Documente Academic
Documente Profesional
Documente Cultură
Content
NTC
DPC
Spectrum analyzer
Content
PSTN
Core Network Planning (CS/PS Domain)
RAN
RNP
UE
RNC
TNP/CNP
CN
c
o
v
e
r
a
g
e
Quality
Capacity
Profit
-investment
ratio
Cost
NodeB1
NodeB3
NodeB4
NodeB2
We need a network
like this:
satisfied coverage,
lower cost,
larger capacity,
better quality.
RNO
Equipment
Installation
Initial Test
Network
Performance
Evaluation
Site Survey
Network
Preamble Code Plan
Adjustment
Suggestions
LAC Plan
Capacity Plan
Site Survey
Coverage Prediction
Propagation Model
Coverage Plan
NodeB
NodeB Database
Database
Recourse
Recourse Configuration
Configuration
Parameters
Parameters Plan
Plan
Start
Information collection
Preparation of RNP
Nominal planning
Interference measurement
Propagation mode tuning
Site survey
Capacity planning
Parameters planning
Data configuration
Initial tuning
RNP acceptance
End
coverage
capacity
quality
cost
Number of Bins
5000
4000
3000
2000
1000
0
-48-44-40-36-32-28-24-20-16-12 -8 -4 0 4 8 12 16 20 24 28 32 36 40 44 48
-1000
Error (dB)
tuned
Non-tuned
GPS
Test
mobile
I am doing
initial tuning
Hello!
Hello?
?
You did
a good
job!
Indoors station
Indoors station
Indoors station
LAC3
LAC1
LAC2
Major street
LAC dividing line
Related
parameter
Paging capacity
Location update
Macro cell
Channel Configuration
Content
Target of RNO
Network status analysis
Data collection
Data analysis
RNO scheme and carry out
Problem solved
Y
Evaluate (OMC, DT)
RNO acceptance
End
We should
confirm the
target of RNO
within this
week!
Network structure
information
Database of BTS
Service area visit
Network quality evaluation
Utilization of the cells
Hot spot traffic distribution
NodeB1
NodeB3
NodeB4
NodeB2
Traffic statistics on
OMC
Subscriber
complaints
Alarm! Alarm!!!
Drive
test
Alarm list
Statistics analysis
Parameter analysis
Alarm list analysis
Drive test analysis
Subscriber complaints analysis and trouble
shooting
Test
mobile
Coverage
optimization
Capacity
optimization
optimization
Call quality
HO success
optimization
Worst cell
optimization
Traffic load
optimization
optimization
Utilization
Call trop
optimization
Congestion
optimization
880
Before optimization
500
After optimization
G1800
0
36
109
20
67
33
100%
80%
40%
0
No G1800
40%
88
80%
392
100%
40
G900
11
: extension urgent
:extension needed
:TRX remove
:parameter adjust
> - 95.0
- 95.0
to - 85.0
- 85.0
to - 75.0
- 75.0
to - 65.0
> - 65.0
0%
2%
16%
29%
53%
< -14.0
-14.0
to - 12.0
-12.0
to - 10.0
-10.0
to - 8.0
-8.0
to - 6.0
> -6.0
0.16%
0.63%
2.41%
7.46%
17.40%
71.94%