Documente Academic
Documente Profesional
Documente Cultură
Tower Cost/Implementation
Analysis
Engineering - June 2014
1. Cost Comparison
Initial Design ( 6.9 sqm ) 2 Carriers
2. Fabrication Process
No
Analysis Item
1 Raw Material :
- Availability
- Cost
Tower 3L Tubular
Tower 3L Angular
Recommen
ded Tower
Type
Angular
Tower
- 10% - 15% higher than angular. - 10% - 15% lower per KG pricing.
2 Fabrication :
- Process
- Cost
Angular
Tower
3 Final Product :
- Weight
- price per kg
4 Delivery/Transporta
Angular
Tower
3. Implementation Process
No Analysis Item
Tower 3L Tubular
Tower 3L Angular
1 Checking and
Sorting Materials
Less quantity of parts per tower Higher quantity of parts per tower
(more easier)
(consists of
many small parts)
2 Delivery
- Dimension material impact to
The dimension more compact for
trucking
packing
volume
requiring less physical space per
- Parts do not stack as neatly
tower
3 Material handling - Possibility of many materials
- Compact packaging/stacking can
are bent related to reckless
reduce
loading or unloading processes
damaged parts. Parts are easier to
- Bent flanges most common
replace as
issue, these
most parts are independent pieces
are hard to fix/replace once in
the field
4 Material Quality
- It need a special checks
- Minimal welding material, most
associated with
members are
the welding quality on the pipe.
mechanically connected by fasteners
- It is difficult to check the
(bolt and
thickness of
nut)
the pipe in the field against
- Member thickness can be easily
design
measure in
- Hard to ensure galvanization
the field.
- Galvanization can be visually
completeness especially
inspected and
internal to the
checked using thickness readers on
tower legs
all sides of
parts.
5 Upgrade capacity
Recommen
ded Tower
Type
Tubular
Tower
Angular
Tower
Angular
Tower
Angular
Tower
Angular
THANK YOU