Technical Progress
1. Concept Design 2. Detail Design and Class Approval 3. Shipyard Production Design 4. Block Prefabrication 5. Conversion in Shipyard
1. Concept Design
Option 1: Owners Responsibility
4. Block Prefabrication
Steel plate & structure cutting. Block assembling. Welding. Rectification. Block to be blasted and painted as per paint specification Inspection & acceptance.
5. Conversion in Shipyard
Progress 1: Conversion in Center Oil Tank Progress 2: Conversion in Side Oil Tank Progress 3: Painting
Staging Lighting and ventilation Tank cleaning and gas-free for hot work
Step 3: Cut and removal out the webs with BKTs in COT
Step 5: Installation of BKTs, Cargo lines, heating coil etc. and other
fitttings
Step 1: Cut and removal out the structures from Side Oil
Tank.
Ladders
Cargo oil pipe/heating coil Other fittings on deck or in tank Weld seam testing Other testing
Progress 3: Painting
After testing, all welded seams to be de-rusted by Grinding and painted as per Specification. Blasting and painting in Tank if required.
Vessels Departure
Docking/undocking
Inclining testing
Converted vessels
Vessels Name MT Pacific Trader Country Greece LOA/Beam 131M/18.5M Conversion Period 32days Main Work Single Hull to Double Hull Main Work
Vessels Name
Country
LOA/Beam
Conversion Period
MT Dartagnan
Greece
228.6M/32.2 M
LOA/Beam 167M/27.4
75days
Country UAE
Country Greece
LOA/Beam 247M/42.7M
Country UAE
LOA/Beam 163.5M/23M
Country UAE
Country Singapore
Conversion Pictures
Block Fabrication
Conversion Pictures
Block Fabrication
Conversion Pictures
Pre-fabricated Blocks
Conversion Pictures
Conversion Pictures
Conversion Pictures
Conversion Pictures
Block installation
Conversion Pictures
Block installation on
Bottom
Conversion Pictures
Block installation on
Bottom
Conversion Pictures
THANK YOU !