Exam highlights
The exam is a comprehensive one (design,
management, concrete technology, soil mechanics,
infrastructure, tests, reinforcement)
Full of Varity (multiple choices, calculations,
qualitative and quantitative questions, drawings)
but mostly implementation based.
Academic, real cases, and case studies
Contracts and claims
Exam highlights
Design is classic.
Settlement and deflection, failure shape.
Management questions are mostly related to time
schedules and Gantt chart.
Concrete technology & tests: mixes, w/c, mostly
related to implementation (cast, shuttering,
support, vibration, curing,. Tests: cubes, Schmitt
hammer, load test, core test, & slump.
Exam highlights
Reinforcement: tests, spacing, hocks, cross-section
limitations, cover limitation.
Soil: types, bearing capacity, compaction, collapse
angles, water table and content.
Foundation & retaining walls: types, design, overturning, sliding, discharge.
Infrastructure: roads, survey, compaction water &
wastewater piping, excavation. Tests: marshal and
CBR.
Exam highlights
Reinforcement: tests, spacing, hocks, cross-section
limitations, cover limitation.
Soil: types, bearing capacity, compaction, collapse
angles, water table and content.
Foundation & retaining walls: types, design, overturning, sliding, discharge.
Infrastructure: roads, survey, compaction water &
wastewater piping, excavation. Tests: marshal and
CBR.
Exam highlights
Contractual questions: guarantees types, insurance,
tender documents, special & general conditions,
measurements, disputes & arbitration, claims.
Tender documents priorities & order in case of
contradiction (drawings & details, specifications, BOQ).
Various questions
In case of cube results failure 7 or 28 days, standard
deviation, what would be your action? In case of core
test failure?
Difference between calendar/working days.
A contractor fail to do proper curing
A contractor not committed to proper inspection &
approval (e.g. cast with no approval).
A contractor dismantled slab support before time?
Can you terminate a contractor?
Can you suspend a contractor?
How to deal with a slow performing/delayed contractor?
Aggregate specifications.
Various questions
Level percentage of error?
Checking a pipeline without survey
device
Internal water piping checking
Drop manhole
Maximum and minimum slopes for
sewage pipes with justification.
Areas
calculation
(sphere,
triangle,..etc).
Word of advice
Time management
Do not start with design questions
Do not panic
Multiple choices are very tricky