Test Options (1)

1. Primary injection sensitivity tests only

Minimum of time consumed


If results incorrect, secondary injection and CT tests
required

Unable to check :a.

Adequate timing curves

b.

Directional properties

c.

Power and impedance relays

Not suitable for maintenance tests

> Commissioning & Maintenance of Protective Relays

Test Options (2)

2. Secondary injection tests


(But with C.T.s still connected)

True primary sensitivity easily equated


If results incorrect isolated relay and CT mag.
curve checks necessary

Ref. for maint., but system outage required


Primary tests on C.T. ratio and polarity still
required on commissioning

> Commissioning & Maintenance of Protective Relays

Test Options (3)

3. Secondary injection tests


(But with relays isolated by test facility)

Proof of isolated relay characteristic obtained


Ref. for maintenance obtained
(relay if necessary tested with system on load)

Full primary injection/on load tests done on initial


commissioning only

> Commissioning & Maintenance of Protective Relays

Test Options (4)

4. On load tests

Checks that expected C.T. / V.T. quantities present at test


facility

Scheme stability for external faults


Proof of correct directional characteristics

> Commissioning & Maintenance of Protective Relays

Summary

1.

Secondary injection (isolated relay)

2.

Primary injection
(incl. C.T. ratio, phasing and mag. curve)

3.

On load tests

> Commissioning & Maintenance of Protective Relays

Site Testing and Commissioning


of Protection Equipment
To assure ourselves, and the interested authorities,
that the overall protective system functions
correctly
Resist pressures to take risks
Study wiring diagrams and protection requirements

Key diagram

Delegate responsibilities

Observe safety of self and others

> Commissioning & Maintenance of Protective Relays

Commissioning Flow Chart


Summary (1)
To assure ourselves, and the interested
authorities, that the overall protective
system functions correctly.

Study of wiring diagrams and protection


requirements.

Careful delegation of responsibilities to


reduce the duplication of effort and to
ensure that all the following aspects are
covered :-

> Commissioning & Maintenance of Protective Relays

Commissioning Flow Chart


Summary (2)

Insulation Tests

Secondary Injection Tests (Relay Tests)

Ensure clean dust free area

Prove trip and alarm circuits

Mechanical inspection
Out-going contact wiring
External resistors
C.T. shorting and isolating switches
Contact follow-through and pressures
Electrical checks on each basic electrical function
to prove satisfactory operation
Test results (record and maintenance purposes)

> Commissioning & Maintenance of Protective Relays

Commissioning Flow Chart


Summary (3)

Primary injection tests

D.C. flick tests on C.T.s

C.T. ratio and polarity tests

Primary sensitivity tests

Stability tests

Test results

C.T. mag curve tests

> Commissioning & Maintenance of Protective Relays

Commissioning Flow Chart


Summary (4)
Line / Transformer / Generator energisation

V.T. ratio and phasing tests

On load tests

Stability tests

Directional properties

At the end of each stage ask yourself :Is there anything wrong, wiring or otherwise,
that I
have not checked that may prevent correct
operation
If so, CHECK IT OUT !
10

> Commissioning & Maintenance of Protective Relays

Maintenance of
Protective Relays (1)
Frequency of Maintenance
Dictated by :a) The site condition
b) The availability of maintenance staff and
resources
c) The availability of plant outage times
d) The risks involved if the protection
should fail
e) The type of relay construction

11

> Commissioning & Maintenance of Protective Relays

Maintenance of
Protective Relays (2)

Frequency of Maintenance (continued)


f) The proven reliability of devices under
identical site conditions
g) The availability of built-in self-check
features
or semi-automatic test facilities, and the
difficulties of alternative tests
h) The interval of time an unexpected
catastrophic
failure, component or otherwise, that
may go
undetected and leave the system
unprotected
12

> Commissioning & Maintenance of Protective Relays

Maintenance of
Protective Relays (3)
Onerous site conditions :1. Dusty or dirty environments
2. Corrosive chemical atmospheres
3. Frequent or continuous vibration
4. High humidity
5. High or cycling temperatures
6. Consistently high levels of energising or auxiliary
quantities
Typically maintain every 12-18 months under ideal
conditions and decrease frequency

13

> Commissioning & Maintenance of Protective Relays

Maintenance of
Protective Relays (4)

Visual inspections

The commissioning test stage

At each maintenance test

After heavy fault clearance

More regularly if onerous site conditions

Calibration tests
Trip testing

14

> Commissioning & Maintenance of Protective Relays

Maintenance of
Protective Relays (5)

Recommended maintenance tests


Instruction manuals
Record relay settings
Visual inspection
Secondary injection tests
Contact integrity
Return to in-service settings
Check energising quantities

15

> Commissioning & Maintenance of Protective Relays

Maintenance of
Protective Relays (6)

Relays involving static (electronic) components

Electro-static discharge (ESD)

Wrist straps

Modern static relays (K-SERIES, MiCOM etc.)

16

Fault find to board level only

Protect boards

> Commissioning & Maintenance of Protective Relays

Corrective Maintenance of
Protective Relays (1)

Cleaning solvents
Trichlortrifluorethane (Ozone damaging)
(Arklone, Freon, Flourisol and Supersolve)
PROZONE
Contact lubricants and other lubricants
Contact cleaning burnishers
Contact pressures and settings
Dust removal
Relay recalibration (Why?)

17

> Commissioning & Maintenance of Protective Relays

Contents of Section 23 of PRAG (1)


(Protective Relay Application Guide)
Insulation tests
Current transformer tests
Voltage transformer tests
Test facilities
Secondary injection tests

18

O.C. and E.F.


Differential
Pilot wires
Negative phase sequence
Directional Distance
D.C. operated

> Commissioning & Maintenance of Protective Relays

Contents of Section 23 of PRAG (2)


(Protective Relay Application Guide)

Primary Injection Test (+ on load tests)

O.C. and E.F. relays


Directional
Generator Differential
Transformer Differential
Restricted E.F.
Pilot Wire
Busbar
Negative phase sequence

19

> Commissioning & Maintenance of Protective Relays

Contents of Section 23 of PRAG (3)


(Protective Relay Application Guide)

Tripping and Alarm Annunciation


Periodic Maintenance

In addition to PRAG :Consult instruction manuals

20

> Commissioning & Maintenance of Protective Relays

Test Terminal Block


To
To relay
relaycoils
coils

To CT
CT test
To
test
windings
windings
(if any)
(if any)

21

B
To main
main
To
current
current
transformers
transformers

> Commissioning & Maintenance of Protective Relays

C N
A
To
To main
mainVTVT

Test Switch and Sockets


To relay coils

A
CurrentB
test
socketsC

B Voltage
test
C sockets
N

Test selector swit


Make before brea
on CT Circuits

To main current
transformers
22

> Commissioning & Maintenance of Protective Relays

To main VT

Current Transformer
Polarity Check
P2

P1
S2

S1

Battery
23

> Commissioning & Maintenance of Protective Relays

Push
button
switch

Current Transformer
Ratio Check
A

C
A2

Temporary
short
circuit

51

P1

51
S1

P2 S 2

51
64

Relay or test block


contact fingers

A1
Primary injection
test set
250V AC supply
24

Test plug
insulation

> Commissioning & Maintenance of Protective Relays

Testing Current Transformer


Magnetizing Curve
A

Test plug isolating


current transformers
from relay coils

A
P1

To relay
coils
V

S1

Variable
transformer
250V 8A

250V
AC
supply

S2
P2
Main circuit
breaker open

25

> Commissioning & Maintenance of Protective Relays

Step-up transform
if required

Voltage Transformer
Phasing Check
A
B
C

A
V1
V2

C
VN

VL
V1

V2
A

26

> Commissioning & Maintenance of Protective Relays

Phase rotation
meter

Overcurrent Test Set


Fine control
variable
transformer

Coarse
control
reactor

Range
adjusting CT

K1

K2

250V
AC
supply

51 Relay

coil

Start
timer
Supply
switch

Backing
transformer
10% control

Stop
timer

Injection
Medium transformer Relay shortcircuiting switch
control
reactor

Relay current I = Ammeter reading (A) x


27

> Commissioning & Maintenance of Protective Relays

Basic Current Control Circuit


of CFBA Test-Set
A
60Hz

L2

50Hz
0.1A

10X5X2X1X

0.2A

220/250V
AC
Supply
50/60Hz

Variac V1

60Hz

0.5A

50Hz

1A
2A

O/V Detector
Circuit

L1

5A

Supply
Contractor

Supply Shorting
Switch

Thermal Overload / Overvoltage


Protection

28

> Commissioning & Maintenance of Protective Relays

10A

Timer
T1 Injection
Start
Matching
(Break to Start)
C.T.

Output
to
Relay

Sensitivity Check on
Biased Differential Relay
B

B
OP
Test plug
fingers

Over current
test set

To main current
transformers

250V
A.C. supply

29

> Commissioning & Maintenance of Protective Relays

OP Relay operating coi


B
Relay bias coil

Testing Bias Characteristics


(Using Overcurrent Test Set)
B

B
OP

I1+I2

A1

Overcurrent
test set

To main current
transformers

250V A.C.
supply
30

I2

I1

> Commissioning & Maintenance of Protective Relays

A2
R

Test plug
fingers

Testing Relay Bias Characteristic


(Using Resistances)
B

B
OP

I1+I2

R1

Test plug
fingers

A2

A1

To main current
transformers

250V A.C.
supply

31

I2

I1

> Commissioning & Maintenance of Protective Relays

R2

A1 and A2 Ammeters
OP Relay operating coil
B Relay bias coil

Sensitivity Test
Feeder isolated
A
B
C
Test
plug

Relay
contact
fingers

Overcurrent 250V
test set A.C. supply

B
OP

OP

Pilots

32

> Commissioning & Maintenance of Protective Relays

Testing Sensitivity of Negative


Phase Sequence Relay

250V
A.C.
supply

To main
current
transformers

C
N

Overcurrent
test set

Test plug
in test block

33

> Commissioning & Maintenance of Protective Relays

Filter
network

46

Relay
coil

Test Equipment for Directional Relays


Supply switch
440V
3 phase
4 wire supply

A
B
C
N

Choke

Variable
transformer
for current
control

67

Relay
current coil

Range adjusting CT
440/110V
phase shifting
transformer

PA

PA

67

Relay
voltage coil

Variable transformer
for voltage control

To other voltage coils V Voltmeter


A Ammeter
of relay under test
PA Phase angle mete
(if required)
34

> Commissioning & Maintenance of Protective Relays

Primary Injection Test Set

250V A.C.
supply

Variable transformer 40A


Injection transformer
250/10 + 10 + 10V
10kVA

35

> Commissioning & Maintenance of Protective Relays

Primary Check on
Main Current Transformers

Temporary three
phase short circu

Primary
injection
test set

250V
A.C. supply

51 Overcurrent relay
64 Earth fault relay
A
Ammeter

36

> Commissioning & Maintenance of Protective Relays

5
1
5
1
5
1
6
4

Sensitivity Test on Earth Fault Relay


250V
A.C.
suppl
y

Primary
injection
test set

5
1

B
51

C
51

64

37

> Commissioning & Maintenance of Protective Relays

Load Test on Directional


Overcurrent Relays
A B
C

Direction of power
flow
Load
for relay operationcurrent

A
V
PA
38

Ammeter
Voltmeter
Phase angle
meter
>

PA

PA

B
C

Directional overcurrent
relays
Commissioning & Maintenance of Protective Relays

Test Plug Link Connections to


Reverse Current seen by Relay
To relay

20 19 18

17 16 15

14 13 12 11

Test plug
To main VT and CT
39

> Commissioning & Maintenance of Protective Relays

10

Load Test on Directional Earth Fault Relay


A B C

1S

2
S
2

IA
A

51
51

A
V
PA

40

51

Ammeter
Voltmeter
Phase angle meter

> Commissioning & Maintenance of Protective Relays

Load
Load
current
current

PA
P
A

Temporar
y
short
circuit
connectio
Insulating
ns
strips
in
relay or test
block
contact fingers
Directional
earth
fault relay

V
1V
2

V
L

V
V
P
PA
A

Testing Sensitivity of Generator Differential


Protection Using Primary Injection Test
Primary
injection
test set

87 Generator differential re
V
Voltmeter
A Ammeter

250V A.C.
supply
Generato
r

Isolating
links

A
B
C

41

> Commissioning & Maintenance of Protective Relays

87

87

87

Testing Sensitivity of Generator Differential Protection


Using Generator to Supply Primary Current
Temporary
short
Isolating
circuit
links
Generato
r

A
B
C

87

87

87

87 Generator differential r
V
Voltmeter
42

> Commissioning & Maintenance of Protective Relays

Checking Stability of Generator


Differential Protection
Isolatin
g
links

Generato
r

Temporary
short
circuit

A
B
C

87

87

87

Shorts across
relay/
stabilising
resistors
43

> Commissioning & Maintenance of Protective Relays

87 Generator differential r
A Ammeter

Earth Fault Sensitivity Check on Transformer


Differential Protection

A
Primar
y
injectio
250V n
A.C. test
set

suppl
y

Temporary
short
circuit

B
C
Bias
coils

Operatin
g
coils
44

> Commissioning & Maintenance of Protective Relays

87

87

87

Phase Fault Sensitivity Check on Transformer


Differential Protection
A

Temporary
short
circuit

A
B

Primary
injection
test set

250V
A.C.
suppl
y

C
Bias
coils

Operatin
g
coils
45

> Commissioning & Maintenance of Protective Relays

87

87

87

Stability Check on Transformer


Differential Protection
Temporary short
circuit

Generato
r

~
Bias
coils

87 87 87

Operating
coils

Instantaneous current distribution for


three-phase short circuit with phase A
current at maximum
46

> Commissioning & Maintenance of Protective Relays

Sensitivity Check of Restricted


Earth Fault Protection
250V A.C.
supply

Primary
injection
test set

A
B
C

64 Earth Fault Relay


A Ammeter
V Voltmeter
47

> Commissioning & Maintenance of Protective Relays

64

Stability Check of Restricted Earth


Fault Protection

250V A.C.
supply

Temporary short
circuit

Primary
injection
test set

A
B
C

A
48

> Commissioning & Maintenance of Protective Relays

64

64 Earth Fault Rela


A Ammeter

Sensitivity Check of Negative


Phase Sequence Relay
A

B C

Temporary
short circuit

Filter
network

46

Primary
injection
test set

49

>

250V
A.C.
supply
Commissioning & Maintenance of Protective Relays

46 Negative phase sequence r


A Ammeter

Test Plug Link Connections for


Load Current Test
To relay
filter network

20 19 18

17 16 15

6
A

50

> Commissioning & Maintenance of Protective Relays

14

13 12 11

7
B

8
C

9
N

10

Earth Fault Sensitivity Check


of Pilot Wire Relay

B
C
Primary
injection
test set

250V A.C. supply

B
OP

51

B Relay bias coil


Ammeter
> Commissioning & Maintenance of Protective Relays

Pilots to
remote
end relay
OP Relay operating coil

Phase Fault Sensitivity Check


of Pilot Wire Relay
A

B
OP

B
Relay bias coil
OP Relay operating
coil
A
Ammeter
A
Primary
injection
test set

52

Pilots to
remote
end relay
250V A.C. supply

> Commissioning & Maintenance of Protective Relays

Load Current Distribution


A

A
C

C
Feede
r

Instantaneous current
distribution of three-phase
balanced load with
phase A current at
B
maximum

B
OP

OP

Pilots

53

> Commissioning & Maintenance of Protective Relays

Short-Circuiting Connections
on Test Plug for Load Test
Short circuiting connections
on rear of test plug

20 19 18

To relay summation CT

17 16 15

A A

14 13

7
B

12

8
C

9
N

To main current
transformers
54

> Commissioning & Maintenance of Protective Relays

Ratio Check of Current Transformers


of Reference Circuit

A1
250V
A.C.
supply

A2

Primary
injection
test set

A1 and A2
87
relay
95
95X
circuiting
55

Ammeters
Busbar Protection
Supervision relay
Bus wires shortrelay

> Commissioning & Maintenance of Protective Relays

Test
links

A
B
C
N

Zone
bus
wires

95

87

87

87

95
X

Polarity Check of Reference


Circuit Current Transformers
A
87

A
Ammeter
Busbar ProtectionC
relay
95 Supervision relay
95X Bus wires shortcircuiting relay

250V
A.C.
supply

Temporary short circuit


A

Tes
t
link
s

Primary
injection
test set

A
B
C
N

95
X
95

56

> Commissioning & Maintenance of Protective Relays

87

87

87

Zone
bus
wires

CT Inter-Group Ratio and Polarity Check in


Busbar Protection Scheme
Reference
circuit

Test circuit

Temporar
y
short
circuit

57

Primary
injection
test set

250V A.C. supply

A
A
B
C
N

A1
A2
87
95
95X

Test
link
s

Ammeter for ratio check


Ammeter for polarity
check
Busbar protection relay
Supervision relay
95
Bus wires shortcircuiting relay

> Commissioning & Maintenance of Protective Relays

A2

95X
87

87

87

A2

A2

Zon
e
bus
wire
s

Sensitivity Check of Busbar


Protection Scheme
A
C

A
250V
A.C.
supply

Primary
injection
test set

Test
links

A
B
C
N

58

> Commissioning & Maintenance of Protective Relays

95
X
95

87

87

87

Zone
bus
wires

Stability Test
A
B
C
Test
plug

Overcurrent
test set

250V
A.C. supply

Pilots

> Commissioning & Maintenance of Protective Relays

B
OP

OP

59

Test
plug