Dive Marine NDT Inspections Pte. Ltd.

Visual Inspection Report of 8 inch RMS


1st & 2nd Tier
Report Number: DMNDT-15EM39-VI-03
API Inspector: PERAMAIYAN RAJESH
API Number: 57662
Date: 27 July 2015 to 27 August 2015
Signature:

DMNDT-15EM39-VI-03

Heavily Corroded;
recommend to repair or
replace
62~6
4

Rust Bleedings/Minor
Corrosion/Paint Damage along
the line ( Intermittent).

68~70

32~34

G35~3
7

53~5
5

71~7
6

38~40

41~4
3

56~5
8
59~6
1

48~5
2

65~6
7

Moderate corrosions/
paint failure/ scales ;
recommend to power tool and
repaint
Minor paint failure/ rusts/
oil stains
Photo numbers.

23~2
5

44~46
26~2
8

47~4
9

G5~1
2
13~15

29~3
1

DMNDT-15EM39-VI-03

16~1
9
20~2
2
1~
4

Photo 4850

G122~12
4

G125~1
27

Photo 43G93~9
45
4

G110~11
4

G95~9
9

G115~1
16

G87-88

10
Photo 58- 0
60

G117~11
9

G77~7
9

89
G101~1
03

G120~12
1

Photo 57
90
G104~10
6

Photo 5862
G107~10
9

91

G80~8
3

Photo 5556
G84~8
5

92

86

DMNDT-15EM39-VI-03

Photo 5154

Photo 4647

G138,1
39
140,142
G137
G136

G132,1
35
G133,1
34

G144,14
5
G131

141

143

G129,1
30

G128
G127

143

DMNDT-15EM39-VI-03

142

Photo 1

Photo 22P

Overview at pipe support -1


Photo 3

At pipe support -1 : Found to be in good


condition
Photo 4

At pipe support -1 : Found to be in good


Pipe support-1~2 : Minor rust along support 1 to 2;
condition
recommend to power brush and repaint
DMNDT-15EM39-VI-03

Photo 6

Photo 5

Overview at Support -2
Photo 7

Support -2: Support found to be in Good condition


Photo 8

Support -2~3 :Minor rust along pipe 2 to 2A; recommend to


Support -2: Support found to be in Good condition
power brush and repaint
DMNDT-15EM39-VI-03

Photo 9

Photo 10

Overview at support -2A

Support -2A : support found to be in good


condition

Photo 11

Photo 12

Support -2A : support found to be in good


condition

Support 2A ~3- found minor rust along support 2A to 3


& rust bleed
Recommend to power brush the rust bleed and repaint
DMNDT-15EM39-VI-03

Photo 13

Photo 14

Overview at Support -3
Photo 15

Support 3~4 found to be in good condition


Photo 16

At support 3 rust bleed was observed and


recommend to repaint
DMNDT-15EM39-VI-03

Overview at Support -4

Photo 17

Photo 18

Pipe support 4 found to be in good condition


Photo 19

Pipe support 4 found to be in good condition


Photo 20

Support 4 ~4A: Rust bleed found at few locations


and recommend to repaint
DMNDT-15EM39-VI-03

Overview at Support
4A

Photo 21

Photo 22

Support 4A: found to be in good condition


Photo 23

Support 4A~5 : Rust bleed was observed and recommend


to repaint
Photo 24

Overview at support 8

Support 8: found to be in good condition at this


dummy support
DMNDT-15EM39-VI-03

Photo 25

Photo 26

Pipe along 5~5A: Minor rust bleed was observed


Photo 27

Overview at support 5A
Photo 28

Support 5A: found to be in good condition

Pipe along5A ~6: found to be in condition

DMNDT-15EM39-VI-03

Photo 29

Photo 30

Overview at support 6

Support 6: found to be in good condition

Photo 31

Photo 32

Pipe along 6~6A: one minor rust bleed was


observed
DMNDT-15EM39-VI-03

Overview at support 6A

Photo 33

Photo 34

Support 6A: found to be in good condition


Photo 35

Overview at support 7

Pipe along 6A~7: rust bleed was observed;


recommend to
repaint
Photo 36

Support 7: found to be in good condition


DMNDT-15EM39-VI-03

Photo 37

Photo 38

Pipe along 7~7A: found to be in good condition


Photo 39

Overview at support 7A
Photo 40

Pipe along 7A~8: found to be in good condition


Support 7A: minor rust was observed between
I beam and pipe; recommend to clean and
repaint
DMNDT-15EM39-VI-03

Photo 41

Photo 42

Overview at support 8
Photo 43

Support 8: found to be in good condition at this


dummy support
Photo 44

Pipe along 8~8A: localized paint failure;


recommend to power tool and repaint
DMNDT-15EM39-VI-03

Overview at support 8A

Photo 45

Photo 46

Support 8A : found to be in good condition


Photo 47

Overview at support 9

Pipe along 8A~9: minor corrosion on weld and


rust bleed was observed; recommend to power
tool and repaint
Photo 48

Support 9: found to be in good condition


DMNDT-15EM39-VI-03

Photo 49

Photo 50

Pipe along 9~9A: minor paint failure on weld


area; recommend to clean & repaint
Photo 51

Support 9A: rust bleed was observed;


recommend to power brush and repaint

Overview at support 9A
Photo 52

Pipe along 9A~10: found to be in good


condition
DMNDT-15EM39-VI-03

Photo 53

Photo 54

Overview at support 10

Support 10: rust bleed was observed before


support 10; recommend to repaint

Photo 55

Photo 56

Pipe along 10~11: found to be in good


condition
DMNDT-15EM39-VI-03

Overview at support 11A

Photo 57

Photo 58

Support 11A: Support found to be corroded;


Recommend to power tool and repaint
Photo 59

Pipe along 11A to 12 found to be In good


condition
Photo 60

Overview at support 12

Support 12 : support in good condition minor


rust on the rack recommended power tool and
repaint
DMNDT-15EM39-VI-03

Photo 61

Photo 62

Pipe along 12 ~ 12A: found to be in good


condition
Photo 63

Overview at support 12A


Photo 64

Pipe along 12A to13 : found to be in good


Support 12A : corrosion was observed on pipe
condition
support; recommend to do surface preparation
and repaint
DMNDT-15EM39-VI-03

Photo 65

Photo 66

Overview at support 13
Photo 67

Support 13: Minor corrosion on I-beam;


recommend to do surface preparation and
repaint
Photo 68

Overview at support 13A

Pipe along 13~13A: found to be in good


condition
DMNDT-15EM39-VI-03

Photo 69

Photo 70

Support 13A: Moderate corrosion on I-beam;


recommend to do surface preparation and
repaint
Photo 71

Overview at support 14

Pipe along 13A~14 : found to be in good


condition
Photo 72

Support 14: Paint failure and minor corrosion


was observed on I-beam; recommend to
repaint
DMNDT-15EM39-VI-03

Photo 73

Photo 74

Pipe along 14~14A: found to be in good


condition
Photo 75

Overview at support 14A


Photo 76

Pipe along 14A~15: found to be in good


Support 14A: paint failure & minor corrosion on
condition
I-beam and pipe guide; recommend to do
surface preparation & repaint
DMNDT-15EM39-VI-03

Photo 77

Photo 78

Overview at support 15
Photo 79

Support 15 : minor corrosion and paint failure


on I-beam; recommend to do surface
preparation and repaint
Photo 80

Pipe along 15~15A : rust bleed was observed


Support 15 : minor corrosion and paint failure
near support 15; recommend to power tool and
on I-beam; recommend to do surface
repaint
preparation and repaint
DMNDT-15EM39-VI-03

Photo :81

ePhoto :82
w location @15-15A.
Recommendation : Need surface
preparation prior to painting

Overview of 8 RMS line found to be in good


condition@15-15A

Photo :83

Support found to be in good condition @1515A

Photo :84

@15A-16 overview of 8RMS line found to


be good condition

@16-16A pipe found to be in good condition.

DMNDT-15EM39-VI-03

Photo :85

ePhoto :86
w location @15-15A.
Recommendation : Need surface
preparation prior to painting

@16 support plate was severely corroded,


Recommend to power tool and repaint

Photo :87

@16A-17 Overview of the pipe found to be


in good condition.

Photo :88

@17-17A pipe found to be in good condition.

@17 support plate was severely corroded.


Recommend to power tool and repaint

DMNDT-15EM39-VI-03

Photo :89

ePhoto :90
w location @15-15A.
Recommendation : Need surface
preparation prior to painting

@17A-18 paint damage was observed.


Recommendation: Required power tool and
repaint

Photo :91

@18-18A overview of the pipe found to be


in good
Condition.

Photo :92

@18A-19 Overview of the pipe found to be


in good
Condition.

@ 19-19A Pipe found to be in good condition.

DMNDT-15EM39-VI-03

Photo 93

Photo 94

@19A-20 Overview of the pipe found to be in


good
Condition.

Photo 95

@19A Corrosion was observed on support


structure.
Recommendation : Required surface
preparation and repainting.

Photo 96

Overview at support 20 (No horizontal support)

Pipe along 20~20A: found to be in good


condition
DMNDT-15EM39-VI-03

Photo 97

Pipe along 20~20A: rust bleed was observed ;


recommend to do surface preparations and
repaint
Photo 99

Photo 98

Overview at support 20A


Photo 100

Pipe along 20A~21: rust bleed was observed ;


Support 20A: support and guide was corroded
recommend to power tool and repaint
and recommend to do surface preparation and
repaint
DMNDT-15EM39-VI-03

Photo 101

Photo 102

Overview at support 21
Photo 103

Support 21: Pipe shoe is heavily corroded;


recommend to replace the support, repaint the
I beam
Photo 104

Pipe along 21~22: intermittent rust bleed was


observed; recommend to do surface
preparation and repaint
DMNDT-15EM39-VI-03

Overview at support 22

Photo 105

Photo 106

Support 22: Heavily corroded; recommend to


do surface preparation and repaint
Photo 107

Pipe along 22~23: minor rust was observed;


recommend to repaint
Photo 108

Overview at support 23

Support 23: Support was heavily corroded;


recommend to do surface preparation and
repaint
DMNDT-15EM39-VI-03

Photo 109

Photo 110

Pipe along 23~23A: Minor rust was observed ;


recommend to repaint
Photo 111

Overview at support 23A


Photo 112

Pipe along 23A~24: minor rust was observed in


Support 23: Support was moderately corroded;
the loop ; recommend to repaint
recommend to do surface preparation and
repaint
DMNDT-15EM39-VI-03

Photo 113

Pipe along 23A~24: rust was observed at the


support; recommend to repaint
Photo 115

Photo 114

Small Bore Piping: minor corrosion; recommend


to repaint the valve and bolts
Photo 116

Pipe along 24~24A: good condition was


Support 24: support was heavily corroded;
observed
recommend to do surface preparation and
repaint
DMNDT-15EM39-VI-03

Photo 117

Photo 118

General view at support 24A

Support 24A: found to be in good condition

Photo 119

Photo 120

Pipe along 24A~25: good surface condition


was observed
DMNDT-15EM39-VI-03

General view at support at 25

Photo 121

Photo 122

At support 25: Support beam was heavily


corroded; recommend to power brush and
repaint
Photo 123

At Support 26: Sludge was observed with


moderate corrosion on pipe shoe; recommend to
clean the area, power tool and repaint
Photo 124

Pipe along 26~27: good surface condition was


observed

At Support 27: Sludge was observed with


moderate corrosion on pipe shoe; recommend to
clean the area, power tool and repaint

DMNDT-15EM39-VI-03

Photo 125

Pipe along 27~28: minor rust were observed.


Photo 127

Photo 126

At Support 28: Sludge was observed with


moderate corrosion on pipe shoe; recommend to
clean the area, power tool and repaint
Photo 128

Elbow/ pipe at deck 2/3 area: the surface


RMS after support 28 at the deck area; the
condition was satisfactory
condition was satisfactory including the small
bore piping
DMNDT-15EM39-VI-03

Photo 129

Deck piping: Oil stain and rust was observed;


recommend to surface preparation and repaint
Photo 131

Photo 130

SMP @ Deck piping: Oil stain , paint failure and


rust was observed with 2 gusset supports ;
recommend to surface preparation and repaint
Photo 132

Deck piping: paint failure, moderate corrosion


Deck piping: paint failure and heavy rust was
with scales were observed; recommend to
observed; recommend to surface preparation
surface preparation, do CVI and repaint
and repaint
DMNDT-15EM39-VI-03

Photo 133

Photo 134

SMP @ Deck piping: paint failure and heavy


rust were observed; recommend to surface
preparation and repaint
Photo 135

Deck piping: paint failure, moderate corrosion


with scales were observed; recommend to
surface preparation, do CVI and repaint

SMP @ Deck piping: paint failure and heavy


rust were observed; recommend to surface
preparation and repaint
Photo 136

SMP & Deck piping: paint failure and heavy


rust were observed; recommend to surface
preparation and repaint
DMNDT-15EM39-VI-03

Photo 137

Photo 138

Deck piping: paint failure, heavy rust were


observed; recommend to surface preparation
and repaint
Photo 139

SMP @ Deck piping: paint failure and heavy


rust were observed; recommend to surface
preparation and repaint
Photo 140

SMP @ Deck piping: intermittent minor paint


SMP @ Deck piping: intermittent minor paint
failure; recommend to surface preparation and
failure; recommend to surface preparation and
repaint
repaint
DMNDT-15EM39-VI-03

Photo 141

Photo 142

SMP @ Deck piping: intermittent paint failure


and heavy rust were observed; recommend to
surface preparation and repaint
Photo 143

SMP @ Deck piping: intermittent minor paint


failure; recommend to surface preparation and
repaint
Photo 144

SMP @ Deck piping: oil stain was observed;


recommend to surface preparation and repaint

SMP @ Deck piping: continuous paint failure


and heavy rust were observed; recommend to
surface preparation and repaint

DMNDT-15EM39-VI-03

Photo 145

SMP @ Deck piping: intermittent minor paint


failure; recommend to surface preparation and
repaint