Sunteți pe pagina 1din 41

Presentation for 3G project

for Nokia Siemens

Eng Arabi

Flexi BTS (3G)


The basic ingredients of the cabins:

1- Flexi System Module (FSME).


2- Flexi transmission (FTIB).
3- Flexi Radio Frequency (FRGB).

Note:
dyed red letters dating back to Version

Eng Arabi

3GFlexi System Module(FSME)

Eng Arabi

FSME

Eng Arabi

FTIB
Interface :
4 x E1/T1/JT1 balanced.
2 x 10/100 Mb Ethernet.
1 Optional GbE interfaceSFP
(available later).

Connector Type :
E1: 1X RJ48 Per IF.
Ethernet: RJ45.

Basic Functionality:
2xE1/T1/JT1portsactivated .

Licensed Features :
Activation of Ethernet port .
Activation of E1/T1/JT1 ports
3&4.
IMA.

Eng Arabi

FPFA Interfaces

Eng Arabi

DC Input Connector

Eng Arabi

RFModules
Flexi Radio Frequency (FRGB)

Eng Arabi

maximum hardware configuration

Eng Arabi

Preparing modules for


installation
1.Fix the safety catch.
2.Fix The module back cover with two screws.
3.Fix the two external cable entries with four screws. (Do not install the System Module
cable entries yet).

Eng Arabi

Grounding the BTS


1.Ground the plinth to the site main ground.
2.Connect the wrist strap.
3.Install the first module.
4.Connec the grounding cable to the module front panel.
5.Route the grounding cable through the cable entry.
6.Connect the other end of the cable to the plinth.
7.Repeat steps 3-6 with all the modules.

Eng Arabi

Installing the transmission


sub-module

Eng Arabi

Installing the power feed

Eng Arabi

Installing the modules

Eng Arabi

Photos of the site

Eng Arabi

Eng Arabi

Eng Arabi

Eng Arabi

Eng Arabi

Eng Arabi

Eng Arabi

Eng Arabi

Nokia Flexi Node B WBTS


Commissioning Quick Reference Guide
Information needed from Optus:
1) BTS ID
2) TRS (AXC) IP address and Subnet mask
3) BTS (MWAM) IP address
4) Gateway (SAXC) IP address
5) RNC IP address
6) NTP Server IPaddress
7) VLAN ID
8) STCP
9) Cell ID
10)IUB NB
11)IUB GW
12)BTS
13)Far end
14)TOP
15)RET
16)SCT Port
Eng Arabi

Before connecting to WBTS, change


laptop IP address as follows
Start menu => Settings => Network and dialup
connections
Right click Local Area Connection => Properties
Highlight Internet Protocol (TCP/IP) and click
Properties
Select Use the following IP address
Input these addresses
IP
192.168.255.130
Mask 255.255.0.0
Gate 192.168.255.129
Click OK then restart Laptop
Eng Arabi

Launch BTS Site Manager

Click Connect (user name and


password NOT required)
User name: Nenuadmin
Password : nemuuser

Eng Arabi

Update BTS Software


Select Software => Update SW to BTS Site
Click Select File
Browse to location of
TARGETBD_WNxxxxxxxx (latestversion)
Highlight this file and click Open
Tick Activate SW after update
Click Update
This will take up to 20 minutes, if the download
fails update again.
Click Close to return to main screen
Eng Arabi

Commissioning
Before starting ensure that all the
relevant information from Optus is
available
Click Commissioning on side bar
(this will start wizard)
Select Target BTS Site and
Commissioning type Manual =>
Next Define Site Properties
Follow the images that came
down

Eng Arabi

Eng Arabi

Update SW to BTS

Eng Arabi

The first step change IP

Eng Arabi

Select Interface Type E1 or


Ethernet

Eng Arabi

VLAN ID

Eng Arabi

Far end SCTP

Eng Arabi

Default gateway

Eng Arabi

BTS name & FSME1,2

Eng Arabi

Cell ID

Eng Arabi

Cell ID First Carrier

Eng Arabi

Cell ID second Carrier

Eng Arabi

Cell ID Third Carrier

Eng Arabi

UARFCN
( 10838,10788.10813)

Eng Arabi

Save Parameter

Eng Arabi