 2 2 2 2 3 2 6 0 4 2 4 6 4 2 2 Apr-14 7
8
3 3 1 3 2 3 2 3 3 3 2 1 2 2 2 2 2 3 2 6 0 4 2 4 6 4 2 2 May-14 8
8
3 3 1 3 2 3 2 3 3 3 2 1 2 22 2 2 3 2 6 0 4 2 4 6 4 2 2 Jun-14 9
8
3 3 1 3 2 3 2 3 3 3 2 1 2 22 2 2 3 2 6 0 4 2 4 6 4 2 2 Jul-14 10
8
3 3 1 3 2 3 2 3 3 3 2 1 2 2 2 2 2 3 2 6 0 4 2 4 6 4 2 2 Aug-14 11
1 2 2 8 3 3 1 3 2 3 2 3 3 3 2 1 2 2 2 2 3 2 6 0 4 2 4 4 3 1 2 Sep-14 12
80
70
60 1 2 2 6 2 2 1 3 2 2 2 2 2 2 1 1 1 1 1 1 2 1 4 0 3 1 3 3 2 1 1 13 2 2 5 2 2 1 2 1 2 2 1 1 1 1 1 1 1 1 1 1 3 0 2 1 2 2 2 1 1 14 50
1 1 1 1 1 1 1 1 2 3 1 1 1 1 2 1 1 1 1 1 2 1 1 1 1 2 1 1 1 0 1 1 1 Nov-13 1
0.5
0 Oct-13
1 2 4 2 2 1 3 2 2 2 1 2 2 1 1 1 1 2 1 1 1 2 0 2 1 1 1 1 1 2
3 3 1 3 2 3 2 3 3 3 2 1 2 2 2 2 3 2 2 0 2 2 4 1 1 1
Dec-13 3
40
30
1 20
10
Oct-14
0 Nov-14
Key dates
START OF WORK
COMPLETION OF WORK
HEADER LINE -2-10 KM HANYA PIPE LINE -37 KM HEADER LINE -1- 13 KM Completion &Demoblisation