Scope of Services
i.
ii.
iii.
iv.
v.
vi.
vii.
viii.
ix.
x.
xi.
xii.
xiii.
Topographical Survey
Traffic Survey
Geotechnical Survey
Road & Pavement Investigation
Road Inventory Survey
Bridges & Culverts Investigations
Material Investigation
Detailed Design
Environmental & Social Impact Assessment
Estimation of Quantities & Project Cost
Economic & Financial Viability
Land Acquisition Report
Contract Document
Key Plan
45+000
40+000
35+000
30+000
25+000
20+000
15+000
12+000
Major Junction
To Nimach
Minor Bridge
Major Junction
To Bamora Village Road
Major Junction
To Udaipur
Major Junction
To Salumber Town
82+000
80+000
75+000
70+000
65+000
60+000
55+000
Minor Bridge
E N D O F PR O JEC T R O AD
Major Junction
NH - 76
50+000
S TA RT O F PR O JEC T R O AD
Linear Plan
Villages
Vallabhnagar
Girwa (Udaipur)
Salumber
Total Length
70 Km
Start Chainage Km 12 on SH 53
End Chainage Km 82 on SH - 53
ii
Major Bridges
vi
Minor Bridges
vii
CD Work
130 Nos.
vii
i
ix
Major junctions
6 Nos.
Existing Bypass
Nil
Railway crossing
At grade at Km 22/000
xi
Public
Amenities
viz. Nil
Petrol pump, bus bays,
etc.
Existing Toll Station
Km 64.00 (Near Bridge Kharka) operated
by P.W.D.
xii
i
Terrain
xv
Pavement Quality
Km
Km
Km
Km
Km
12.00
26.00
30.00
48.00
55.00
26.00 Plain
30.00 Rolling
48.00 Rolling (Hilly)
55.00 Rolling
82.00 Plain
Good to fair
Site Photographs
Strengthening
BC
40 mm
BC
40 mm
DBM
85 mm
BM
50 mm
WMM
250 mm
As required
GSB
260 mm
SUBGRADE 500 mm
DPR for Salumber Keer Ki Chowki Section of SH-53
Proposed ROW:
Villages 15 to 20 m. (approx.)
Other Sections 24 to 30 m. (approx.)
ii.
Proposed Roadway:
Carriageway 7 m
Hard Shoulder Nil
Soft Shoulder 1.5 m
iii.
Proposed Bypass:
1.
2.
3.
4.
iv.
v.
vi.
vii.
viii
.
1.
(2+2) lanes
2.
x.
Improvement of Junctions
xi.
Udaipur
NH - 76
Keer ki Choki
Project Road
Chargadiya Bypass ( km 25 )
Fila Bypass ( km 50 )
Laudha Bypass ( km 62.500 )
Salumber Bypass ( km 82 )
Salumber
Rishabhdev
Aspur
Khairwara
Banswara
Particular
Without
Hard
Shoulder
With Hard
Shoulder
Road works
69.61
83.13
Structures
10.02
12.23
Toll Plaza
4.41
4.41
7.44
7.44
1.00
1.00
Traffic Studies
Near Keer ki
chowki
B/w Bhinder &
Bamora
Road to Bamora
Km 48.000
Near Salumber
End of Project
-Salumber
LEGEND
CTVC Stations
TMC Stations
Project stretch
Mode of
Vehicle
Passenger
Vehicles
2-Wheeler
Commercial
Vehicles
Ch:
Km.18.000
Ch:
Km.39.000
Ch:
Km.79.500
1162
682
1295
Auto
36
37
96
Car
395
181
260
Bus
52
39
48
LCV
116
58
97
2-Axle
162
83
248
3-Axle
49
87
41
Multi axle
123
51
83
Tractor
104
113
65
Projected Traffic
Year
201
0
201
5
202
0
202
5
203
0
203
5
204
0
Tollable
Vehicles
(No.)
Total Vehicles
(PCUs)
Tollable
Vehicles
(No.)
Total Vehicles
(PCUs)
1023
3124
931
3317
1306
3935
1188
4193
1667
4965
1517
5271
2127
6273
1936
6637
2715
7934
2471
8370
3465
10048
3153
10571
4423
12759
4024
13289
Growth Rate = 5 %
16.94
0.42
Buses
42.35
1.09
57.60
1.42
86.39
2.16
142.30
3.58
Tractors
with
trolleys
carrying
agricultural
products
Cars/ Taxis/Jeeps
Car/Jeep/
Passenger Van
LCV
Tractor
Bus
2ATruck
MAV
(>2
Axle)
25
80
60
120
200
20
75
55
115
190
Year 2010
Financial Cost
Cost (Rs. in Crore)
Sr.
No
.
Particular
Without
Hard
Shoulder
With
Hard
Shoulder
Concessionaire Cost
1
Civil Cost
92.49
108.21
5.55
6.49
Quality Control - 1 %
0.92
1.08
Contingency - 5 %
4.62
5.41
0.09
0.11
Subtotal
103.68
121.31
A & F charges 7%
7.26
8.49
0.52
0.61
6.87
8.04
118.33
138.45
Sr. No.
Type of Model
Remark
BOT
Sr.
No.
1
2
Type of Model
Remark
BOT
+ 34 Cr. Annuity
Approval Required
i.
ii.
iii.
iv.
v.
Land Acquisition
Tree Cutting Permission
Utilities Shifting
State Pollution Control Board
Environmental Clearance
Thank You