for Construction
SAP Best Practices for Engineering,
Construction, and Operations
(India)
Scenario Overview
Purpose and Benefits:
Purpose
Benefits
Improve the visibility of profitability, TCO and return on asset and equipment
Scenario Overview
SAP Applications Required:
Equipment Administrator
Project Manager
Warehouse Clerk
Scenario Overview
Detailed Process Description:
Time-based Equipment Process
This business process describes the planning, dispatching and settlement of time based
equipment. Time based equipment can be single- or multipart equipment, which are shipped
via an ETM shipping document and are settled due to time/days they have been on a
recipient/location and its quantity. The shipping document allows the tracking of each
equipment (single- and multipart). A time based equipment is settled periodically with a fixed
price, whereas it is not relevant, how often an equipment has been used (in operation). A
typical time based equipment is a crane.
The time based equipment process starts with an equipment request of a project manager or
foreman. He needs a crane with a certain specification (e.g. Hook high max. 20 mtr.) for a
certain period. The project manager or foreman can either enter an ETM requisition note
directly by himself or he calls the equipment manager/administrator (responsible for all
equipment) and he than will enter the requirement in the system. After the equipment
manager has assigned the request to an equipment, it will be send out to the project.
Typically month end the settlement and billing run takes place.
Scenario Overview
Detailed Process Description:
Performance Based Equipment Process
This business process is used to record performed equipment hours, used amount of fuel and oil
(e.g. liter), amount of kilometers etc. for a project and to settle performance based equipment
(PBE). PBEs are settled due to its performed hours respectively its quantity. Performance
based equipment - mostly very expensive single equipment are send out to a construction
side via a shipping document (for tracking), but parallel to this a performance based
equipment document (PBE document) is entered to control the usage of single equipment. A
typical performance based equipment is an excavator.
The performance based equipment process starts analogue to the time based equipment process
with an equipment request of a project manager or foreman. He needs an excavator with a
certain specification (e.g. Power 50 kW) for a certain period. The project manager can either
enter an ETM requisition note directly by himself or he calls the equipment
manager/administrator (responsible for all equipment) and he than will enter the requirement
in the system. After the equipment manager has assigned the request to an equipment, it will
be send to the project.
Daily or weekly depending on organization rules - the performed equipment hours are entered
via a PBE document to the project/recipient. After all PBE documents for the period have
been entered, the settlement can run, which will recognize, that beside the shipping
document for the same time a PBE document exists and would treat it dependent.
After the settlement list has been created and checked for its correctness through the project
manager or foreman the billing run takes place.
Scenario Overview
Detailed Process Description:
Non-Consumable Material Process
This business process is used if standard material, called non-consumable material e.g. site
facilities, ladders etc. has to be shipped from a warehouse to a recipient (debtor master with
enhanced ETM view) together with equipment in one ETM shipping document or has to be
taken out of a magazine
In both ways, non-consumable material is given back to the magazine or the warehouse via ETM
shipping document after it has been used. This saves time and costs for transports and
administrative effort. Magazines are a kind of little project warehouses on big construction
sites/projects.
The process in ETM is called sales and repurchase of non consumable material to and from a
recipient/project - to and from a warehouse. This means, construction sites buy non
consumable material for a fixed price and after the non consumable material is given back to
either the magazine or the warehouse a reduced value will be credited to the project
(automated repurchase process).
When the periodically settlement takes place, projects get debited for the received material and
credited for the returned material. So the project pays a kind of provision fee for the usage of
the material.
Generally the settlement of non consumable material is based on quantity and not on the time
period like time based equipment!
The cost charging and automated repurchase of non-consumable material is fully automated
handled via ETM!
Scenario Overview
Detailed Process Description:
Consumable Material Process
This business process is used for shipping standard material, called consumable material (e.g.
concrete or nails) together with equipment in one ETM shipping document to reduce
transport- and handling costs for projects in construction industry.
The cost charging is done by SAP standard Sales and Distribution (SD) and Material
Management (MM). ETM only overtakes - logistically seen - the delivery of consumable
material.
No settlement takes place in ETM for consumable materials!
Equipment
Request
Create
Requisition
Note
Create
Acquisition
Shipping
Document
Assign
Equipment
and Create
Shipping
Document
Return
Equipment to
Construction
Yard/Warehouse
Display
Billing
Document
Create
Billing
Document
Display
Sales
Order
Internal Settlement
CEM Sales
Order
Settlement
Cost
Allocate
Check Log
for CEM
SD
Settlement
Display
Sales
Order
External Settlement
Create
Billing
Document
Display
Billing
Document
Run Time-Based
Equipment Process
(in this scenario)
End
Process
Yes
Create
Requisition
Note
Equipment
Available?
No
Create Purchasing
Requisition for
Rental Equipment
Convert Purchase
Requisition to
Purchase Order
Invoice
Verification
Create
Equipment
Create
Equipment
BOM
Equipment
Request
Create ETM
Requisition
Note
Assign
Requisition
Note to
Equipment
Create
PBE
Document
Check
Document List
for PBE
Display
Billing
Document
Create
Billing
Document
Display
Sales
Order
Create
Sales
Order
Internal
or
External
Cost
Allocate?
Check Log
for CEM
SD
Settlement
Display
Sales
Order
External Invoice
Create
Billing
Document
Display
Billing
Document
Project
Manager
ECO
Warehous
Event
e Clerk
Initial Stock
Posting for
NonConsumable
Material
Stock
Overview in
MM
Current
Stock for
Material In
ETM
Internal
Stock
Overview in
MM
Create First
ETM Shipping
Document for
Acquisition
Internal
or
External
Sales?
Display
Shipping
Document
Sales
or
Repurc
hasing?
Stock
Overview in
MM
Current
Stock for
Material In
ETM
Check Log
for CEM SD
Settlement
Create
Sales Order
Display
Shipping
Document
Current
Stock for
Material In
ETM
External
Display
Sales
Order
Display
Sales
Order
Create
Billing
Document
Create
Billing
Document
Display
Billing
Document
Display
Billing
Document
Internal or
External
Repurchase
?
Internal
Display
Sales
Order
Create
Billing
Document
Display
Billing
Document
Display
Sales
Order
Create
Billing
Document
Display
Billing
Document
External
Initial Stock
Posting for
Consumable
Material
Stock Overview
in MM
Current Stock
for Material In
ETM
Stock Overview
in MM
Create ETM
Shipping
Document for
Acquisition
Display
Shipping
Document
Current Stock
for Material In
ETM
Legend
<Function>
Symbol
Description
Usage
Comments
Role band
contains tasks
common to that
role.
Symbol
Diagram
Connection
Description
Usage Comments
External
to SAP
Business
Activity /
Event
Connects two
tasks in a
scenario
process or a
non-step event
Does not
correspond to a
task step in the
document
SubProcess
Reference
Proces
s
Decisio
n
Financial
Actuals
Budget
Planning
Unit Process
Process
Reference
Hardcopy /
Document
Corresponds to
a task step in
the document
Corresponds to
a task step in
the document
Corresponds to
a task step in
the document
Does not
usually
correspond to a
task step in the
document;
Reflects a
choice to be
made after step
execution
Manual
Proces
s
Existing
Version /
Data
System
Pass/F
ail
Decisio
n