OptiX OSN 3800/6800 Equipment Commissioning

www.huawei.com

Copyright 2008 Huawei Technologies Co., Ltd. All rights reserved.

Foreword

Before this course, you should:

Be familiar with OSN 38006800 equipments. Illustrate the basic signal flow of OSN 38006800 equipments. Understand the functions of cards of OSN 38006800 equipments.

Be familiar with related testing instruments.

Copyright 2008 Huawei Technologies Co., Ltd. All rights reserved.

Page1

Objectives

Upon completion of this course, you will be able to:

Describe the method of OSN 38006800 equipments commissioning

Perform OSN 38006800 equipments single-station testing and commissioning

Perform OSN 38006800 equipments system commissioning independently

Resolve some common problems in commissioning

Copyright 2008 Huawei Technologies Co., Ltd. All rights reserved.

Page2

Contents
1. 2. 3.

Preparations for Commissioning Single-station Commissioning Network Commissioning

Copyright 2008 Huawei Technologies Co., Ltd. All rights reserved.

Page3

Contents
1. Preparations for Commissioning
1.1 Instruments and Tools 1.2 Engineering Design Information 1.3 Requirements on Commissioning Engineers

Copyright 2008 Huawei Technologies Co., Ltd. All rights reserved.

Page4

Instruments and Tools


Tool or Tester Optical Spectrum Analyzer Usage Used in the system index test. Used to test the actual received optical power, the

Optical power meter

receiver sensitivity and the receiver overload at optical


interfaces.

Laptop Fixed optical attenuator Flange

Used to install the Web LCT network management system during the network element (NE) commissioning. Used to weaken the light received by an optical interface. Used to transfer the fiber jumper.

Variable Optical Attenuator


Cross/Straight screwdriver Cassette cleaner or lens tissue

Used to test the receiver sensitivity and the receiver


overload. Used to install or uninstall the board screws/power box. Used to clean the end faces of fibers. during the optical power test Page5

Fiber jumper Used for connections Copyright 2008 Huawei Technologies Co., Ltd. All rights reserved.

Engineering Design Information

Engineering Survey Document

The survey report

The survey guide

Engineering Design Document


Network diagram Board layout diagram of the cabinet Wavelength allocation table Configuration diagram of optical amplifiers Fiber connection diagram

Design description file

Copyright 2008 Huawei Technologies Co., Ltd. All rights reserved.

Page6

Requirements on Commissioning Engineers

The commissioning engineer must be familiar with:

SDH, PDH, WDM and Ethernet theories. OptiX OSN 3800/6800. T2000 or Web LCT, and is skillful at using it for configuring services.

Testers (WDM, SDH and Ethernet).

Copyright 2008 Huawei Technologies Co., Ltd. All rights reserved.

Page7

Questions

What types of instrument do we need?

Which engineering design documents do we need before

the commissioning?

Copyright 2008 Huawei Technologies Co., Ltd. All rights reserved.

Page8

Contents
1. 2. 3.

Preparations for Commissioning Single-station Commissioning Network Commissioning

Copyright 2008 Huawei Technologies Co., Ltd. All rights reserved.

Page9

Contents
2. Single-station Commissioning
2.1 Single-Station Hardware Check 2.2 Power-on Check 2.3 Sub-rack Power-on Test 2.4 Setting the NE ID and IP 2.5 Single-station ECC commissioning 2.6 Single-Station Parameter Testing 2.7 Ending

Copyright 2008 Huawei Technologies Co., Ltd. All rights reserved.

Page10

Single-Station Hardware Check

Checking the Cabinet

Comply with the engineering drawing.

Fiber extractors and anti-wrist straps are there.


No other unrelated objects.

Checking the Sub-rack


Grounding of the sub-rack. No screws, broken & bended pins on the backplane etc.

Checking Cable Distribution

Power supply cables, grounding cables, external alarms wiring and patch cords.

Copyright 2008 Huawei Technologies Co., Ltd. All rights reserved.

Page11

Single-Station Hardware Check (Cont.)

Door

Copyright 2008 Huawei Technologies Co., Ltd. All rights reserved.

Page12

Single-Station Hardware Check (Cont.)

DCM

Make sure DCMs are correctly installed. Make sure the DCMs are compliant with the design document.

Check the ID of SCC

Entire network planning, no repetition.

Copyright 2008 Huawei Technologies Co., Ltd. All rights reserved.

Page13

Power-on Check
Step Content Testing voltage between the input cable terminals Checking resistance (all switches : OFF Checking resistance Requirements OSN 3800DC -38.4V -72V DC AC 90V285V AC OSN 6800 38.4 V 57.6 V (48 V DC20%) 48.0 V 72.0 V (60 V DC20%) Between NEG1 (-) or NEG2 (-) and RTN1 (+) or RTN2 (+),the value is . Between NEG1(-) or NEG2(-) and PGND, the value is . Between NEG1 (-) or NEG2 (-) and RTN1 (+) or RTN2(+),the value is more than 20 k.

(all switches : ON

Between NEG1(-) or NEG2(-) and PGND, the value is more than 20 k.

Copyright 2008 Huawei Technologies Co., Ltd. All rights reserved.

Page14

Power-on Check (Cont.)


-

Copyright 2008 Huawei Technologies Co., Ltd. All rights reserved.

Page15

Sub-rack Power-on Test


Step 1 2 3 Content Powering on Subrack Checking the fan Checking the board indicators Testing the RESET Button ALM CUT Button LAMP TEST Button Requirements Check if the indicator on the front panel of the boards is on. Check the indicator on the front panel of the fan. The green indicator of each board flashes once every other second. Used to reset the SCC. Used to cut off the audible alarm. Used to test all the indicators in the sub-rack.

4 5 6

Copyright 2008 Huawei Technologies Co., Ltd. All rights reserved.

Page16

Setting the NE ID and IP

Set the NE ID

Copyright 2008 Huawei Technologies Co., Ltd. All rights reserved.

Page17

Setting the NE ID and IP

Set the NE IP

Copyright 2008 Huawei Technologies Co., Ltd. All rights reserved.

Page18

Setting the subrack ID

Set AUX subrack ID


Jumper Jumper cap

CPU

CPU

Representing 1

Representing 0

Representing 0

Pay attention to set the ID e.g. ID=001


Page19

Copyright 2008 Huawei Technologies Co., Ltd. All rights reserved.

Single-station ECC commissioning

OSN 3800 single-station ECC connection

NM_ETH1/2: communication between NE and NMS. NM_ETH1/2: communication between NEs.


Cabinet 1 Cabinet 2

Sub-rack NE 2 Sub-rack NE 1 GNE NM_ETH1/2 NM_ETH1/2

Sub-rack NE 1 GNE NM_ETH1

NM_ETH2

NMS

HUB
Copyright 2008 Huawei Technologies Co., Ltd. All rights reserved.

Page20

Single-station ECC commissioning (Cont.)

OSN 6800 single-station ECC connection

ETH1/2/3: cascading between master sub-rack and slave sub-rack. NM_ETH1/2: communication between NE and NE or between NE and NMS.
Cabinet 1
Slave sub-rack 2 ETH1/2/3 Slave sub-rack 1 Cabinet 2

Slave sub-rack 2

Slave sub-rack 1

ETH1/2/3

Master sub-rack

Master sub-rack
NM_ETH1/2 NMS HUB

Copyright 2008 Huawei Technologies Co., Ltd. All rights reserved.

Page21

Single-station Parameter Testing


OTU Mean launched optical power, Central Wavelength and Offset and so on. Attenuation. Attenuation, Isolation. Actual input optical power, Actual output optical power, The gain of flatness and so on.

M40/M40V D40/D40V EDFA

NOTE : Refer to OTC055901 OptiX WDM Testing Slides

Copyright 2008 Huawei Technologies Co., Ltd. All rights reserved.

Page22

Ending

Inspection after NE Commissioning


Item Board interface ODF T2000 NM Content The fiber jumper for test purpose is removed and the normal connection is recovered. The fiber jumper for test purpose is removed and the normal connection is recovered. All the loopbacks of the boards are released and the services configured for test are deleted.

Copyright 2008 Huawei Technologies Co., Ltd. All rights reserved.

Page23

Questions

What is the value of the impedance between RTN1(RTN2) and PGND?

Do we need to test the voltage between the power terminal


before power-on?

Copyright 2008 Huawei Technologies Co., Ltd. All rights reserved.

Page24

Contents
3. Network Commissioning
3.1 Requirements of Optical Power Commissioning 3.2 Network Commissioning 3.3 Others Commissioning

Copyright 2008 Huawei Technologies Co., Ltd. All rights reserved.

Page25

Contents
3.1 Requirements of Optical Power Commissioning
3.1.1 OTU Commissioning 3.1.2 Tributary Board Commissioning 3.1.3 Line Board Commissioning 3.1.4 EDFA Commissioning 3.1.5 Raman Amplifier Commissioning 3.1.6 OSC Board Commissioning 3.1.7 OMU/ODU Commissioning

Copyright 2008 Huawei Technologies Co., Ltd. All rights reserved.

Page26

OTU Commissioning

If no client traffic accessed, force the OTU to emit light.

Disable ALS, Open the Laser.

Adjusting the Input Optical Power of OTU

Optimal input power : (sensitivity+3)~(overload-5)dBm.

Adjusting the Output Optical Power of OTU

Need to adjust the VOA before OTU to close the typical power value at optical amplifier.

Copyright 2008 Huawei Technologies Co., Ltd. All rights reserved.

Page27

Tributary Board Commissioning

Adjusting the input optical power at client side

Optimal input power : (sensitivity+3)~(overload-5)dBm.

Adjusting the output optical power of OTU

Normally, neednt to adjust the output optical power.

Copyright 2008 Huawei Technologies Co., Ltd. All rights reserved.

Page28

Line Board Commissioning

Adjusting the input optical power of OTU

Optimal input power : (sensitivity+3)~(overload-5)dBm.

Adjusting the output optical power of OTU

Need to adjust the VOA before Line board to close the typical power value at optical amplifier.

Copyright 2008 Huawei Technologies Co., Ltd. All rights reserved.

Page29

EDFA Commissioning

The requirement of input/output optical power for EDFA


Type Typical input/output power for single channel (dBm) 40 channels OBU101 OBU103 OBU104 OBU205 OAU101 -20/0 -19/4 -17/0 -16/7 -16/4 80 channels -23/-3 -22/1 -20/-3 -19/4 -19/1 20 23 17 23 20 20 23 17 23 20~31 Standard GaindB Gain Range dB

OAU101
HBA

-20/4
-19/10

-23/1
\

24
29
Page30

24~36
29

Copyright 2008 Huawei Technologies Co., Ltd. All rights reserved.

EDFA Commissioning (Cont.1)

OAU101 Commissioning

When the input power is higher than the typical value at the

receiving end, we can adjust the VOA before the OA to make


sure the input power is typical for OA.
M40 OAU1 OPU03

DCM

When the input power is lower than the typical value at receiving end , how to adjust the OA?

Copyright 2008 Huawei Technologies Co., Ltd. All rights reserved.

Page31

EDFA Commissioning (Cont.2)

OAU101 Commissioning

Example 1 : Parameters:
Typical input/output power for each channel : -16/+4dBm The signal gain range : 20 ~ 31dB

-18dBm

OAU1

+4dBm

A Case: Input power for each channel : -18dBm In this case, change the Gain into 22dB by

DCM
IL of DCM: 8dB

NMS

Copyright 2008 Huawei Technologies Co., Ltd. All rights reserved.

Page32

EDFA Commissioning (Cont.3)

Note :

Max. Signal Gain=Maximum Gain-Loss of DCM

Min. Signal Gain Signal Gain Max. Signal Gain


The Signal Gain can be adjusted through the NMS for the OAU.

For the case:

Max. Signal Gain=31dB-8dB(IL of DCM)=23dB


The Signal Gain range: 20~23dB 20dB 22dB 23dB

Copyright 2008 Huawei Technologies Co., Ltd. All rights reserved.

Page33

EDFA Commissioning (Cont.4)

OAU101 Commissioning

Example 2 : Parameters:
Typical input/output power for each channel : -16/+4dBm The signal gain range : 2031dB A Case:
-20dBm

OAU1

Input power for each channel : -20dBm

DCM
IL of DCM: 8dB

Can we adjust the gain to 24dB ? Min. Signal Gain Signal Gain Max. Signal Gain

Copyright 2008 Huawei Technologies Co., Ltd. All rights reserved.

Page34

Raman Amplifier Commissioning

On-off gain = Optical power on the SYS interface when the

laser is enabled Optical power on the SYS interface when


the Raman laser is disabled

Requirements for Line Quality Raised by Raman Amplifiers

0 km ~ 20 km : Do not use fiber connectors.


0 km ~ 10 km : The single-point additional loss is less than 0.1 dB (G.652) or 0.2 dB (G.655).

10 km ~ 20 km : The single-point additional loss is less than 0.2


dB (G.652) or 0.4 dB (G.655).

Copyright 2008 Huawei Technologies Co., Ltd. All rights reserved.

Page35

OSC Board Commissioning


Optical supervisory channel (OSC)

OSC unit : SC1, SC2.


OSC unit optical power requirements

Receiving Range : -48 dBm ~ -3 dBm. Optimal Receiving : -30 dBm. Launched Power : -4 dBm ~ -0 dBm.

Copyright 2008 Huawei Technologies Co., Ltd. All rights reserved.

Page36

ODU/OMU Commissioning

Adjust the attenuation of the VOAs in each channel of the M40V/D40V to 5 dB before commissioning.

Adjust the VOAs in M40V/D40V to make the optical power (or OSNR) closer to the average value.

Ensure that the maximum difference of optical power among all the
channels is within 4 dB and that of OSNR is within 2 dB.

Copyright 2008 Huawei Technologies Co., Ltd. All rights reserved.

Page37

Contents
3. Network Commissioning
3.1 Requirements of Optical Power Commissioning 3.2 Network Commissioning 3.3 Others Commissioning

Copyright 2008 Huawei Technologies Co., Ltd. All rights reserved.

Page38

Contents
3.2 Network Commissioning
3.1.1 Supervisory Channel Commissioning 3.1.2 Transmitting End of OTM 3.1.3 OLA 3.1.4 Receiving End of OTM 3.1.5 FOADM 3.1.6 ROADM

Copyright 2008 Huawei Technologies Co., Ltd. All rights reserved.

Page39

Supervisory Channel Commissioning

Optical supervisory channel (OSC)

Receiving Range : -48 dBm ~ -3 dBm.


Optimal Receiving : -30 dBm Launched Power : -4 dBm ~ -0 dBm

Electrical supervisory channel (ESC)

When the OTU starts to work and the service is normal, the ESC route is set up.

When no client traffic is accessed, force the OTU to emit light.

Copyright 2008 Huawei Technologies Co., Ltd. All rights reserved.

Page40

Supervisory Channel Commissioning OSC


OTM
Traffic

OLA
Traffic

OTM
Traffic

S C 1

F
OS C

F I U
Traffic OS C

I U

S C 2

F
OS C

F I U
Traffic OS C

I U

S C 1

Traffic

SCC

SCC

SCC

NMS

Copyright 2008 Huawei Technologies Co., Ltd. All rights reserved.

Page41

Supervisory Channel Commissioning OSC

A certain NE should be internal clock source, others should trace the clock for synchronizing and processing supervisory signal.

Priority of clock sourceWest/East external clock, Internal clock. Internal clock


Tracing West Clock Tracing West Clock Tracing West Clock

Copyright 2008 Huawei Technologies Co., Ltd. All rights reserved.

Page42

Supervisory Channel Commissioning ESC


M M 4 40 0
OAU OAU

O T U

M D 4 40 0 M M 4 40 0

O T U

M D 4 40 0 SCC

OAU

OAU

SCC

NMS

Copyright 2008 Huawei Technologies Co., Ltd. All rights reserved.

Page43

Transmitting End of OTM


-2dBm
-19+10lgN

+4+10lgN

+3+10lgN

OTU

OTU

M M 4 40 0

F OBU103 I U

Note : Adjust the attenuation of VOA to make the input optical power
of each wavelength to typical optical power for OBU102. Ptotal (dBm)Psigle (dBm) + 10lgN (dB)

Copyright 2008 Huawei Technologies Co., Ltd. All rights reserved.

Page44

OLA
-16+10lgN +4+10lgN +3+10lgN

OAU101
F I U PA F

BA

I U

DCM

1. VOA : adjust the input optical power for OAU1 closer to typical power. 2. OAU1 : change the gain to make sure the output power is typical.

3. When the input power is lower than typical power: firstly remove the VOA ,
secondly change the gain of OAU1 to make sure the output power is typical.
Copyright 2008 Huawei Technologies Co., Ltd. All rights reserved.

Page45

Receiving End of OTM


(-16+10lgN) (4+10lgN) -2dBm PIN: 7dB (Att.) APD:15dB (Att.) OTU F I U

M40
OAU1 OPU03

M D40 D 4 40 0

OTU

1. VOA : adjust the input optical power for OAU1 closer to typical power. 2. OAU1 : change the gain to make sure the output power is typical. 3. When the input power is lower than typical power: firstly remove the VOA , secondly change the gain of OAU1 to make sure the output power is typical. 4. VOA : add corresponding fixed attenuator for OTU boards at IN ports.

Copyright 2008 Huawei Technologies Co., Ltd. All rights reserved.

Page46

FOADM (MR2+MR2)
-16+10lgN +4+10lgN
O T U O T U
O T U O T U

-19+10lgN

+4+10lgN

OAU101
F I U

BA
MR2

MR2

PA

OBU102

I U


DCM

1. VOA : adjust the input optical power for OAU1 closer to typical power, 2. OAU1 : change the gain to make sure the output power is typical. 3. VOA : add corresponding fixed attenuator for OTU boards at IN ports. 4. VOA : adjust the optical power of passing-through channels. 5. VOA : adjust the optical power of added channels.

Copyright 2008 Huawei Technologies Co., Ltd. All rights reserved.

Page47

FOADM (D40+M40)
-16+10lgN

+4+10lgN

O T U

O O T T U U

O T U

-19+10lgN

+4+10lgN

M F

OAU1
F I U D

PA

BA

4 0

OBU103

I U

DCM

1. VOA : adjust the input optical power for OAU1 closer to typical power. 2. OAU1 : change the gain to make sure the output power is typical. 3. VOA : add corresponding fixed attenuator for OTU boards at IN ports. 4. VOA : adjust the optical power of passing-through channels. 5. VOA : adjust the optical power of the added channels.
Copyright 2008 Huawei Technologies Co., Ltd. All rights reserved.

Page48

ROADM (ROAM+ROAM)
-16+10lgN +4+10lgN
O T U O T U

-3+10lgN
O T U
EXPO

-19+10lgN

OAU1
F I U

D40
DM

O T U F

PA

BA

DCM

ROA M

ROA M
EXPI

OBU103

+4+10lgN

1. VOA : adjust the input optical power for OAU1 closer to typical power.
2. OAU1 : change the gain to make sure the output power is typical. 3. VOA : add corresponding fixed attenuator for OTU boards at IN ports. 4. The VOAs in ROAM and :adjust optical power of passing-through channels.

5. The VOAs in ROAM: adjust optical power of the added channels.


Copyright 2008 Huawei Technologies Co., Ltd. All rights reserved.

Page49

ROADM (WSD9+RMU9)
-16+10lgN +4+10lgN
O T U O O T T U U

OAU1
F
I U

O O O T T T U U U D40 M40

-19+10lgN

+4+10lgN

D40

PA

BA

WSD9

RMU9
IN

OBU103

I U

DCM

EXPO

1.
2. 3. 4.

VOA : adjust the input optical power for OAU1 closer to typical power. OAU1 : change the gain to make sure the output power is typical. The VOAs in WSD9 : adjust the optical power of dropped the channels and passing-through channels. VOA and VOAs in RMU9 : adjust the optical power of the added channels.

Copyright 2008 Huawei Technologies Co., Ltd. All rights reserved.

Page50

ROADM (WSD9+WSM9)
-16+10lgN +4+10lgN
O T U O O T T U U

OAU1
F I U

O O O T T T U U U D40 M40

-19+10lgN

+4+10lgN

D40

PA

BA

WSD9

WSM9
EXPI

OBU103

I U

DCM

EXPO

1. 2. 3. 4. 5.

VOA : adjust the input optical power for OAU1 closer to typical power. OAU1 : change the gain to make sure the output power is typical. The VOAs in WSD9: adjust the optical power of the dropped channels The VOAs in WSD9 and WSM9:adjust optical power of passing-through channels. VOA and VOAs in the WSM9: adjust optical power of the added channels.
Page51

Copyright 2008 Huawei Technologies Co., Ltd. All rights reserved.

Contents
3. Network Commissioning
3.1 Requirements of Optical Power Commissioning 3.2 Network Commissioning 3.3 Others Commissioning

Copyright 2008 Huawei Technologies Co., Ltd. All rights reserved.

Page52

Contents
3.2 Others Commissioning
3.2.1 Network parameter testing 3.2.2 Testing bit errors

Copyright 2008 Huawei Technologies Co., Ltd. All rights reserved.

Page53

Network Parameter Testing


OTU Transmitting Actual receiving optical power, Actual launched optical power, Actual receiving optical power,

end EDFA
Receiving end EDFA

Optical power Flatness of each wavelength and so on,


Actual launched optical power, Actual receiving optical power, Optical power flatness of each wavelength, OSNR and so on.

NOTE : Referring to

OTC055901 OptiX WDM Testing Slides

Copyright 2008 Huawei Technologies Co., Ltd. All rights reserved.

Page54

Network Parameter Testing (OSNR)

Make sure OSNR value is higher than the requirement at receiving end, otherwise bit errors will occur.
The type of OTU at WDM side 2.5G(with FEC) 2.5G(without FEC) 5G(3400ps/nm) (with FEC) 5G(6400ps/nm) (FEC) 10G(without FEC) 10G (with FEC)NRZ 10G (with AFEC)NRZ

The requirement of OSNR


dB 16 21without ESC 22with ESC 22 20 26 20 15.5

Copyright 2008 Huawei Technologies Co., Ltd. All rights reserved.

Page55

Testing Bit Errors

Testing the 10-Minute Bit Errors of Each Optical Channel.

There must be no abnormal alarm or performance event in the entire network.

IN

Tx

Rx

Signal Analyzer
OUT Rx

O T U

O T U
Tx

Site A

Site B

Copyright 2008 Huawei Technologies Co., Ltd. All rights reserved.

Page56

Testing Bit Errors (Cont.)

Testing All-Channel Bit Errors.

There must be no abnormal alarm or performance event in the entire network.


OUT Rx

OTU
Signal Analyzer

OTU

OTU

OTU

OTU
IN Tx

OTU

Site A

Site B

Copyright 2008 Huawei Technologies Co., Ltd. All rights reserved.

Page57

Summary

Preparations for Commissioning Single-station Commissioning Network Commissioning

Copyright 2008 Huawei Technologies Co., Ltd. All rights reserved.

Page58

Appendix A (Insertion Loss)


Board ACS M40 M40V D40 D40V Port IN-BD BA-OUT Mx-OUT Mx-OUT IN-Dx IN-Dx IN-TM FIU Insertion LossdB <1.5 <1.5 <6.5 <8 <8 <8 <1.5 <1 <1 MR4 MR8 Board Port IN-Dx Ax-OUT IN-MO MI-OUT IN-Dx Ax-OUT IN-MO Insertion LossdB <4 <4 <3.5 <3.5 <2.2 <2.2 <1.5

RM-OUT
IN-TC RC-OUT

<1.5
MR2

MI-OUT
IN-Dx Ax-OUT

<1.5
<1.5 <1.5

Copyright 2008 Huawei Technologies Co., Ltd. All rights reserved.

Page59

Appendix B (Insertion Loss)


Board Port IN-Dx Insertion LossdB <3 Board Port Mx-OUT ROAM Insertion LossdB <9

Ax-OUT
MB2 IN-MRO MRI-OUT IN-BMO

<3
<2 <2 <0.7

IN-DM
EXPI-OUT IN-EXPO IN-DMx

<7
<14 <3 <8

BMI-OUT
EXPIOUT RMU9 AMx-TOA ROAOUT

<0.7
<8.5 <12.5

WSD9

IN-EXPO
AMx-OUT EXPI-OUT

<8
<8 <8

WSM9

<1.5

MR2

IN-MO
MI-OUT

<1
<1

Copyright 2008 Huawei Technologies Co., Ltd. All rights reserved.

Page60

Thank you
www.huawei.com