Documente Academic
Documente Profesional
Documente Cultură
WABU 2015
Contents
About Us
iCell Background
iCell Introduction
iCell Case Study
Development History
- No1 shipment of LTE Small Cells in China
- Small Cell deployed in Romania & Pakistan
- Supplies solutions for World Cup Brazil and Sochi
Winter Games
2014
2012
2010
2006
2004
China
Pakistan
Romania
Interoperability
4G
System
CS
FB
2G/3
G
Contents
About Us
iCell Background
iCell Introduction
iCell Case Study
Rollout
Operatio
n
High Speed
& Ubiquitous access
Cost effective
in-building solution
Improve user
experience
Increase data rate
Increase spectrum
efficiency
Especially indoor
users
Ubiquitous Coverage
High Speed Access
Easy Site Acquisition
Fast Rollout
End to end
monitoring and
management
Small
80%
5%
15%
m2
Small: <3000
Medium:
3000~4500
m2
m2
Contents
About Us
iCell Background
iCell Introduction
iCell Case Study
Campus,
Commercial
Buildings
iCell
IP
PON/PTN
/ Ethernet
E-iCell
IP-Based Backhaul
(PON/PTN/TV Cable/Satellite )
Firewal
l
Gatewa
y
NMS
EPC
OSS
Flexible
Backhaul
Coverage
Extension
PON
PTN
ADS
L
Etherne
t
Ubiquitous
Coverage
Coverage
Access
Speed
Fast
Rollout
$/m2
Network
Utilization
E2E
Managemen
t
E-iCell Architecture
E-iCell
iCell
Full function unit of eNB, Baseband + RF + Antenna
Supports 96 active users and 288 connection users
DP(Distributed Part)
Mini RRH integrated with dual polarized antenna for
MIMO 2T2R
Active device: RF power software controllable, POE
Multi mode selectable, TDD-LTE/FDD-LTE
Multi band selectable
iCell
Fiber
Cat5e
(POE)
DP
CP(Convergence Part)
CP
DP
DP
Application
Cat5E roll out, easy site acquisition
High flexibility for small to medium scenarios
Passive System
MIMO
VS
Single high power
Multiple low
PA
With passive
heads
antenna
Low
P=13dBm
TX Power_DP1
13 dBm
Deployment
Connection Auto Detect
POE, Plug and Play
OK
Traditional DAS
V
S
P1
Link Budget
Power Distribution
Passive Device Connection
P2
P1=A-B-???
P2=A--???
IP
Backhaul
Building #1
DP_1
DP_2
IP
Backhaul
DP_3
DP_4
iCell
3F
2F East Wing
4F East Wing
nodes
RAN end to end management:
Product Overview
E-iCell
iCell O&M
KPI Report
Gateway
Gateway O&M
Security
NMS
AAA O&M
Failure
Detect
Product Introduction-iCell
LTE iCell
SFP
(IP
Backhaul)
Ethernet
Extension Port to
DP x 4
SFP
Extension
Port to CP
Operating
Frequency
LTE Output Power
Supported Users
Extension Port
Mobility
Ethernet (IP
Backhaul)
Local
Managemen
t
Synchronization
2300MHz-2370MHz(TDD)
(Frequency/FDD mode can
be customized)
2 x 125mW MIMO
96 active users and 288
RRC users
4 x 1Gbps RJ45 Port to DP
1 x SFP Port to CP
Handover & reselection with
Macro Cell and other Small
Cells
1588v2
GPS/A-GPS
Interception synchronization
(Radio listen/ Sniffer)
Product Overview-DP
DP(Distributed Part)
Operating Frequency
2300
(Frequency & Mode can be
MHz~2370MHz(TDD)
customized)
LTE Bandwidth
5/10/15/20MHz
2 x125mW MIMO 2 x
LTE Output Power
2
Interface
2 x 1Gbps RJ45 Port
POE power supply
Ethernet Port to
Extension Small Cell
or CP
Reserved
Port for CA
Product Overview-CP
CP (Convergence Part)
SFP Port 1
Optical port
To Source Donor1
SFP Port 2
Optical port
To Source Donor2(CA or cell splitting)
SFP Port 3
Optical port
To Relay CP, Support up to 4 CP
Daisy Chain
SFP4
Reserved Port
LMT port
Local management port
ETH1~ETH8 8 x1 Gbps RJ45 Port To
Extension Ports
SFP Port to
SFP Port to
DP
Ethernet Extension
Source
Relay CP
Ports x 8 To CP
Donor
Reserved
Local
Management
Cat5e(POE
)
Extend Coverage
CP1
ore
nd M
Exte 32 DP
o
Up t
Backhau
l To
ECP/GW
CP2
CP3
CP4
DP x 8
DP x 8
DP x 8
DP x 8
CP1
Cell
Splitting
CP2
CP3
1
1
CP4
Cell1
Cell2
DP x 8
DP x 8
DP x 8
DP x 8
Contents
About Us
iCell Background
iCell Introduction
iCell Case Study
Librar
y
Shopping
Mall
Super
Market
Hotel
Departme
nt
Solution
MIMO DAS is hard to deploy
1 * iCell + 3* DP ;
Rollout
PTN
Backhaul
Ceiling
Mount
Wall Mount
Wall Mount
Ceiling Mount
Continue(Case 1)
TES
T
P1
P2
P3
RSRP coverage
Speed test
TDD-LTE
FTP
FTP
RSR
UL
DL
P
(Mbps (Mbps
)
)
-65 8.50 93.39
-87
4.2
56.5
-73 7.56 81.3
Range
[-140,110]
[-110,100]
[-100,90]
[-90,-80]
[-80,-70]
[-70,-60]
[-60,-40]
Interoperability with
PDF%
0.00%
Cell reselection
with macro cell
Macro
cell
0.00%
100.00%
Attempted time
9.14%
22.59%
32.82%
25.00%
10.46%
20
CSFB
Successful
rate
100%
Latency
0.047
Successful
rate
100.00%
4G->2G
1
2
3
4
5
Requir
ement
2G->4G
Call
established
latency(s)
Return to 4G
6.5
6.4
6.7
6.3
6.8
1.1
1
0.9
1.2
1.3
7.1
7.2
7.1
7.3
7.2
1.1
0.9
1.6
1.2
1.5
10s
10s
latency(s)
Call
Return to
Established 4G
latency(s) latency(s)
Application Scenario
1300 /floor
Features:
Wi-Fi interference
Multiple dorms
High capacity
requirement
6 floors with
denseusers
6 * iCell + 24* DP
Cell Spilling in each Floor
Design Throughput = 100 * 6 =600
Mbps
Rollout
Ceiling &
POE
Backhau
GPON
l
Front haul
Cat5e
Continue(Case 2)
3F
2F
user experience
Cell reselection/handover, CSFB works well
Application Scenario
Site Info: Government
Building
Coverage : 4 Floors *
700 @ 100 users
Features:
IBS construction is not
allowed
Multiple wall and
barriers
Poor 4G signal cause of
wall barriers
Weekend deploy only
1 iCell + 2CP + 10 DP
GPON backhaul
Cat5E, Wall/Ceiling mount, PoE power
Gateway Deployed
connecting between GPON
to EPC
supply
iCell
CP
DP
1F
2F
CP
1
DP
3F
1588V2
Synchronizatio
n
4F
CP1 deployed in
1F
CP2 deployed in
3F
(weak current
well)
Smart footprint DP
PoE Connection
Only
Continue(Case 3)
LTE RSRP and Throughput
1F
3F
Distance
to DP
Near
Middle
RSR
P
67.9
85.8
93.0
RSRQ SINR
-9.9
31.7
-9.9
27.9
RSS
I
38.0
55.7
62.8
FTP DL
(Mbps)
Distance
to DP
95.08
Near
93.75
Middle
RSR
P
72.9
88.4
96.3
Far
-9.9
23.5
85.25
Far
Easy landlord negotiation: Wi-Fi footprint devices (DP)
RSR
Q
SINR
RSSI
FTP UL
(Mbps)
-6.0
34.4
-46.8
7.9
-6.0
25.4
-62.0
7.8
-6.1
15.2
-70.0
7.7
Finished all the deployment within 2 days (Weekend ) with full MIMO LTE
indoor coverage
Savings Summary
Passive
Passive
components
components is
is
70-75%
70-75% less
less
Project
Project arrangement
arrangement
and
and design
design are
are 252530%
30% less
less
Wi-Fi
Wi-Fi footprint
footprint Vs.
Vs. Radio
Radio equip
equip
Difference
Difference in
in site
site surveys,
surveys, site
site
2000M
2000M Cat5e
Cat5e Vs.
Vs. 4200M
4200M
RF
RF Cable+
Cable+ 70
70 Splitters
Splitters +
+
acquisition,
acquisition, landlord
landlord
negotiation,
negotiation, rollout
rollout time
time
55
55 Antenna
Antenna +
+ 65
65 Coupler
Coupler
Labor
Labor is
is 70-85%
70-85%
less
less
IT
IT Vs.
Vs. RF
RF
Cat5E
Cat5E Vs.
Vs. Coax
Coax
OPEX
OPEX Savings
Savings
Smaller
Smaller space
space
Energy
Energy saving
saving
Remote
Remote control
control &
& monitor
monitor
GUI
GUI &
& Web
Web based
based
maintenance
maintenance
End
End to
to end
end management
management
THANKS!
Satellite
-Routing-transfer
EPC
-Network aggregation
-IP Sec IKEv2
-Mutual authentication (bidirectional
authentication)
-Efficient Packet Filtering
-Integrity protectionand ciphering
-Network Attack Detection and Defense
Appendix-Gateway Introduction(Signaling
Gateway)
Efficient
Network Convergence:
Up to 256 S1 links can be combined as 1
Resource saving: MME Signaling and Data compressed
1 S1 link
256 S1 links
Without
With
Improvement
100
100
100
100
10.55
10
10.44
10
89.45%
90%
89.56%
90%
*Assumptions : MME Pool with 6 MME inside; Each cell serves 32 users at the same time