Sunteți pe pagina 1din 21

SUMMER INTERNSHIP

PROJECT 2015

GUIDELINES

INTRODUCTION
Very important for Management Education
To undertake live project during 2 months ( 1
May to 30 June )
Carries 100 marks weightage
To undergo rigor of professional environment
Industry Mentor from Company
Faculty Guide from Institute

OBJECTIVES OF SIP
To

bridge the gap between


Industry & Institution
Sensitize students to rigor &
naunces of a work place
Opportunity to apply concepts
learned in real life situations
Opportunity to network useful for
career prospects
Durgadevi Saraf Institute of
Management Studies

ASSIGNMENT

Preferably in the domain of Students interest

To be of direct interest to the host organization

Industry Mentor helps to select


project/assignment

Do consult Faculty Guide

Individual assignment for each student

No team assignment

STUDENT FACULTY INTERACTION

Student reports to Faculty Guide regularly

On mobile, through email, personal meeting through


appointment

Faculty interacts with Industry Mentor and monitors


students progress

Ms Pooja Goswami (pooja.goswami@dsims.org.in ) will


be the central Coordinator for SIP activities. Students
should mark copy of correspondence/ report etc to her
in addition to Faculty Guide.

STUDENT MENTOR INTERACTION

Get help from Industry Mentor to identify


suitable assignment

Interact regularly with Industry Mentor for


guidance, suggestions for project

Industry Mentor is Project Supervisor and


evaluates students progress

Student to be well prepared for formal


meeting with Industry Mentor

ATTENDANCE

100% attendance during SIP compulsory

To follow timing of host organization as


directed by Industry Mentor

For emergency reasons, apply for leave to


Industry Mentor

Keep Faculty Guide and SIP coordinator of


Institute fully in picture

CONDUCT AND BEHAVIOUR

Conform to rules and regulation of host


organization

Dress formally during SIP

Be punctual, regular & obedient at work

Strict disciplinary action against misconduct,


indiscipline, unprofessional behavior

STUDENT OBLIGATION
Before SIP:

Familiarize with respective Company from


all sources

Prepare approach paper for assignment &


discuss with Faculty Guide

Contd..
During SIP:

Report to Industry Mentor regularly on


appointed time, formally at least once a week

Follow deadlines for submission of report

Maintain daily Log Book at least a page


everyday and get initialled by Mentor
periodically. Log Book to be submitted to
Faculty Guide.

Interact with Faculty regularly

Contd..

At end of SIP:
Submit Project Report to Industry Mentor
Request Mentor to complete evaluation and
send directly to DSIMS coordinator
Consult Faculty Guide, complete final bound
report and submit to Faculty and DSIMS
coordinator within one week from completion
of SIP
Attend Seminar & Viva for final evaluation

SIP EVALUATION

Evaluation by Industry Mentor & Faculty


Guide

Periodical evaluation during SIP followed by


seminar & viva

Final evaluation to consider:

Organization & execution of Project Plan


Project Scope & level of difficulty
Validity of Conclusion
Quality & thoroughness of Final Report
Performance in Seminar & Viva

MILESTONE FOR SUBMISSION


OF SIP REPORT
Milestone

Deadline

Marks

Initial
Information
Report

8-05-2015

Project Proposal- 14-05-2015


Interim

Project Proposal- 20-05-2015


Final

15

Interim Report

13-06-2015

15

Final Report

27-06-2015

20

Seminar & Viva

40

Total

100

ROLES AND OBLIGATIONS: INDUSTRY


MENTOR
To

support the students to complete the project by providing

advice and feedback at appropriate time.


To

confirm to DSIMS that the Project is the students own work

and has been completed to his/ her satisfaction.


To

encourage the students to think about operational/ efficiency

issues which help the students to identify a project of interest.


To

assist and guide the student during SIP, data analysis and

subsequent inferences.
To

submit midterm progress report and end term evaluation.

FACULTY GUIDE
To

provide direction on application of domain

competencies to the Project


To

assist in finalizing Project proposal and

developing Project plan.


To

visit & interact with the student and

Industry mentor in the host Organization


during SIP ( one visit reqd ).
1st

visit: From 8th to 18th May 2015

Tele

contact/2nd visit: From 15th to 24rd

June 2015

10 . Data Collection
11. Data Analysis
12. Key Findings
13. Conclusion & Recommendations
14.Attachments
15. References.

Durgadevi Saraf Institute of


Management Studies

IMPORTANT POINTS FOR ACTION


Those

not yet placed ( debarred,


self arrgmt. ) to meet Ms Priyanka
immediately
Girl Students to meet Prof Beena
Prakash
Mail to respective Faculty Guide
& Coord Initial Information Report
by 9 May without mail.
Maintain Daily LOG BOOK
Durgadevi Saraf Institute of
Management Studies

THANK YOU
ALL THE BEST !

S-ar putea să vă placă și