MILL ELECTRICAL
PERFORMANCE
Monthly Report
PAGE: 1
PAGE: 2
Total Delay
2673 minutes
Acceptable Delay
1034 minutes
96 numbers
11 minutes
PAGE 3
PLANNED VS ACTUAL
PRODUCTION
ACTUAL DELAY
(min)
DATE
01.02.2015
68
02.02.2015
22
03.02.2015
04.02.2015
27
05.02.2015
35
06.02.2015
12
07.02.2015
16
08.02.2015
09.02.2015
26
10.02.2015
126
11.02.2015
17
12.02.2015
13
13.02.2015
68
14.02.2015
EQUIVELANT LOSS OF
EQUIVELANT LOSS OF PRODUCTION CUMULATIVE ACC. TO
PRODUCTION ACC. To PLAN
PLAN (MT)
(MT)
1792.85
84.66
84.66
1792.85
27.39
112.05
1792.85
6.23
118.28
1792.85
33.62
151.89
1792.85
43.58
195.47
1792.85
14.94
210.41
1792.85
19.92
230.33
1792.85
3.74
234.06
1792.85
32.37
266.44
1792.85
156.87
423.31
1792.85
21.17
444.48
1792.85
16.19
460.66
1792.85
84.66
545.32
1792.85
0.00
545.32
PAGE: 4
Copyright 2010 Jindal Steel & Power Ltd.
PLANNED VS ACTUAL
PRODUCTION
DATE
15.02.2015
20
16.02.2015
55
17.02.2015
37
18.02.2015
17
19.02.2015
20
20.02.2015
21
21.02.2015
15
22.02.2015
54
23.02.2015
149
24.02.2015
25.02.2015
101
26.02.2015
27.02.2015
47
28.02.2015
57
1792.85
24.90
570.22
1792.85
68.48
638.70
1792.85
46.07
684.77
1792.85
21.17
705.93
1792.85
24.90
730.83
1792.85
26.15
756.98
1792.85
18.68
775.65
1792.85
67.23
842.89
1792.85
185.51
1028.40
1792.85
3.74
1032.13
1792.85
125.75
1157.88
1792.85
7.47
1165.35
1792.85
58.52
1223.87
1792.85
70.97
1294.83
PAGE: 4
Copyright 2010 Jindal Steel & Power Ltd.
Area
Delay(in hr)
Frequency
Furnace
2.33
26
Mill
7.78
31
Cooling Bed
4.73
22
Media
0.26
Stacker
2.21
16
PAGE: 7
DELAY SUMMARY
PAGE: 7
DELAY SUMMARY
PAGE: 7
PAGE: 7
AREA
01.02.2015
12:44 13:00
16
MILL
01.02.2015
17:58 18:01
01.02.2015
18:31 18:51
20
MILL
01.02.2015
22:26 22:31
MILL
01.02.2015
0:41
1:04
24
02.02.2015
13:52 14:00
DATE
02.02.2015
15:14 15:28
14
03.02.2015
19:41 19:51
10
REASON
REMARKS
MILL
MILL
DATE
DELA
DELAY TIME Y (IN
MIN)
AREA
REASON
REMARKS
04.02.2015
11:16 11:27
11
MILL
04.02.2015
16:40 17:00
10
MILL
04.02.2015
4:24
4:27
04.02.2015
5:37
5:40
05.02.2015
15:15 15:25
10
05.02.2015
19:45 19:50
MILL
05.02.2015
20:45 21:05
20
MILL
MILL
06.02.2015
6:53
6:57
06.02.2015
12:38 12:46
06.02.2015
13:29 13:31
11
COOLING
CBCT-3 trip.
BED
MILL
BED
and the cut length.
COOLING
Delay due to CBCT-1 tripped.
BED
MILL
DATE
07.02.2015
DELA
DELAY TIME Y (IN
MIN)
6:56
AREA
REASON
6:58
Stacker
Auto cycle is not coming for LTF of both the Stacker ,MCB
tripped of both stackers.
Stacker
09.02.2015
9:22
10
Media
MILL
MILL
9:12
09.02.2015 23:55
0:15
09.02.2015
0:49
12
0:44
REMARKS
Stacker
COOLING Layer got stuck at tray transfer while transfer time from chain
BED
to tray.
COOLING
Delay due to CBCT-1 trip so layer got stuck in chain.
BED
DATE
10.02.2015
DELAY TIME
0:54
DELAY (IN
MIN)
AREA
REASON
3:00
126
MILL
14
FURNACE
11.02.2015
19:25
19:28
FURNACE
12.02.2015
15:05
15:08
Stacker
12.02.2015
16:40
16:42
Stacker
12.02.2015
20:22
20:24
Stacker
12.02.2015
23:34
23:38
41
Stacker
13.02.2015
MEDIA
13
9:38
9:50
REMARKS
DATE
DELA
DELAY TIME Y (IN
MIN)
AREA
REASON
Stacker
11
Stacker
13.02.2015
2:08
2:12
MILL
15.02.2015
8:02
8:07
COOLING
BED
COOLING
BED
COOLING
BED
MILL
16.02.2015
8:12
8:22
10
16.02.2015
Cumulative
Delay
10
16.02.2015
14
0:52
1:27
35
REMARKS
MILL
MILL
DATE
DELA
DELAY TIME Y (IN
MIN)
AREA
REASON
REMARKS
COOLING
BED
21
COOLING
BED
Stacker
17.02.2015
4:01
4:13
12
18.02.2015
8:05
8:08
17.02.2015
7:51
7:53
MILL
Stacker
Stacker
Cumulative
Delay
MILL
FURNACE
18.02.2015
15
DATE
DELA
DELAY TIME Y (IN
MIN)
AREA
REASON
19.02.2015
1:42
1:47
19.02.2015
1:58
2:13
15
COOLING
Delay due to chain transfer was tripped at finishing area.
BED
20.02.2015
7:37
7:45
COOLING Delay due to long length billet comes at charging area as its
BED
length was not sensed.
20.02.2015
Cumulative
Delay
MILL
Stacker
FURNACE
Cumulative
Delay
21.02.2015
16
MILL
REMARKS
DATE
DELA
DELAY TIME Y (IN
MIN)
AREA
REASON
Cumulative
Delay
FURNACE
Cumulative
Delay
10
MILL
MILL
22.02.2015
22.02.2015
17
21
MILL
Delay due to Std#14 & Std#16 gear box lub fault as cable
was damaged.
31
COOLING
BED
REMARKS
Press switch signal for lube of Std14,16 was healthy. Cable founded
shorted in JB. Signal forced and
made ok.
Material got overshoot as freeze &
switch brake command went late.
HMD-12A sensed longer time than
usual.
DATE
DELA
DELAY TIME Y (IN
MIN)
AREA
27
COOLING
BED
85
COOLING
BED
23.02.2015
4:37
Stacker
25.02.2015
9:17
65
MILL
25.02.2015
25.02.2015
1:43
2:22
18
14
Stacker
Stacker
COOLING
BED
18
4:29
8:51
1:08
2:08
REASON
REMARKS
COOLING
Delay due to CBCT-2 not going in home position.
BED
FURNACE Delay due to walking beam taking extra cycle.
DELAY
DELAY TIME (IN MIN)
01.02.201
14:27
5
14:32
AREA
REASON
REMARKS
COOLING Delay due to RES-2B pressure adjusted as its N/A as rotation was not ok due to
BED
rotation was not ok.
abnormal break pressure.
N/A as 11th pcs pf line-A hitted inside RES
Undershoot in line-A RES-2A as 2 pieces went & got stucked. Following pcs hitted & got
in same line.
undershoot. Everything was checked and
found ok from electrical side.
Cobble in line-B due to the RES-1B rotation
Rotation was not proper, due to uneven
was not proper meanwhile pass changed of
brake pressure, die to this head hitted at
Std#16 and all braking pinch rolls closed.
entry of RES.
Delay due to RES-1B & 2B rotation was not
N/A as rotation was not ok due to
proper , RES-1B & 2B synchronized and brake
abnormal break pressure.
pressure adjusted by electrical & mechanical.
01.02.201
16:55
5
17:17
22
MILL
01.02.201
22:51
5
23:26
35
MILL
01.02.201
5
2:44
2:52
MILL
02.02.201
5
6:52
7:30
38
MILL
Delay due to undershoot in line-A , last piece 'N/A as Everything was checked and
material stops after travelling 60m from RES. found ok from electrical side.
02.02.201
5
3:28
4:26
58
MILL
03.02.201
5
7:12
7:30
18
MILL
03.02.201
12:50
5
14:00
70
MILL
03.02.201
14:00
5
14:26
26
MILL
19
DELAY
DELAY TIME (IN MIN)
AREA
04.02.201
13:22
5
14:00
38
MILL
04.02.201
14:00
5
14:27
27
MILL
04.02.201
19:24
5
21:45
47
04.02.201
5
6:00
05.02.201
5
5:47
MILL
11:07
63
MILL
05.02.201
17:36
5
18:27
25
MILL
06.02.201
14:24
5
15:00
36
MILL
06.02.201
5
3:42
15
MILL
20
8:18
3:27
REASON
REMARKS
'N/A as Everything was checked and
found ok from electrical side.
'N/A as Everything was checked and
found ok from electrical side.
07.02.2015
08.02.2015
09.02.2015
09.02.2015
10.02.2015
10.02.2015
21
DELAY TIME
17:02
0:26
11:44
21:00
21:11
22:24
17:18
1:12
12:46
21:44
21:28
23:36
DELAY
(IN
MIN)
AREA
REASON
REMARKS
MILL
MILL
MILL
22
MILL
17
COOLING
BED
16
15
20
16
MILL
DELAY TIME
7:27
11.02.2015 16:24
11.02.2015
11.02.2015
2:03
7:50
18:56
2:38
DELAY
(IN
MIN)
AREA
23
MILL
152
35
5:21
5:44
23
12.02.2015 15:16
15:36
20
12.02.2015 15:37
16:01
24
13.02.2015 23:14
0:11
16
14.02.2015 15:41
15:55
14
22
MILL
MILL
REASON
Cobble in looper-3 due to uneven loop
formation in looper-1 for which tension was
given in each billet.
Delay due to undershoot in line-C as there
was no seperation on the last two piece
during this Std#10 , Std#14 & Std#16 pass
change done.
Undershoot in line-C due to bar was not
separate in 5th & 6th piece.
REMARKS
N/A as looper calibration was checked and
found ok.
N/A as 2nd last pcs of billet hitted
somewhere in rake so coming pcs hitted and
got undershoot. Everything was checked
and found ok from electrical side.
N/A as 5th pcs of billet hitted somewhere in
rake so coming pcs hitted and got
undershoot. Everything was checked and
found ok from electrical side.
DELAY TIME
DELAY
(IN
MIN)
15.02.2015 14:23
15:16
17
15.02.2015
1:43
21
15.02.2015
15.02.2015
16.02.2015
1:22
Cumulative
Delay
Cumulative
Delay
9:36
16.02.2015 18:35
16.02.2015 19:04
16.02.2015 19:30
19:02
19:29
20:12
13
16
27
25
42
REASON
21:05
30
REMARKS
MILL
MILL
MILL
16.02.2015 20:35
23
16.02.2015
9:52
13
AREA
MILL
DELAY TIME
DELAY
(IN
MIN)
AREA
17.02.2015 11:22
11:50
14
MILL
17.02.2015 12:12
12:52
40
MILL
17.02.2015 17:33
17:46
13
MILL
17.02.2015 21:07
21:22
15
MILL
17.02.2015 21:24
21:44
20
MILL
17.02.2015
1:11
1:57
15
MILL
18.02.2015
8:40
8:49
MILL
18.02.2015 23:25
24
23:53
29
REASON
REMARKS
18.02.2015
DELAY TIME
3:24
19.02.2015 14:08
20.02.2015 11:07
25.02.2015
26.02.2015
26.02.2015
25
14:19
11:44
33
11
37
AREA
MILL
MILL
MILL
REASON
REMARKS
25.02.2015 17:12
25.02.2015
4:30
DELAY
(IN
MIN)
17:39
13
MILL
Make
Qty
DATE
Item
AREA
01.02.2015
MCB,32A,4P
Module shop
05.02.2015
Socket,15A
Roll shop
05.02.2015
Wooden board,6X4
Roll shop
04.02.2015
70W bulb
04.02.2015
Choke,70W
04.02.2015
Al lug,95 sqmm
welding m/c
06.02.2015
Plug,15A
Roll shop
07.02.2015
PVC board,8X10
CP-2
07.02.2015
16A socket
CP-2
07.02.2015
switch
cp-2
08.02.2015
Positioner,
DVC,6020
Line-A 2nd WB
10
Furnace
Furnace
1
2
3
4
5
6
7
8
9
10
11
12
13
26
09.02.2015
09.02.2015
Glass relay,24VDC
PVC
board,8X10X12
Qty
09.02.2015
Socket,20A,10A
1+1
Furnace
10.02.2015
Carbon brush
cp-2
10.02.2015
Starter
11.02.2015
40 mtr
Entry sw pipe
11.02.2015
Tube , 18W
ECR-2
11.02.2015
Pantry
Furnace
11.02.2015
Lamp,70W
Nut bolt,M8X100
mm
Industrial plug top,
30A, 3 pin
Furnace
13.02.2015
O2 analyser
1 set
Furnace
13.02.2015
Furnace
MLDB-1
MLDB-1
MLDB-1
MLDB-1
11.02.2015
13.02.2015
25
13.02.2015
27
Make
Item
24
26
DATE
13.02.2015
13.02.2015
AREA
30
31
32
33
34
35
36
37
38
39
Make
Qty
Item
14.02.2015
Lug, ring,Cu,0.5
sqmm
O2 analyser
17.02.2015
Battery, 12V
17.02.2015
Battery, 6V
Emergency light
17.02.2015
MCB,10A
ECR-3
18.02.2015
Pulse amplifier
ECR-1
18.02.2015
MCB,32A,4P
ECR-1
18.02.2015
Industrial
socket,30A
Lube-A
18.02.2015
Industrial
socket,20A
Lube-A
18.02.2015
Screw
10
Lube-A
19.02.2015
PVC fan
Cooling bed
20.02.2015
Cooling bed
20.02.2015
4CX1.5 sqmm
cable
15 mtr
Module shop
28
29
DATE
AREA
Make
Qty
DATE
Item
AREA
20.02.2015
Screw
Module shop
20.02.2015
Hose pipe
1 roll
stand-15
21.02.2015
Industrial socket
20A
Furnace
21.02.2015
Indication
LED(RED) -220V
HYD-AA1
22.02.2015
Furnace
23.02.2015
6292Z bearing
ECR-1
24.02.2015
Encoder, 1024
RES
Furnace
Furnace
Central electrical
40
41
42
43
44
45
46
47
48
49
25.02.2015
Nut bolt,
M10X100mm
Welding
rod,3.15mm
26.02.2015
MCCb, 250A
25.02.2015