Sub Grade
Subgrades are commonly compacted before the
construction of a road, pavement . The subgrade is
the foundation of the pavement structure, on
which the subbaseis laid.
Preparation of the subgrade for construction usually
involves digging, in order to remove surface
vegetation,topsoiland other unwanted material,
and to create space for the upper layer of the
pavement. This process is known as "subgrade
formation" or "reduction to level".
The load-bearing strength of subgrade is measured
byCalifornia Bearing Ratio(CBR) test,falling weight
deflectometerback calculation sand other methods.
Sub base
subbaseis
the
layer
ofaggregatematerial
laid
on
thesubgrade.. Subbase is often the main load-bearing layer
of thepavement.
Its role is to spread the load evenly over thesubgrade. The
materials used may be either unbound granular, orcementbound.
Unbound granular materials are usually crushedstone,
crushedslagorconcrete, orslate.
Minimum thickness design are based on the force applied on
the road.
Binder Course
Surface course
Tack Coat
Tack coat (also known as bond coat)
is a light application of asphalt
emulsion between hot mix asphalt
layers designed to create a strong
adhesive bond.
Without tack coat the asphalt layers
in a road way may separate which
reduces the strength.
Tack Coats
Tack coat is a browny-black emulsion of bitumen that is
applied to the prepared, existing surface before laying the
wearing course. The emulsion bonds to the existing
surface,
and then the new wearing course will bond to the
emulsion, ensuring full adhesion. It also helps ensure that
water does not find its way between the new and existing
surfaces where it can freeze and lift off the new surface.
wearing course is laid over a recently laid (ie, within the
preceding 7-14 days) base course.