Concrete Construction
Table of Contents
Vertical formwork systems (wall & column systems)
Horizontal shoring systems (flying systems &
stationary systems)
Factors Affecting Formwork & Shoring Designs
PG 02
Concrete Construction
PG 03
PG 04
PG 05
Duration of project
Future usage
Return on investment
Maintenance expense on owned equipment
Storage expense
PG 06
PG 07
PG 08
PG 09
PG 010
PG 011
PG 012
Power Plants
Bridges
Tunnels
Commercial
Building
PG 013
PG 014
PG 015
PG 016
Solution:
Rollback Jump Form
PG 017
PG 018
30
PG 019
PG 020
PG 021
PG 022
PG 023
Applications
Parking Garages
Truss Table Shoring
PG 024
PG 025
PG 026
PG 027
PG 028
PG 029
PG 030
16
PG 031
PG 032
PG 033
Application:
Faster cycle times on flat slab
structures.
2 x 6 Aluminum Deck panels, shore
points are on a 6 x 8 grid
PG 034
PG 035
Application:
Used to speed construction on multilevel building.
1st Floor shoring: Trusses are supported
on hand-set Shore X Frames
PG 036
7 & 10 crossbraces
Extension legs Jacks
12 18
18 24
24 30
Lowering devices
Stripping & flying
Fillers
PG 037
PG 038
PG 039
PG 040
PG 041
PG 042
PG 043
Duration of project
Future usage
Return on investment
Maintenance expense on owned equipment
Storage expense
PG 044
PG 045