Content
Conclusions
2
Technical
Support
Training
Mix Design
Production
Construction
Laboratory mix
design and
performance tests
should be
conducted at well
equipped
laboratory.
Mixing and
producing
temperatures
should be controlled
accurately at
asphalt plant.
Paving and
compacting process
should be proceed
with proper
temperature.
1. Traffic Loading
2. Environment Loading
3. Inappropriate Materials
4. No Quality Control of
Pavement Construction
Stripping
Thermal Crack
Korea
Mongolia
Surface Layer
5cm
6cm
3cm
Surface Layer
Intermediate Layer
4cm
Base Layer
Base Layer
15cm
Crushed Aggregate
Crushed Aggregate
30cm
18cm
No QA/QC
Polymer-Modified Asphalt
Polymer-Modified Asphalt Mixture
Polymer-Modified Asphalt
+
Asphalt
+
Polymer
=
Aggregate
Polymer-modified asphalt
coats aggregates to
enhance adhesion
Polymer-modified asphalt is
a composition of bitumen
and polymer
Asphalt
Polymer
Aggregate
Aggregate
9
9
PG 70-34
Polymer-Modified Asphalt
PG 58-28
Unmodified Bitumen
-50 -40
10
20
30
40
50
60
Temperature C
10
70
80
Plastic Deformation
(Rutting)
Low Temperature
Cracking
PMA Pavement
Polymer-Modified Asphalt
Unmodified
Asphalt
Polymer-Modified
Asphalt
Hot-Mix
Hot-Mix Asphalt
Asphalt Pavement
Pavement
Production
Temperature
Construction
Temperature
180C
180C
160C
160C
140C
140C
120C
100C
80C
Production
Temperature
Construction
Temperature
13
120C
100C
80C
WARM
WARM
HOT
HOT
14
Temperature Monitoring
Temperature (C)
Time (min)
WMA Pavement
5 hrs 20 min
HMA Pavement
7 hrs 30 min
15
200C
Hot-Mix
Asphalt
Warm-Mix
Asphalt
180C
1st
2nd
3rd
Compaction
Compaction
Compaction
160C
140C
1st
120C
100C
2nd
1st
80C
3rd
2nd
60C
40C
20C
Not
compactable
Not
compactable
3rd
Better workability
and
comapctability
16
10
11
12
LEADCAP Family
LEADCAP-B
(Base)
LEADCAP-M
(Modified)
LEADCAP-A
(Advanced)
18
Heavy Traffic
Traffic Loading
Construction Defect
Quality Control &
Quality Assurance
Thermal Crack
Mitigate thermal cracking
Rutting
Improve rutting resistance
Overall Damage
Manage temperatures
Warm-Mix Asphalt
19
PMA
N2 Polymer
N4 Polymer
WMA
LEADCAP WMA additive
Improving
engineering
properties,
particularly, crack
resistance at low
temperature and
rutting resistance at
high temperature
Improving
workability
Providing better
compaction on the
road and the ability
to haul paving mix
for longer distance
Extending the paving
season by being able
to pave at lower
temperature
20
Ductility
Viscosity
22
19.97
19.97 20.46
20.46
-- 1515- 1
1
48.4
48.4
19.83
19.83 20.06
20.06
-- 15
15
g
g
b
b h
h (( )
)
48.28
48.28
48.57
48.57
N
N
384.40
384.40
297.10
297.10
326.60
326.60
336.03
336.03
5.78
5.78
4.27
4.27
4.68
4.68
4.91
4.91
d
d (( )
)
M
MP
Pa
a (( N
N /
/))
))
((
5.77
5.77
4.46
4.46
4.90
4.90
5.04
5.04
(
( ))
1.21
1.21
1.19
1.19
1.15
1.15
1.18
1.18
64.70
64.70
63.43
63.43
61.24
61.24
63.12
63.12
(W
> 400
(W ))>
400
kP
kP a
a
6994.88
6994.88
5300.17
5300.17
5625.28
5625.28
5973.44
5973.44
(S
(S )<
)< 100
100
M
MP
Pa
a
4.77
4.77
3.59
3.59
4.07
4.07
4.14
4.14
Low Temp.
19.78
19.78 20.58
20.58
-- 1515- 2
2
A
r.
Av
vr.
WARM
PMA
Bitumen
Rem
Remarks
arks :: SBS13%
SBS13% -- 15
15
Unmodified
Bitumen
PWMA
Bitumen
Unmodified
Bitumen
Deformation (mm)
34
28
High Temp.
Force
(MPa)
58
PG 58-28
70
PG 70-34
Performance Grade
Flexibility
23
2012
2013
South
Gobi Road
UKHAA KHUDAG
GASHUUN SUKHAIT
Project
Site
Ulaanbaatar City
Road
Ulaanbaatar City
Road
Project
Site
Project
Site
24
South Gobi
Ulaanbaatar
OAC(%)
Air Void(%)
OAC(%)
Air Void(%)
HMA
(Unmodified asphalt)
5.2
4.3
HMA
(Unmodified asphalt)
5.2
4.3
PWMA-1
5.2
4.0
WMA (LEADCAP)
5.2
4.0
PWMA-2
5.4
3.8
PWMA
5.4
3.8
25
Condition
Information
Weather Condition
2012.09 (Fall)
Mix Type
Additive Type-1
PWMA -1
Additive Type-2
PWMA-2
Plant-mixed
Mixing Temp.
1505C (PWMA-1)
1555C (PWMA-2)
Compaction Temp.
1405C (PWMA-1)
1455C (PWMA-2)
Gmm (g/ )
Core Density (g/
)
Air Voids (%)
HMA
PWMA-1
PWMA-2
2.505
2.492
2.499
2.267
2.295
2.305
9.5
7.9
7.8
26
Information
Weather Condition
2012.09 (Fall)
Mix Type
Additive Type-1
WMA(LEADCAP)
Additive Type-2
PWMA(PMA+LEADCAP)
Mixing Type
Plant-mixed
Mixing Temperature
1405C (WMA)
1505C (PWMA)
Compaction
Temperature
1305C (WMA)
1405C (PWMA)
Gmm (g/ )
Core Density (g/
)
Air Voids (%)
HMA
WMA
WMA PMA
2.388
2.443
2.437
2.344
2.341
2.382
1.8
4.1
2.5
27
Information
Weather Condition
2013.09 (Fall)
Mix Type
Additive Type-2
PWMA(STE-M3)
Mixing Type
Plant-mixed
Mixing Temperature
1505C (PWMA)
Compaction
Temperature
1405C (PWMA)
28
29
30
31
Conclusions
1.
2.
3.
4.
The PWMA field trials were successfully completed in South Gobi road