DEVELOPMENT OF AUTOMATED BALANCE BOARD MEASUREMENT SYSTEM OUTLINE Objectives of the Project Methodology Outcomes Conclusion
OBJECTIVES To develop an automated balance board measurement system that can automatically record the balance performance of the users.
The system must be able to perform the tasks below: To indicate which direction where the board unbalance, To measure the accumulate time for unbalance position for each direction. (left and right) To measure the maximum time that the participant can maintain balance on the board. To record the data collected as a reference.
METHODOLOGY Idea & Design Idea Generating Idea Selection Hardware Development Design Fabrication Software Development Programming Front Panel Testing Hardware and SoftwareTest Accuracy Test HARDWARE DEVELOPMENT HARDWARE DEVELOPMENT 5 Main Components: Standing Board
HARDWARE DEVELOPMENT 5 Main Components: Standing Board Shaft and Bearings
HARDWARE DEVELOPMENT 5 Main Components: Standing Board Shaft and Bearings Support and Stand HARDWARE DEVELOPMENT 5 Main Components: Standing Board Shaft and Bearings Support and Stand Base Platform
HARDWARE DEVELOPMENT 5 Main Components: Standing Board Shaft and Bearings Support and Stand Base Platform Electronic Components
DESIGN 1 st Design HARDWARE 1 st Prototype DESIGN 2 nd Design HARDWARE 2 nd Prototype DESIGN 3 rd Design SOFTWARE DEVELOPMENT SOFTWARE DEVELOPMENT LabView Front Panel Left Unbalance Time Right Unbalance Time Maximum Balance Time Data Recording ALGORITHM ALGORITHM Sub-Programs Left Accumulate Time
ALGORITHM Sub-Programs Left Accumulate Time Right Accumulate Time ALGORITHM Sub-Programs Left Accumulate Time Right Accumulate Time Maximum Balance Time
TESTING ACCURACY TEST Left Unbalance Time
Right Unbalance Time
Maximum Balance Time ACCURACY TEST 2 Stopwatches
1 Controlling the board
OUTCOMES HARDWARE Modified 2 nd Prototype SOFTWARE ACCURACY TEST Average Deviation Percentage: Left 2.08% Right 0.95% Max 1.06% CONCLUSION CONCLUSION Hardware is developed LabView Programming Left Unbalance Time Measurement Right Unbalance Time Measurement Maximum Balance Time Measurement Data Recording THANK YOU