Engineering :
Submission of Material
Approval Submittal
Procurement
(MAS).
: Placement of Purchase
Approval of MAS.
Order on Vendors.
Appointment of Sub
th
By 15 July 16.
Contractor.
By 15h July 16 20th
July 16
HSSE :
BOSEIT /OPTIO
Trainings for
Employees.
Medical Fitness
Certificates.
BG Pass for M/s Trizac
Employees.
By 15th July 16
Site
:
Management
Site Survey for the
Platform
Site Survey Report
Submission
Submission of Field
Engineering Drawings
for Approval.
By 18th July 16 25th
July16.
Project Organogram
Aparna Salvi
General
Manager
Nitin Gawde
Project
Manager
Construction
Manager
Mr. Pradeep
Joshi
HSSE Lead
Arvind
Darekar
QA/QC
Manager
Lead
Electrical
Sumeet
Sanghvi
HSSE officer
Permit
coordinator
Fireman
Electrical
Lead
QA/QC
Akshay
Gangadhar
Telgu
Structural
Lead
Project
Planner
Bharath SR
Electrical
Supervisor
Structural
Supervisor
Structural
Team (Fitter,
Welder,
Rigger,
Painter,
Helpers)
Logistics Coordinator
Construction
Manager
Pradeep
Joshi
Electricians
& helpers
Offshor
Onshor
HSSE
1
Documents to be prepared
HSSE
2
Training Required
HSSE
3
Inspection
HSSE
4
Personal Competency
Meeting
5.1 BBS
5.2 Weekly/Monthly Report
5.3 TBT
HSSE
6
Materials
HSSE
7
Compliance
HSSE
9
Constraints
HSSE
9
Constraints
Contracts &
Procurement
1
2
3
4
5
6
QA/QC
M/s BG shall provide M/s Trizac the Standard Procedures
1 for Fabrication, Painintg along with the templates such as
SQ & TQ etc.
2
QA/QC
5
6
7
8
9
10
11
12
Document Control
1
Email ID Submission
Team Assignment
Aconex Training
6
7
Project Management
Sr
No
1
2
3
3.1
3.2
3.3
3.4
4
4.1
4.2
4.3
Points Discussed
Site survey/ POB option
HAZID construction plan
Documentation
o Permit
o Checklist
o TRA
o Work pack/Method statement
List of things to be carried offshore
o Laptop
o Printer & cartridge
o Stationary
Project Management
5
6
7
8
9
10
11
11.1
11.2
11.3
11.4
11.5
11.6
Project Management
12
Project Control
1
2
3
4
5
6
7
8
Project Control
9
Engineering
1 DCI to be prepared by TPAEC and submitted to BG
2
2.4
Engineering
Document number to be revised with reference to
discussion with document controller.
The data sheets shall be in the same format as in feed
6
document. Vendor shall fill the compliance column.
All calculation must be revised with reference to Pre
7
engineering site survey.
5
Engineering
Comment resolution sheet to be provided by Trizac upon
receipt of comments from BG
TBE for information only if and only if the vendors are in
13 approved list and complies to the specification and data
sheets.
12
Engineering
19 Personnel to attend pre engineering survey
19.1Design Engineer
19.2Draftsman
19.3Construction engineer
19.4Structural Engineer
19.5Structural fitter
19.6Structural fitter
19.7Surveyor
19.8Fabrication contractor
Engineering
20
21
24
25
Material Management
1
2
3
4
5
Material Management
9
10
11
12
13
14
15
16
Material Management
17 All materials to be sent with standard CHU size.
18
Open Points
1
2
3
4
5
6
Open Points
13 Medical tie ups required to be made with 24/7 support.
Responsible person required for post MEDEVAC with back
14
up.
15 Medical Emergency Response plan to be made.
16