Presentation

For ConversionTanker Single Hull/Bottom Converted to Double Hull/Bottom Tanker


Single to Double Hull

Technical Progress
1. Concept Design 2. Detail Design and Class Approval 3. Shipyard Production Design 4. Block Prefabrication 5. Conversion in Shipyard

1. Concept Design
Option 1: Owners Responsibility

Option 2: Shipyards Responsibility

2. Detail design and Class Approval


Option 1: Owners Responsibility

2. Detail Design and Class Option 2: Shipyards Responsibility Approval

3. Shipyard Production Design


Shipyard are fully responsible for converting the basic design to production drawings within Max. 10 days.

4. Block Prefabrication
Steel plate & structure cutting. Block assembling. Welding. Rectification. Block to be blasted and painted as per paint specification Inspection & acceptance.

New block to be prefabricated in workshop

Inner bottom plate block

Side BHD block

5. Conversion in Shipyard
Progress 1: Conversion in Center Oil Tank Progress 2: Conversion in Side Oil Tank Progress 3: Painting

Progress 1: Conversion in Center Oil Tank


Step 1: Vessels arrival

GAS FREE for

Hot Work !!!

Staging Lighting and ventilation Tank cleaning and gas-free for hot work

Step 2: Deck access opening

Strength Calculation Deck piping and fittings Reinforcement

Step 3: Cut and removal out the webs with BKTs in COT

Cargo line&Heating coil Measuring Cutting

Step 4: Installation of Inner bottom plate block in COT

Step 4: Installation of Inner bottom plate block in COT

Step 4: Installation of Inner bottom plate block in COT

Step 5: Installation of BKTs, Cargo lines, heating coil etc. and other

fitttings

Progress 2: Conversion in Side Oil Tank

Step 1: Cut and removal out the structures from Side Oil

Tank.

Step 2: Installation of Girders and Webs in Side Oil Tank.

Step 3: Installation of Inner bottom plate block in Side Oil Tank

Step 4: Installation of Slop bottom plate block in Side Oil Tank

Step 5: Installation of side BHD block in Side Oil Tank

Step 5: Installation of webs in Side Oil Tank

Step 6: Final Installation after steel work

Ballast system integrating

Ladders
Cargo oil pipe/heating coil Other fittings on deck or in tank Weld seam testing Other testing

Progress 3: Painting
After testing, all welded seams to be de-rusted by Grinding and painted as per Specification. Blasting and painting in Tank if required.

Vessels Departure

Docking/undocking
Inclining testing

Converted vessels
Vessels Name MT Pacific Trader Country Greece LOA/Beam 131M/18.5M Conversion Period 32days Main Work Single Hull to Double Hull Main Work

Vessels Name

Country

LOA/Beam

Conversion Period

MT Dartagnan

Greece

228.6M/32.2 M
LOA/Beam 167M/27.4

75days

Single Bottom to Double Bottom


Main Work Single Hull/Bottom to Double Hull/Bottom

Vessels Name MT Jaguar

Country UAE

Conversion Period 75days

Vessels under conversion


Vessels Name MT Korea Sunnyhill Country Korea LOA/Beam 171M/25.4M Conversion Period 60days Main Work Single Hull/Bottom to Double Hull/Bottom Main Work Single Hull/Bottom to Double Hull/Bottom

Vessels Name MT Ce-Shilla

Country Greece

LOA/Beam 247M/42.7M

Conversion Period 120days

Vessels confirmed and to be converted in 2005


Vessels Name MT Sea Giant Country UAE LOA/Beam 231M/44M Conversion Period 120days Main Work Single Hull/Bottom to Double Hull/Bottom Main Work Single Hull/Bottom to Double Hull/Bottom Main Work Single Bottom to Double Bottom Main Work Single Bottom to Double Bottom

Vessels Name MT Sea Victory

Country UAE

LOA/Beam 163.5M/23M

Conversion Period 75days

Vessels Name MT Milagro

Country UAE

LOA/Beam 219.9M/35.2 M LOA/Beam 149M/22.8M

Conversion Period 60days

Vessels Name MT Fujigawa

Country Singapore

Conversion Period 45days

Conversion Pictures

Block Fabrication

Conversion Pictures
Block Fabrication

Conversion Pictures
Pre-fabricated Blocks

Conversion Pictures

Deck access opening

Conversion Pictures

Lowering Blocks into Tank

Conversion Pictures

Lowering Block into Tank

Conversion Pictures

Block installation

Conversion Pictures

Block installation on
Bottom

Conversion Pictures

Block installation on

Bottom

Conversion Pictures

Side Block installation

THANK YOU !