TOTAL AREA OF PROPOSED SITE- 1,37,000 m2 / 33.

85 Acres

FOR EXTRA HIGH VOLTAGEWith every increase of 33000 V there is an increase of 0.305m both vertically and horizontally

This law regulates the offsets around the building with respect to the height, area and type of building. Set backs are usually given to provide sun, proper ventilation, view etc. Set backs are also given for fire tender movement.

Height of Building

Open space

GROUND COVERAGE: It is basically the total area on the site that can be constructed eg. 75% ground coverage means

FAR (FLOOR AREA RATIO) :

Total covered area of all floors Plot area

Floor Area Ratio: is specified taking into account the following aspects: a. Occupancy class b. Type of construction c. Width of street fronting the building and traffic load d. Locality where the building is proposed and the density e. Parking Facilities f. Local fire fighting facilities g. Water supply and drainage facilities

Site specific bye laws for

Institutional Building TOTAL AREA OF PROPOSED SITE- 1,37,000 m2 / 33.85 Acres


Ground coverage 30% of the total site area = 41,100 m2 / 10.15 acres F.A.R. 1 Total permissible area that can Be covered on all the floors= 1,37,000m2 i.e. 3.3 times the ground coverage Max. height in meters No LIMIT.
MINIMUM BUILT UP AREA(AS%OF TOTAL PERMISSIBLE FAR) Exceeding 100000 Sq. Mtrs. but not exceeding 200000 Sq. Mtrs. 25%

Site specific bye laws for Museum , art gallery and exhibition centre

TOTAL AREA OF PROPOSED SITE- 1,37,000 m2 / 33.85 Acres


Ground coverage 30% of the total site area = 41,100 m2 / 10.15 acres F.A.R. 1.30 Total permissible area that can Be covered on all the floors= 1,78,100 m2 i.e. 4.3 times the ground coverage Max. height in meters No LIMIT.

Distance between two adjacent building blocks Distance between two adjacent building blocks shall be minimum 6 mtrs. and maximum 16 mtrs. depending on the height of blocks. For building height up to 18 mtrs., the spacing shall be 6mtrs.and thereafter the spacing shall be increased by 1mtrs.for every addition of 3 mtrs. in height of building subject to a maximum spacing of 16 mtrs. as per clause 8.2.3. of DCR, part 3 of NBC-2005. If the blocks have dead-end sides facing each other, than the spacing shall be maximum 9 mtrs. instead of 16 mtrs.

Floor Area Ratio shall not include: i) A cantilever projection at any level (in setbacks) of a width of 0.75 meter . No construction of any type or any material shall be permitted over projections. ii) Basement(s) , shall be permissible within the setback line on each floor. However maximum permissible area under basement shall be limited

Site section
-Basement area used for- services, storage- the area used shall be equivalent to max permissible ground coverage - Basement area if used for parking, then area equivalent to parking requirement shall be permitted. - Basement if used for any other use, shall be permitted upto the setback line and the area shall be included in the F.A.R.

Basement: i) Basement area shall not exceed beyond building envelope. ii) The height of any basement shall be maximum 1.2 meter from bottom of the slab above the top level of the external drain.The maximum height of the basement from floor to ceiling shall be 4 meter. iii) Basement shall be allowed upto a distance of 2.0 mtrs. from the adjacent plot on the basis of structure stability certificate.
Basement Parking i) In plots larger than 4,000 sq.mtrs., the minimum setback shall be 7.5mtrs. There will be no restriction on the number of levels of basement subject to mechanical ventilation as per provisions in NBC, 2005, water proofing and structural safety. ii) Height of first basement above ground level will be 1.2mtrs.below the roof slab. Where stilt or podium parking is permitted, the first basement roof will be leveled with the ground and the roof slab of the extended basement up to envelop line shall be designed for the fire tender load. Extended Basment: The basement shall be allowed within the setback only for parking purpose all around the plot boundary after leaving a minimum setback of 7.5mtrs. for fire tender movement. The top of the slab shall be flushed to the ground level and the roof shall be designed to take the load of the fire tender with mechanized ventilation

Landscape Bye-laws
12m Wide road

5m c/c

5m c/c

5m c/c

More than 12000 square m

One tree per 100 square meter of open space out of which minimum 50 percent to be in the category of evergreen trees.

50 percent of open area

A green building is one which uses less water, optimizes energy efficiency, conserves natural resources, generates less waste and provides healthier spaces for occupants, compared to a conventional building.

KNOWLEDGE BOULEVARD (GOLD RATED)

LOTUS VALLEY INTERNATIONAL SCHOOL (GOLD RATED)

PATNI KNOWLEDGE CENTRE(GOLD RATED)

FOLLOWING STRATEGIES ARE TO BE FOLLOWED WHILE DESIGNING SUSTANABLE BUILDINGS:

(A) DESIGN STRATEGIES 1) ORIENTATION

N-S DIRECTION FOR MINIMUM DIRECT SUNLIGHT 2)STAGGERED WEST SIDE FOR SELF SHADING

LANDSCAPE ,

HEAT ISLAND EFFECT

Increase in tree cover

site 0.5 kms bus stand Transportation Linkage FIRE WALL SEPARATION

MATERIALS USED IN GREEN BUILDINGS

Pervious Pavement

Double Insulated Glass

Rain water harvesting systems

Use Of Fly Ash in Concrete

Use Of Aluminium frames for windows

DEMOGRAPHICS OF SEC-33A NOIDA

SECTOR TEHSIL NAME DISTRICT

33 A Noida Gautam Budh Nagar

STATE
DIVISION LANGUAGE TIME ZONE

Uttar Pradesh
Meerut Hindi and Urdu IST (UTC+5:30)

ESTIMATED POPULATION MALE FEMALE

3891 2140 1751

As the land is owned by government itself So the govt. had been preserving this land for the FUTURE USE. Presently it is being used as a ram leela ground.
But lately there has been some proposals A world class multi storied habitat centre is to be built over the span of 30 acres (According to the article dated: May 25, 2013)

NTPC
ISCKON TEMPLE

KENDRIYA VIDYALAYA

RTO

KAILASH HOSPITAL

ASSISI CONVENT SCHOOL

WAVE CITY CENTER

NTPC TOWNSHIP

TYPE 1:

TYPE 2:

DOUBLE STOREY HOUSES

APARTMENTS

Devotees visiting timings: Morning(7:00 to 9:00) Evening(4:30 to 6:30)

Weekdays: Max to max 50 during peek hrs. Weekends : Goes upto 200 to 250

TOTAL NO. OF BEDS: 100 DOCTORS PERMANENT: 3 VISITING: 16 TOTAL NO. OF PATIENTS IN A DAY: 250-300

Functionality during night.

Used for gatherings/functions/parties 3 floors Each floor can gather upto 500 people at a time

Active during daytime(10:00 to 2:00) Staff members: 50 people visiting: 150-200

NO. OF STUDENTS: 2500 NO. OF TEACHERS: 80

NO. OF STUDENTS: 40 TOTAL NO. OF TEACHERS: 6

Managed by ngo School for specially challenged children