Objective
1.
2.
To accustom ones self with bad effects of not following the safety procedures explained by
lecturer and instructor
3.
To understand the schematic diagram explained and demonstrated by lecturer and instructor
4.
5.
6.
7.
8.
To be able to install the bulb outlet and attach the significant wires on the distribution boxes
9.
10.
11.
12.
Introduction
Scope of task
Accustom ones self with bad effects of not following the safety procedures explained by the
lecturer
Installing the bulb outlet and attach the significant wires to the distribution box
Installing a switch
Controlling the brightness of the bulb using the installed regulator previously installed
PROCEDURE TASK
1.
On the first day we learn about the introduction Electrical Wiring Installation and we exposed to
earthing and protection in wiring.
2.
Then, we learnt on how to understand the schematic diagram fro practical installation
3.
There are three types of wires that were exposed from lecturer
4.
The main task on the first day is student need to install the distribution box that contains mains
switch, RCO and MCB. Each of respective terminal got their own function.
5.
The continuity is checked by using a multimeter after all the wires are re-tighten
6.
7.
8.
Conduit are screwed into the wall and all the wires were placed inside it
9.
Distribution board that already screw onto the wall are connected to the conduit of the bulb
installation
10.
11.
Continuity were checked before the current suplly is turn on to make sure the bulb is light up
L1
50CM
30CM
60CM
DISTRIBUTION
BOARD
50CM
S1
12.
13.
Another conduit were cut(same as second day) and screw up in the wall. 3 main wires are
placed inside it
14.
Installing the fluorescent lamp, were required to install fluorescents lamp sockets
15.
16.
the wire from the socket are connected with 6MCB of terminal
L1
L2
60CM
DISTRIBUTION
BOARD
30CM
S1
SWITCH
OUTLET
17.
18.
19.
20.
21.
The live wire from the distribution box installed in latched the common slot inside one way
switch
L1
50CM
30CM
Load
60CM
DISTRIBUTIO
N BOARD
50CM
Regulator
Fan Regulator
C
L
1
S1
S1
11.
Conduits
12.
Switch(one way)
13.
Sockets
2.
Cutter
3.
Screwdriver
14.
4.
Screw
15.
Spring
5.
Test pen
16.
Fluorescent lamp
6.
Multimeter
17.
Fluorescent socket
7.
3 pin plug
18.
Measuring Lamp
8.
19.
Fan Regulator
9.
Bulb
10.
Bulb holder
Safety Steps
Dont help your friend who were electrocuted with your hand, instead use an
insulator
Always make sure dangerous tools like the wire cutter are properly handled to
avoid any injury
Dont put the tools carelessly, without considering the possibilities of getting
injured
Conclusion
The end of the module I have.
The correct way to install the distribution box while obeying the safety
procedures I have learned earlier
The correct way to install a fluorescent lamp socket and 3 pin plug socket
The correct way to install a regulator for a bulb and the correct installation of