Sunteți pe pagina 1din 15

TAGOR EMS Factory Tour

www.tagor-ems.com

TAGOR EMS production fundamentals: Product quality Product traceability Production effectiveness Full implementation of ESD regulations Lead free standard solder material Respect of TAGOR EMS company code and working discipline is a must

Reception Warehouse starting traceability point

WH

TAGOR EMS Reception Warehouse starting traceability point Material reception components, PCB panels etc... Material setting per Work Order Component sorting SMD and TH for top and bottom of PCB Internal SMD reels barcode marking and scanning PCB panels barcode marking Documented delivery of material

SMT assembling lines

SMT

TAGOR EMS - SMT assembling lines


Three SMT production lines Pick & place equipment Universal GSM and Genesis Total plant capacity 200.000 cph Chip case 01005 IC and Processor fine pitch 0.3 mm BGA (dimensions/ball size) 35x35 mm/0.3 mm Input PCB barcode scanning point Marrying reel to feeder both scanned while assembling Reflow thermo profiling according components and soldering paste AOI marrying defect to PCB by scanning both

TH & WS

TH and Wave Soldering assembling line

TAGOR EMS - TH and Wave Soldering assembling line PCB panel identification by barcode scanning Identification of operators by barcode scanning Manual insertion of TH components according to working instruction One operator responsible for assembling one panel Wave soldering with prior flux appliance Visual inspection - marrying defect to PCB by scanning both Selective soldering

MI line
MI

TAGOR EMS - MI line Separation of PCB s from the panels PCB identification by barcode scanning Identification of operators by barcode scanning Manual insertion and soldering of TH components according to working instruction One operator responsible for assembling one panel Visual inspection - marrying defect to PCB/ECA by scanning both

FCT & RW

Functional testing, final visual inspection and rework

Functional testing, final visual inspection and rework Functional testing at customers requirement Final visual inspection Rework of ECAs collected from all inspection points Each ECA scanned

Deployment Warehouse

Dep. WH

Deployment Warehouse final traceability point Packing each ECA into ESD bag Packing into cartons each carton has its barcode Marrying ECA with cartons scanning both during packing Documented deployment to the customer

Thank you for your attention!


www.tagor-ems.com

S-ar putea să vă placă și