1. Introduction
to
RP,
Lecture contract
2. Background of building
up a chemical plant,
choosing a plant design
topic, stages in plant
design
3. Determination of Plant
Capacity
and
Plant
Location
4. Determination of Plant
Lay-out and Plant Area
5. Choosing
Process,
Description
of
the
Process
6. Flow Diagrams
7. Choosing raw materials
8. Choosing
materials
of
construction
9. Choosing equipments
10.Mass balance & energy
balance
11.Utility
1
12.Plant organisation
Available Time
1. 10 August & 12 August
2015
2. 17 August & 19 August
2015
3. 24 August & 26 August
2015
4. 31 August & 2 Sept 2015
5. 7 Sept & 9 Sept 2015
6. 14 Sept & 16 Sept 2015
7. 21 Sept & 23 Sept 2015
8. 28 Sept & 30 Sept 2015
9. 5 Oct & 7 Oct 2015
10.12 Oct & 14 Oct 2015
11.19 Oct & 21 Oct 2015
12.26 Oct & 28 Oct 2015
13.2 Nov & 4 Nov 2015
14.9 Nov & 11 Nov 2015
15.16 Nov & 18 Nov 2015
16.23 Nov & 25 Nov 2015
Team teaching:
Time Table
Date
Topic
Lectur
er
10 Aug & 12
Aug
Introduction to Plant
Design,
Lecture
contract: English class,
Syllabus, Time Table,
Evaluation
system,
Types of design, What
is Plant Design, The
purpose of construing
Plant
Design,
Preliminary Design vs
Plant Design, Sources
of
information,
References.
TKD
17 Aug & 19
Aug
Background of building
up a chemical plant,
Choosing
a
plant
design topic, Stages in
plant design.
HD
24 Aug & 26
Aug
Determination of Plant
Capacity
and
Plant
Location.
HD
31 Aug & 2
Sept
Determination of Plant
Lay-out, Estimation of
Plant Area.
HD
7 Sept & 9
Sept
Choosing
Process
(loss-benefit,
batchcontinue,
simplecomplicated,
easydifficult, cheap-costly,
safe-dangerous,
efficient-inefficient,
pure-roughly,
raw
materials, construction
materials,
environmental
considerations,
etc),
Description
of
the
Process
HD
14 Sept & 16
Sept
HD
No
Choosing
raw
Topic
Lectur
er
28 Sept & 30
Sept
Choosing materials of
construction: technical
considerations,
physical & chemical
properties,
economic
view, durability, safety,
environmental
considerations, etc.
HD
No
10
11
12
13
14
15
HD
12 Oct & 14
Oct
Choosing equipments:
main
equipments
(reference:
Flow
Diagrams,
PEFD),
logical
process
and
flow.
TKD
19 Oct & 21
Oct
TKD
26 Oct & 28
Oct
TKD
2 Nov & 4
Nov
Plant
organisation:
man
power,
fair
position,
logical
job/position,
adn
responsibility.
TKD
9 Nov & 11
Nov
Equipments
design,
Equipments
specification:
pumps,
reactors, separators
TKD
16 Nov & 18
Nov
TKD