Project results and perspectives in Romania ISPE Bucharest ADR Centru Brussels, Belgium, 21.5.2014 INITIATIVES SUPPORTED DURING PROJECT LIFECYCLE 1. Biomass Heating Plant in the Incubatorul de Afaceri Building (Business Incubator Building) - Sfantu Gheorghe PromoBio region: Centru Used technology: Installed (nominal) power: 135 kW Annual heat production: 240 MWh Annual biomass consumption: 430
Project results and perspectives in Romania ISPE Bucharest ADR Centru Brussels, Belgium, 21.5.2014 INITIATIVES SUPPORTED DURING PROJECT LIFECYCLE 1. Biomass Heating Plant in the Incubatorul de Afaceri Building (Business Incubator Building) - Sfantu Gheorghe PromoBio region: Centru Used technology: Installed (nominal) power: 135 kW Annual heat production: 240 MWh Annual biomass consumption: 430
Project results and perspectives in Romania ISPE Bucharest ADR Centru Brussels, Belgium, 21.5.2014 INITIATIVES SUPPORTED DURING PROJECT LIFECYCLE 1. Biomass Heating Plant in the Incubatorul de Afaceri Building (Business Incubator Building) - Sfantu Gheorghe PromoBio region: Centru Used technology: Installed (nominal) power: 135 kW Annual heat production: 240 MWh Annual biomass consumption: 430
The sole responsibility for the content of these slides lies with the authors.
authors. It does not necessarily reflect
the opinion of the European Union. Neither the EASME nor the European Commission are responsible for any use that may be made of the information contained therein.
Project results and perspectives in Romania
ISPE Bucharest ADR Centru Brussels, Belgium, 21.5.2014
INITIATIVES SUPPORTED DURING PROJECT LIFECYCLE 1. Biomass Heating Plant in the Incubatorul de Afaceri Building (Business Incubator Building) - Sfantu Gheorghe PromoBio region: Centru Used technology: Installed (nominal) power: 135 kW Annual heat production: 240 MWh Annual biomass consumption: 430 m 3
Fuel: sawdust, wood chips The boiler is produced by a local company Beneficiary: COVIMM Sf. Gheorghe Biomass suppliers: MONDOIMPEX (sawdust) and ERPEK IND (wood chips)
INITIATIVES SUPPORTED DURING PROJECT LIFECYCLE 2. Biomass Thermal Plant BERTIS - Sfantu Gheorghe PromoBio region: Centru Used technology: Installed (nominal) power: 500 kW Annual heat production: 2000 MWh Annual biomass consumption: 2273 m 3
Fuel: wood chips The boiler is produced by a local company Beneficiary: BERTIS Sf. Gheorghe Biomass supplier: ERPEK IND (wood chips)
INITIATIVES SUPPORTED DURING PROJECT LIFECYCLE 3. Biomass Thermal Plant Dalia Valea Crisului PromoBio region: Centru Used technology: Installed (nominal) power: 750 kW Annual heat production: 1875 MWh Annual biomass consumption: 5200 m 3
Fuel: sawdust The boiler is produced by a local company Beneficiary: Dalia Valea Crisului Biomass supplier: Dalia (wood residues - agriculture) Technological supplier: ERPEK IND
INITIATIVES SUPPORTED DURING PROJECT LIFECYCLE 4. Biomass Thermal Plant Tg. Secuiesc PromoBio region: Centru Used technology: Installed (nominal) power: 25 kW Annual heat production: 47.5 MWh Annual biomass consumption: 125 m 3
Fuel: sawdust The boiler is produced by a local company Beneficiary: private individual Biomass supplier: REDWOOD (wood residues) Technological supplier: ERPEK IND
INITIATIVES SUPPORTED DURING PROJECT LIFECYCLE 5. Biomass Heating Plant Odorheiu Secuiesc PromoBio region: Centru Used technology: Installed (nominal) power: 9500 kW Annual heat production: 76000 MWh Annual biomass consumption: 89430 m 3
Fuel: wood chips Beneficiary: URBANA Biomass supplier: NEVAL Supporting person from local authority: Katalin Bako / Head of Technical Division, Odorheiu Secuiescs Municipality INITIATIVES SUPPORTED DURING PROJECT LIFECYCLE 6. Biomass Heating Plant Miercurea Ciuc PromoBio region: Centru Used technology: Installed (nominal) power: 3650 kW Annual heat production: 6480 MWh Annual biomass consumption: 7624 m 3
Fuel: wood chips Beneficiary: GOSCOM Biomass supplier: NEVAL Supporting person from local authority: Domokos Szoke / Vice Mayor INITIATIVES SUPPORTED DURING PROJECT LIFECYCLE 7. Biomass Heating Plant Brates PromoBio region: Centru Used technology: Installed (nominal) power: 150 kW Annual heat production: 285 MWh Annual biomass consumption: 335 m 3
Fuel: wood chips Beneficiary: Bratess Municipality Biomass supplier: TEGA Supporting person from local authority: Csaba Keresztely / Mayor 9 PILOT PROJECTS COMPARED TO PERFORMANCE INDICATORS Specific performance indicators Results Minimum of 10 companies representing 13 MW thermal
evaluate their bioenergy value chain 3-4 pilot project companies adopt the proposed models corresponding to 10 MW thermal
7 pilot project companies adopt the proposed models corresponding to 14.71 MW thermal
13 companies representing 14.71 MW thermal evaluate their bioenergy value chain 30 local stakeholders per region involved in the strategic development. More than 50% of participants will take part of three regional workshops 112 local stakeholders per region involved in the strategic development. More than 50% of participants took part of three regional workshops 10 PILOT PROJECTS COMPARED TO PERFORMANCE INDICATORS Specific performance indicators Results At least 1 developed action plan are implemented / under implementation Between 6-8 pilot project business partners trained in Finland or Austria Regional Action Plan was approved by the Regional Development Board (Decision no.9/2014) 9 pilot project business partners trained in Finland or Austria Between 6-8 pilot project business partners provided with tailored support services in establishing new bioenergy projects 9 pilot project business partners provided with tailored support services in establishing new bioenergy projects 11 PILOT PROJECTS COMPARED TO PERFORMANCE INDICATORS Specific performance indicators Results 1-2 contracts out of 3-4 pre- contracts are signed At least one per region. Identification of 1-2 new project ideas supported by the regional authorities to be developed in the next 3 years per region 3 contracts out of 7 pre-contracts are signed 5 projects (Sf Gheorghe, Avrig, Fagaras, Odorheiu Secuiesc and Brasov) 12 SEVEN FEASIBILITY STUDIES AND PERSPECTIVES FOR REAL BUSINESS 1. Biomass Heating Plant in the Incubatorul de Afaceri Building (Business Incubator Building) - Sfantu Gheorghe Four projects were commissioning in 2013 2. Biomass Thermal Plant BERTIS - Sfantu Gheorghe 3. Biomass Thermal Plant Dalia Valea Crisului 4. Biomass Thermal Plant Tg. Secuiesc Increased RES-based heat and power production during the project cycle (2011-2014): 4,165.5 MWh Biomass mobilized (tonnes) during the project cycle (2011-2014): 1,277 tonnes Type of biomass mobilized (m 3 ) during the project cycle (2011-2014): 2,411 m 3 wood chips and 5,613 m 3 sawdust Employment created during the project cycle (2011-2014): 4 persons
13 SEVEN FEASIBILITY STUDIES AND PERSPECTIVES FOR REAL BUSINESS 5. Biomass Heating Plant Odorheiu Secuiesc Four projects will be in operation after 2016
6. Biomass Heating Plant Miercurea Ciuc 7. Biomass Heating Plant Brates Increased RES-based heat and power production in the near future by 2020: 356,413 MWh Biomass to be mobilized (tonnes) in the near future by 2020: 105,141 tonnes Type of biomass to be mobilized (m 3 ) in the near future by 2020: 404,378 m 3 wood chips and 33,678 m 3 sawdust Employment to be created in the near future by 2020: 11 persons