Instruction for using DM1A

Chapter 2 : Instruction DM1A

Schneider Electric

- Services Division Training SM6 Cubicle July 2011

General description
DM1 circuit breaker cubicle

1. Top busbar compartment


2. LV compartment
3. Switchgear compartment: feeder
disconnector
4. Operating mechanism compartment
5. Cable connection or lower busbar
compartment

A.
B.
C.

Earth bar connection pad


Top busbar connection pads
Inspection windows

D.

SF1 type MV Circuit Breaker

E.

Front panel

Schneider Electric

- Services Division Training SM6 Cubicle July 2011

General description
DM1A Version (cable incoming or outgoing)
(front panel removed)

F. Voltage indicator
G. Voltage transformers
H. Current transformer
K.
L.
M.
N.

Load-side earthing switch


Capasitive voltage diveders
CB control panel
Insulating shields

Schneider Electric

- Services Division Training SM6 Cubicle July 2011

Handling instructions
Cubicle identification

A. Indicator plate
B. Characteristics and designation

Serial number

C. Manufacturers name plate

D1: riveted to the front plate of the


operating mechanism

NB:The characteristics of the CB


are given on its plate

D2: glued to the back of the front


plate of the LV compartment
D3: glued to the upright of the frame

Schneider Electric

- Services Division Training SM6 Cubicle July 2011

Handling instruction
Caution

Do not handle the cubicle from the front control panel.

Schneider Electric

- Services Division Training SM6 Cubicle July 2011

Handling instruction
Dimensions

In mm.

Schneider Electric

- Services Division Training SM6 Cubicle July 2011

Installation instruction
Layout in the substation

Switchboard installed to the right of a wall


*(minimum clearance for troubleoperation)

Schneider Electric

- Services Division Training SM6 Cubicle July 2011

Switchboard installed to the left


of a wall

Installation instruction
Fitting busbars after installing the cubicles

Mounting of U - fittings
Single - hole U - fitting

Mount the 3 U fittings on the


suppporting insulators

Schneider Electric

- Services Division Training SM6 Cubicle July 2011

using M8x30 bolts (female


hexagonal) without locking

Installation instruction
Fitting busbars after installing the cubicles

Mounting of U - fittings
Two - hole U - fitting

Mount the 3 U fittings on the heart


of the unit

Schneider Electric

- Services Division Training SM6 Cubicle July 2011

using M8x30 bolts (female


hexagonal) without locking

10

Installation instruction
Fitting of bars

Place the bars as shown in


the diagram opposite

Schneider Electric

- Services Division Training SM6 Cubicle July 2011

11

Installation instruction
Fitting of bars

Version < = 12kV


Identical for single hole U fittings

Schneider Electric

Fit the bars and then the nuts


and bolts

Lock the bolts V for fixing Ufittings after all fitted

Tightening torque: 28 Nm

Tightening torque: 28 Nm

- Services Division Training SM6 Cubicle July 2011

12

Installation instruction
Fitting of bars
Version > 12kV
Identical for single hole U
fittings
Note: fitting is identical for
single-hole or two-hole U fittings

Place the field distributors correctly on


the U-fitting

Incorrect fitting

(use fool proofing device to ensure


correct placing)
Fit bars and then nus and bolts
Tightening torque: 28Nm

Lock the bolts V for fixing the Ufittings after all the bars have been
fitted
Tightening torque: 28Nm

Schneider Electric

- Services Division Training SM6 Cubicle July 2011

13

Installation instruction
Top busbar of a DM1A

Schneider Electric

- Services Division Training SM6 Cubicle July 2011

14

Installation instruction
Fittting the earth bars

Connect the earth bars together


(using HM 8x30 bolts)

Schneider Electric

- Services Division Training SM6 Cubicle July 2011

Earth the substation frames


in either of these two ways

15

Start-up & operating instructions


Checks before energising

Check that nothing has been left


in the connection compartment.

Put the front panel back in place

Schneider Electric

- Services Division Training SM6 Cubicle July 2011

16

Start-up & operating instructions


Voltage indicators

Schneider Electric

Incoming cubicle:

Outgoing panel:

As soon as the load side of the


insallation is energised, the
voltage indicator lamps should
go on

After the feeder disconnector and


then the CB have been set to the
closed position, the voltage
indicator lamps should go on

- Services Division Training SM6 Cubicle July 2011

17

Start-up & operating instructions


Phase concordance test

If the phases concord, the lamp remains off.


If the phases do no concord, the lamp goes on.

Schneider Electric

- Services Division Training SM6 Cubicle July 2011

18

Start-up & operating instructions


Feeder disconnector operating lever positions

Position the lever as indicated


for downward (opening)
operations.

Schneider Electric

- Services Division Training SM6 Cubicle July 2011

Position the lever as indicated


for upward (closing) operations.

19

Start-up & operating instructions


CB no-load Operations
Initial status:

1. Lock the lever


insertion point E
of the feeder
disconnector with
the key inserted
at point B.

The feeder
disconnector
is in open or
earth position.
CB locked in
open position.

3. Press the CB by
pressingpush
button I

Schneider Electric

- Services Division Training SM6 Cubicle July 2011

2. Remove the key


from B then insert
it at point C.
Unlock then
charge the CB

4. Open CB by
pressing
pushbotton
O.

20

Start-up & operating instructions


CB no-load Operation

5. Lock CB open with key in C


position by pressing the
pushbutton O.

Schneider Electric

- Services Division Training SM6 Cubicle July 2011

6. Remove the key from C


position and insert it in B.
Unlock the opening of lever E
of the feeder disconnector.

21

Start-up & operating instructions


Energizing the load side of the installation
Initial status:
The feeder
disconnector is in
earth. CB is locked
open position. Front
panel in place.

1. Set the feeder


disconnector to
open position
using the
operating lever.
Note: in the case
of a DM1A, the
load earthing
switch opens
simultaneously.
3. Remove key from
A,place in C and
unlock the CB.
Charge the CB (see
CB instructions).

Schneider Electric

- Services Division Training SM6 Cubicle July 2011

2. Set the
feeder
disconnector
to closed
position, then
lock lever
insertion
point E of
feeder
disconnector
with key to A.
4. Close CB by
pressing
pushbutton I.
The load side
of the
installation is
energized.

22

Start-up & operating instructions


De-energizing the load side of the installation
Initial status:
The feeder
disconnector is in
closed position.
CB is closed.

1. Open CBby
pressing
pushbutton O.

3. Remove key
from C & insert
it in A. Unlock
lever insertion
point E of
feeder
disconnector.

Schneider Electric

- Services Division Training SM6 Cubicle July 2011

2. Lock the CB
open with key
in C by
pressing
pushbutton O.

4. Set feeder
disconnector to
open position.

23

Start-up & operating instructions


De-energizing the load side of the installation

5. Set feeder disconnector to


earthed position. The front
panel can be removed.
Note: in the case of a DM1A,
the load earthing switch
closes simultaneously.

Schneider Electric

- Services Division Training SM6 Cubicle July 2011

24

Start-up & operating instructions


Operating safety

Operation is impossible when


CB is closed.
The front panel can not be
removed or installed unless
the feeder disconnector is in
earth position.

Schneider Electric

- Services Division Training SM6 Cubicle July 2011

If the feeder disconnector is in


open or closed position, the
front panel can not be
removed.
If the front panel is removed,
the feeder disconnector can
be set to open position.
However it can not be set to
closed position.

25

Start-up & operating instructions


Padlocking
With one to three 8
mm padlocks per
locking point.

Schneider Electric

- Services Division Training SM6 Cubicle July 2011

1. Padlocking
feeder
disconnector
in earth
position.

2. Padlocking
feeder
disconnector
in open
position.

3. Padlocking
feeder
disconnector
in closed
position.

4. Padlocking
of the front
panel.
(1 padlock
only)

26

Maintenance instruction
Preventive maintenance
Never lubricate the operating mechanism.
No particular maintenance is required under normal operating
conditions.

Schneider Electric

- Services Division Training SM6 Cubicle July 2011

27

Maintenance instruction
Corrective maintenance
Replacing a voltage indicator block:

Pull out the voltage indicator block.


(The switchboard can remain
energized).

Schneider Electric

- Services Division Training SM6 Cubicle July 2011

28

Maintenance instruction
Troubleshooting chart

Schneider Electric

Voltage indicator not illuminated.

Check the voltage indicator


block.
Check that the feeder
disconnector & the CB are
closed.
Check that the incoming cables
are live.

Front panel cant be opened or


closed.

Check that the feeder indicator is


in earth position.

Feeder disconnector cant be set


to earth position.

Check that the feeder


disconnector is in open position.

Feeder disconnector cant be set


to closed position.

Check that the feeder


disconnector is in open position.

CB cant be operated

See CB instructions.

- Services Division Training SM6 Cubicle July 2011

29

End of presentation

Schneider Electric

- Services Division Training SM6 Cubicle July 2011