Inspection services
objective
To ensure that contractors conform
completely with engineering
specifications and quality plans so that
the Quality equipment/Product is
delivered for Power Generation as a
result tangible & and intangible losses
are kept to a minimum.
INSPECTION DEFINED
Two definitions currently in use are:
A static analysis technique that relies on
visual examination of development
products to detect defects, violations of
development standards, and other
problems.
An inspection is a formal review of a work
product by the work product owner and a
team of peers looking for errors,
omissions, inconsistencies, and areas of
confusion in the work product.
INSPECTION SERVICES
CIS
RIOS
DELHI
MUMBAI
CHENNAI
KOLKOTA
HARDWAR
BANGLORE
HYDERABAD
RANIPET
TRICHY
TRIVANDRUM
BARODA
BHOPAL
DEFINITIONS:
QUALITY PLAN:
A Document setting out the specific Quality
Practices and Procedures relevant to a
particular item, component or material in
prescribed format.The QP is prepared by the
contractor or subcontractor and subsequently
finalised and approved by Quality Assurance
Department.
INSPECTION ACTIVITIES
RECEIPT OF INSPECTION CALL
IN INSPECTION CALL FORMAT
Check the availability of
1-QP/CHECK LIST
2-DRAWING/DATASHEET
3-PO Copy if site purchase order
PHYSICAL INSPECTION
-Inspect Material as per approved QP.
-Identify the material.
-Issue CHP report
-Issue MDCC, if no Hold point in CHP.
PLAN INSPECTION
-On first Day of Every week, Inspection Call
assigned to inspection Engineer.
-Weekly inspection schedule prepared (GRID).
-Inspection calls Loaded to Floppies of Inspecting
Engineers as per GRID.
-Generation of Various monitoring report.
-Issue of reminder Letters through software.
INSPECTON CATEGORIES:
CAT 0 - STAGE INSPECTION
CAT-1 - Where as per QP/ICL physical inspection witness by NTPC is
envisaged.
CAT-3- Where the item is not covered in QP/ICL but covered in BBU and
inspection is by the Main Contractor/Sub contractor or Manufacturer a
certificate of conformance(COC) should be furnished as per the
prescribed format.
DISPOSAL CODES
DISPOSAL_CODE
DISPOSAL_DISCRIPTION
ACTIONBY
A
ITEM IS NOT READY/ FRESH INSPECTION CALL TO BE GIVEN
B
REWORK /FRESH INSP CALL,WITH COMPLIANCE TO BE GIVEN
VENDOR
CE INSP NOT UNDERTAKEN FOR WANT OF ENGG DOCUMENTS
ENGG
CQ INSP NOT UNDERTAKEN FOR WANT OF QA DOCUMENTS
CQA
D
CALL CANCELLED BY VENDOR
VENDOR
E
MATERIAL IS REJECTED VENDOR
F
INSPECTION CALL INCOMPLETE, RETURNED TO MAIN CONTRACTOR
G
CLOSED IN ABSENCE OF RESPONSE/CLARIFICATION FROM VENDOR/SITE
J
MATERIAL ACCEPTED MDCC ISSUED
JC
ACCEOPTED,CONDITIONAL MDCC,AS ADVISED BY CONTRACTS
CC
JE
ACCEOPTED,CONDITIONAL MDCC,AS ADVISED BY ENGINEERING ENGG
JP
ACCEOPTED,CONDITIONAL MDCC,AS ADVISED BY PROJECT
PROJ
JQ
ACCEOPTED,CONDITIONAL MDCC,AS ADVISED BY CQA
CQA
JX
ACCEPTED CONDITIONAL MDCC ISSUED
K
STAGE INSPECTION ACCEPTED MDCC NOT APPLICABLE
L
ACCEPTED MDCC NOT APPLICABLE
P
CALL PERTAINS TO OTHER RIOS, REDIRECTED
RIO
S
DUPLICATE CALL
RIO
XF ACCEPTED SUBJECT TO APPROVAL OF DEVIATION VENDOR
XG ACCEPTED SUBJECT TO COMPLIANCE VENDOR
XH
MAT INSPECTED, ACCEPTED SUBJECTED TO BBU APPROVAL
CC
XI
ACCEPTED, SUBJECT TO TYPE TEST APPROVAL BY ENGG
ENGG
XM CALL PENDING/NOT DUE
XQ INSPECTION ATTENDED TESTING CONTINUED FOR LONG DURATION TEST
XR ENGINEER DEPUTED REPORT AWAITED
RIO
XT PARTIALY INSPECTED FURTHER INSPECTION REQUIRED
RIO
XX ENGG DOCUMENTS NOT APPROVED IN CAT-I ,MDCC WITHHELD
ENGG
XY ANY CONDITION NOT COVERED ABOVE
XZ AQP / ICL NOT APPROVED IN CAT--I, MDCC WITHHELD
CQA
VENDOR
RIO
DISPOSITION OF NON-CONFORMAITY
NON-CONFORMITY:
requirement.
CORRECTIVE ACTION:
REPAIR:
REWORK:
NON-CONFORMITY REPORT:
Formal request from contractor to deviate from a
specified quality requirement in NC-Format.
DISPOSITION OF NC:
Action to be taken to deal
order to resolve NC.
with existing NC in
NC CATOGARIES:
CAT-A: MAJOR NC-Reviewed & Disposed by CQA.
CAT-B: MINOR NC- Disposed by HEAD-RIO.
MONITORING REPORTS
1) EXCEPTION REPORT
2) STATUS REPORT
3)SUMMARY REPORT
DOCUMENT CONTROL
TYPE OF FILES
1) PACKAGE
2) MDCC
3)REFERENCE
4)WEEKLY PLANNING
5)EXCEPTION