Overview
Transformer
Transformer
Substation
Substation
220KV
220KV Transformer
Transformer
Substation
Substation
35KV
35KV Transformer
Transformer
Substation
Substation
Plant
10kVA
10kVA Sub_busbar
Sub_busbar loop
loop
10KV
10KV Switchgear
Switchgear
Funcational
Funcational Location
Location
Equipment
Equipment
Building
Building Establishment
Establishment
Loop
Loop
BLOWER
BLOWER
1#
1# main
main transformer
transformer loop
loop
SF6
SF6 breaker
breaker
3150A/40KA/35KV
3150A/40KA/35KV
35KV
35KV #1
#1 MTF.
MTF.
over-load
over-load protect
protect
U75,
U76
PM Organization
Structure
Basic Definitions
1.
2.
3.
4.
available
PM Technical Objects
Equipments and Functional Locations are basically the PM technical
objects.
Equipment master record : IE01/IE02 , mainly data related to
permits,warranties,measuring points are maintained . Tables
EQUI,EQUZ.
Functional Location master record : IL01/IL02 and data related to
permits,warranties,measuring points are maintained . Tables
ILOA,ILOAT.
The technical system is represented by creating equipment and
installing equipments at Functional locations.
Functional locations are created using Structure Indicator defined
in configuration.
AC Plant Unit
1PC-PP2-UTI
Spare Parts
Refurbishment
Management
Completed Maintenance
Order Process
Logistics
Safety Management
Raw Material
Procurement
Work Clearance
Management
Overhaul
Maintenance
Overhaul
Management
Preventive
Maintenance
Preventive
Maintenance
10
6.
11
Breakdown Maintenance
12
Maintenance Notification
Notification is basically a document to record faults in PM and in SAP it
raised in IW21and object code ,damage code and cause code are entered
and notification is released
13
Breakdown Maintenance
Maintenance Order is created in IW31/IW32
14
Breakdown Maintenance
TECO of Maintenance order in IW32:
TECO : Clears open reservations , deletes left out PRs [Purchase
15
Breakdown Maintenance
Notification is closed once TECO is done and equipment breakdown hours is
calculated .
Reports MC17,MCJB,MCJC can be used for MTTR [Mean Time to Repair] and
MTBR [Mean Time between repair] calculations.
16
Preventive Maintenance
Types of Preventive Maintenance :
1.Time Based Single Cycle Plan :Maintenance of Vehicle for every 3 months.
2. Performance Single Cycle Plan: Maintenance of Vehicle for every 1000km.
3. Strategy Cycle Plan :a) Time Based Maintenance of a vehicle for every
three months, six months,1 year
b) Performance Based-Maintenance of a vehicle for
every 1000km,2000km,3000km.
4. Multiple Counter Plan : a) With Single Cycle Set :Maintenance of a
Vehicle for every 3months or 500km .
b) With Multiple Cycle Set :Maintenance of a
Vehicle for every 3months or 500km and
6months
or 1000km.
17
Preventive Maintenance
Structure of MP : This contains scheduling parameters and Maintenance
items .
One MP can contain any no of maintenance items and call objects for one
Call objects are generated with an interval of cycle mentioned in MP and for
18
Preventive Maintenance
Scheduling of MP : Tcode IP10 is used for scheduling a MP and here the list
19
Refurbishment Process
This process is carried out for high costly spares and important from
production prospective . The order type mostly used for this is PM04 and
we can also define new order type as per the requirement.
20
Refurbishment Process
Initial Stock of Refurbished Material in store .
Material to be refurbished is picked from C3[Damaged Spare] and after
21
Refurbishment Process
Refurbishment Order is created using IW81 and after release material is
22
Calibration process
Calibration Process : This is carried out to check the working condition of
the equipment.
order PM06 .
The task list can be used for maintaining inspection plan in IP41 or can be
23
PP
Availability of machine work center
CO
Maintenance costs
Internal activity allocation
Order settlement
PS
Availability of funds
Maintenance budget
AM
Tangible assets
Acquisition value
Residual book value
SD
Maintenance of external devices
FI
G/L standard chart of accounts
Invoice receipt
HR
Work time entry via CATs
QM
Maintenance of test equipment
Questions
Questions ??