Sunteți pe pagina 1din 13

Intelligent Frequency

Optimization System
Huawei Technologies

HUAWEI TECHNOLOGIES CO., LTD.

Difficulties in Planning by Simulation

Indoor Sites
Indoor sites is more
important in some
areas.
It is very difficult to
make frequency plan by
simulation for indoor
sites.

Parameters
Configuration
Various
parameters
configuration,
any improper
setting will
lead to low
quality
frequency
Traffic Model
plan.
Subscriber activity
is different of each
user, cell, area, city.
Traffic Model
cannot describe the
activity of
Page 2
subscriber of real
network completely.

Difficult to make
frequency plan by
simulation for a
developing network.

Propagation Model
It should be corrected
by every city and
scenario.
There is theoretic 8dB
error even all
propagation models
have been corrected
rightly.
Digital Map
New buildings appear
every day in some cities.
It is impossible to obtain
a digital map same with
the city completely.
All Rights Reserved HUAWEI TECHNOLOGIES CO., LTD. 2007

Frequency Planning Through MR Data Collection


Neednt
Propagation Model
Neednt
Digital Map
Neednt
Traffic Model
Neednt
Consider of Indoor
Sites

MR

BTS
BSC

MR

MR
BSC

iManager M2000

No
Theoretic Error
Real
Subscriber Feeling

MRs
MRsdata
datacollected
collectedbased
basedfrequency
frequencyplanning
planningleads
leadsto
tocost
cost
affective
affective&&more
moreaccurate
accuratesolution.
solution.

Page 3

All Rights Reserved HUAWEI TECHNOLOGIES CO., LTD. 2007

Huawei- AFP SolutionIFOS

IFOS (Intelligent Frequency Optimization System) is Huawei developed tool which worked on the
basis of AFP (Automatic Frequency Planning), Takes the network real time MRs data as input to
generate the most affective Frequency plan.

Huawei IFOS frequency re-planning service is based on the MR data collection and analysis of the
subscribers from the existing network. The interference matrix is used to generate a network model,
which is best for the existing network for the entire network frequency optimization. This service can
reduce the intra-network interference and improve the voice quality and customer experience

Advantages

Effectively improve the utilization of network frequency resources to support sustainable network
development.

Reduce intra-network interferences and improve voice quality by re-planning frequencies to


enhance the brand competitiveness.

Improve the efficiency of frequency optimization and enhance the accuracy and rationality of
frequency planning through MR data analysis and IFOS Platform.

Resolve the intra-network interference caused by improper frequency planning or strategy, improve
the voice quality and increase subscriber satisfaction.

Page 4

All Rights Reserved HUAWEI TECHNOLOGIES CO., LTD. 2007

IFOS Work Flow

Micros oft Office


Excel Works heet

Page 5

All Rights Reserved HUAWEI TECHNOLOGIES CO., LTD. 2007

Network Evaluation
Network
Evaluation

Network
Parameters
Collection

DT test evaluation
RxQual analysis
Traffic statistics RQI
analysis

Complaint analysis
C/I and coverage
simulation evaluation

Page 6

RF
optimization

Network MR
Data Collection

Frequency
Re-planning

Goal:
Goal:
The evaluation data can be used as the basis and reference
The evaluation data can be used as the basis and reference
for re planning frequencies service.
for re planning frequencies service.

Attention:
Attention:
All the test method and KPI formula adopted during
All the test method and KPI formula adopted during
Network Verification period should be the same with this
Network Verification period should be the same with this
period.
period.

All Rights Reserved HUAWEI TECHNOLOGIES CO., LTD. 2007

Network
Verification

RF Optimization

Network Parameters Collection


Network
Evaluation

Network
Parameters
Collection

RF
Optimization

Network MR
Data Collection

Frequency
Re-planning

Network
Verification

Available Resource
Information
Network
Configuration
Engineering
Parameters
Neighbor Cell
Information

Goal:
Goal:
Check
Checkthe
theavailable
availablefrequency
frequencyand
andsite
site
configuration.
configuration.

Page 7

Attention:
Attention:
Make
Makesure
surethe
theEngineering
EngineeringParameters
Parametersare
are
consistent
with
the
existing
network.
consistent with the existing network.

All Rights Reserved HUAWEI TECHNOLOGIES CO., LTD. 2007

RF Optimization
Network
Evaluation

Network
Parameters
Collection

RF
Optimizatio
n

Network MR
Data Collection

Frequency
Re-planning

Co-BSIC & CoBCCH


optimization
Overshooting
optimization
Neighbor list
optimization

Goal:
Goal:
Distance the Co-BCCH & Co-BSIC cells
Distance the Co-BCCH & Co-BSIC cells
from each other
from each other
Resolve the overshooting issue
Resolve the overshooting issue
Optimize
Optimizethe
theneighbor
neighborlist
list
Page 8

Attention:
Attention:
Collect
CollectMR
MRdata
dataafter
afterthe
theoptimization
optimizationofof
Co-BSIC
Co-BSIC&Co-BCCH
&Co-BCCH

All Rights Reserved HUAWEI TECHNOLOGIES CO., LTD. 2007

Network
Verification

Network MR Data Collection


Network
Evaluation

Network
Parameters
Collection

RF
Optimization

Network MR
Data Collection

Freeze Network
Set Measurement
configuration and
start
measurement
Generation of MR
interference
matrixes
Generate
interference matrix
of new sites by Unet
Generate Final
Interference
Matrix

Page 9

All Rights Reserved HUAWEI TECHNOLOGIES CO., LTD. 2007

Frequency
Re-planning

Network
Verification

Goal:
Goal:
Get
Getimportant
importantinput
inputdata
datafor
for
Frequency
Re-planning.
Frequency Re-planning.
Attention:
Attention:
BSC
MR data from the
BSCcollects
collects MR data from the
UE.
UE.MR
MRdata,
data,includes
includesuplink
uplinkand
and
downlink
signal
levels,
uplink
and
downlink signal levels, uplink and
downlink signal quality, TA,
downlink signal quality, TA,
neighbor
neighborcell
celllevels,
levels,neighbor
neighborcell
cell
frequencies,
neighbor
cell
BSIC,
frequencies, neighbor cell BSIC,
MS transmit power, BTS transmit
MS transmit power, BTS transmit
power,
power,and
andDTX
DTXinformation.
information.
After
input
MR
data
After input MR datatotoCellOpt,
CellOpt,
interference
Matrix
as
output
interference Matrix as outputcan
can
bebeacquired.
acquired.

Frequency Re planning
Network
Evaluation

Network
Parameters
Collection

RF
Optimization

Goal:
Goal:
Developing the usage of Frequency Resource.
Developing the usage of Frequency Resource.

Network MR
Data Collection

Frequency
Re-planning

Network
Verification

Input Final Interference Matrix


Generate New Frequency Plan
by IFOS Center

Attention:
Attention:
This
Thisisisthe
themost
mostimportant
importantphase
phasefor
forthe
the
frequency
planning,
seasoned
experts
must
frequency planning, seasoned experts mustbe
be
involved.
involved.
Make
Makesure
sureall
allthe
theengineering
engineeringparameters
parametersand
and
MR
report
actually
reflect
the
existing
network,
MR report actually reflect the existing network,
that
thatmeans
meansthe
theengineering
engineeringimplementation
implementation
quality
is
good.
quality is good.
Its
Itsbest
besttotokeep
keepsome
someredundancy
redundancyFrequency
Frequency
Resource.
Resource.

Page 10

New frequency audit by expert


and U-net

All Rights Reserved HUAWEI TECHNOLOGIES CO., LTD. 2007

Afri
ca

Chi
na

Network Verification
Network
Evaluation

Network
Parameters
Collection

RF
Optimization

Network MR
Data Collection

Frequency
Re-planning

Network
Verification

DT/CQT test
analysis
KPI monitoring
analysis
Treatment of some
problems

Goal:
Goal:
To
Toverification
verificationnetwork
networkperformance
performanceafter
after
Frequency
Re-planning
with
the
evaluation
Frequency Re-planning with the evaluationresult
result
before
Frequency
Re-planning
.
before Frequency Re-planning .

Page 11

Attention:
Attention:
All
Allthe
thetest
testmethod
methodand
andKPI
KPIformula
formulaadopted
adopted
during
Network
Verification
period
should
during Network Verification period shouldbe
bethe
the
same
with
Network
Evaluation
period.
same with Network Evaluation period.

All Rights Reserved HUAWEI TECHNOLOGIES CO., LTD. 2007

IFOS Freeze Activities & their Impact


Priority

Activities

Activities impact

new sites\cell on air

insufficient MR data \ imprecise


IM(interference matrix)

BCCH modification

imprecise IM(interference matrix)

BSIC modification

imprecise IM(interference matrix)

TRX Power modification

imprecise IM(interference matrix)

Sites\Cells out of service

insufficient MR data \ imprecise


IM(interference matrix)

Cell Azimuth

imprecise IM(interference matrix)

Antenna Tilt

imprecise IM(interference matrix)

Parameters involved in coverage


\access\handover Rx lev threshold

imprecise IM(interference matrix)

Cell expansion

insufficient MR data \ imprecise


IM(interference matrix)

10

Add\Delete neighbor cell Relationships

imprecise IM(interference matrix)

Above
Abovementioned
mentionedactivities
activitieshave
haveadverse
adverseaffect
affecton
onIM
IMgeneration.
generation.
Service
Serviceaffecting
affectingAlarms
Alarms&&site/cell
site/celllevel
leveloutages
outageswill
willaffect
affectthe
thegenuine
genuine
cell
cellto
tocell
celloverlaps
overlaps&&C/I
C/Irelation.
relation.

Page 12

All Rights Reserved HUAWEI TECHNOLOGIES CO., LTD. 2007

Thanks!

13

Page 13

All Rights Reserved HUAWEI TECHNOLOGIES CO., LTD. 2007

S-ar putea să vă placă și