Be Focused, Be Professional,

Be Noted
by Haier-SODINCO in Algeria

Outline
Focused on technology and service
1) SODINCO CAC business Start
2)Powerful professional team
3)Professional marketing
4) Case Study
5) Duct Factory

SODINCO CAC BUSNIS START


2001: SODINCO install the first MRV systems in Algeria. About 10 systems
MRVI R22, with convertible type indoor unit has been installed.
2004: SODINCO get the second project of MRVI R22, with convertible type
indoor unit (French Embassy).
2006: SODINCO create its engineering department and start effectively the
CAC business (07 HVAC engineer are working in full time).
2007 : SODINCO create its own installation team. The first experience in
Algeria Market.
Now 20 installation team are working. Each team is composed with 04 to
05 person.
2011: SODINCO develop the maintenance contract activity with VIP
consumer.

POWERFULL PROFESSIONNEL TEAM


STRONG ENGENNERING DEPARTEMENT:
About 07 engineer are working full time for CAC business.
STRONG INSTALLATION TEAM
20 installation team are working in different project. Each team is
composed of 04 to 05 person
STRONG AFTER SALES SERVICE
04 after sales team, insure the 03 years warranty guaranteed by
SODINCO
STRONGE MAINTENANCE CONTRACT DEPARTEMENT SERVICE
04 Maintenace team working specially with VIP consumer. A reparation
delay could not exceed 24 hours for these consumer.

POWERFULL PROFESSIONNEL TEAM


Picture of glance of Haier Sodinco
Transportation team:
Accessories supporting

POWERFULL PROFESSIONNEL TEAM


Certificate of Training issued by Haier 10 years around
ago.
Story of LG and Tossiba wanted to hunt all SODINCO
technical & sale teams.

PROFESSIONAL MARKETING
Marketing: Professional Fair and Conference
To promote the New Technology, new product and
concept.

Case Study
Case Study
1. High end residency: Mobil Art, PROMOTION
BELAZOUG, PROMOTION BENSMAINE
2. Bank : AGB BANK
3. Office: TAPIS DOR, UOT TIPAZA
4. Hotel: ATLANTIS HOTEL AKBOU
5. List of Reference Projects

Pa rt o f
Refere nce Pro jects

High end residency: Mobil Art


Bahia Center (Mobil art
No. of Floors: 30
No. of Building 4
Type: Apartments and office
Total system: 480
Project achieved at :95%
MRVII-S :
OUTDOOR UNIT: AU48NFIERA AND
AU60NFIERA,AV08-AV16NMVERA
INDOOR UNIT : Duct type low static
pressure
AD092MLERA, AD122MLERA,
AD182MLERA
AB182MCERA, AB242MCERA,
AD282MMERA

High end residency: Mobil Art

High End Residency:


BELAZZOUG
SARL PROMOTION BELAZZOUG
1. No. of floors: 38
2. Floor area:100-120 M2
3. Haier solution:
MRVII-S :
OUTDOOR UNIT: AU48NFIERA
AND AU60NFIERA
INDOOR UNIT : AD092MLERA,
AD122MLERA, AD182MLERA
Project started on August 2014

SARL PROMOTION

High End Residency:

SARL BENSMAINE

PROMOTION
Project name: BENSMAIN PROMOTION
PROJECT:
No. of floors: 12
No. of apartments: 48
Floor area:100 m2
Haier Solution: Slim Duct with Haier Grill
panel with digital display
Capacity: 12/18
System no. 192
Project started on September 2014.

BANK : AGB CASE (VIP CONSUMER)


AGB bank (GULF BANK ALGERIA )
Total 78 branches all over Algeria,
Product type: MRVII-C
Indoor unit. Medium duct type , cassette type
A very professional consumer, requiring a high level
service.
SODINCO offer to this VIP consumer:
Professional installer team
Professional after sales team: 24 hours to make the
reparation if any trouble all over Algeria.

BANK : AGB CASE (VIP CONSUMER)

BANK : AGB CASE (VIP CONSUMER)

OFFICE: TAPIS DOR


1. No. of floors: 2
2. Floor area:2000 M2
3. Haier solution:
MRVII-C :
OUTDOOR UNIT: 09 :
AV16NMVERA
INDOOR UNIT : AD182MMERA,
AD242MMERA, AD282MMERA,
AD302MMERA
Project already finished 100%

OFFICE: TAPIS DOR

OFFICE: UOT TIPAZA


1. No. of floors: 3
2. Floor area:1600 M2
3. Haier solution:
MRVII-C :
OUTDOOR UNIT: 06 : AV10NMVERA
INDOOR UNIT : 55 INDOOR UNIT :
AB092MCERA, AB122MCERA,
AB162MCERA, AB182MEERA,
Project already finished 100%

OFFICE: UOT TIPAZA

HOTELS: HOTEL ATLANTIS AKBOU


1. No. of floors: 5
2. ROOMS:200
3. Haier solution:
MRVII-C :
11 : OUTDOOR UNIT: AV08AV16NMVERA
INDOOR UNIT : AD092MLERA,
AD122MLERA,
AD162MLERA,AD182MLERA,
AB092MCERA, AB122MCERA,
AB162MCERA, AB182MEERA,
AB242MEERA
Project :80 %

HOTELS: HOTEL ATLANTIS AKBOU

DUCT FACTORY
According to the importance of the
duct work in HVAC installation, and in
order to improve its installation
efficiency, SODINCO has installed
this year its own duct factory.
With this new investment, SODINCO
reduced its installation delay,
reduced its project cost and have
now more possibilities to get new
projects.

DUCT FACTORY