Sunteți pe pagina 1din 23

Project Training Seminar

on
RAPDRP
Presented by

Jagrati Sharma

11EVCS017
-Under
Ms. Roopal Saxena
(Training Co-ordinator , HCL , Jaipur)

CONTENTS
Introduction
Coverage of Scheme
Scope
Technical Requirements
Modules
Sub-modules
Description
Snapshots
Thank you
Query

Introduction
RAPDRP
(Restructured Accelerated Power Development & Reforms
Program)
The project was started on 9/02/2009.
RAPPDRP is a GoI's initiative with focus on establishment of baseline data and fixation
of accountability and reduction of AT&C losses through strengthening and upgradation
of Sub-Transmission and Distribution network and adoption of IT during 11th plan. It
depicts the physical practice of Discom people. It is a web based application.

Coverage of Scheme
It is mainly divided as
JVVNL (Jaipur Vidyut Vitran Nigam Ltd.)
JDVVNL (Jodhpur Vidyut Vitran Nigam Ltd.)
AJVVNL (Ajmer Vidyut Vitran Nigam Ltd.)

Urban areas-towns and cities with population of more than 30,000 are covered for
implementation.
Projects under the scheme are taken up for two parts :Part A:
It covers projects for establishment of baseline data and IT applications for energy
auditing and consumer services.
Part B:
It covers system renovation, modernization, strengthening and augmentation of 11kV and
33kV network.

SCOPE
The main focus of Part - A programme is actual demonstrable performance in the
sustained loss reduction , establishment of reliable and automate system for
sustained collection of accurate baseline data.
In Rajasthan total 87 towns have been identified which are having population 30,000
or more , for which detailed project reports were sanctioned on 20/02/2009 by
Ministry of Power Govt. of India.

TECHNICAL
Front End:
REQUIREMENTS
.NET is used to design the web application . It is a user friendly platform to
design a web based application as it uses the drop n drag feature eliminating the
need of remembering heavy codes.
Back End:
SQL 2008 is used as the back end to store the data. It acts as a suitable database to
manage the data without redundancy.
The main DC(Data Centre) is located in Jaipur whereas a extra DRC(Disaster
Recovery Centre) is situated at Jodhpur where the data stored at the main centre is
transferred in every 15 minutes.

Modules
M : Metering
B : Billing
C : Collection
NC : New Connection
DC : Disconnection
MIS : Management Information System
GIS : Geographical Information System
IAM : Identity & Access Management System

AM : Asset Management
MM : Maintenance Management
EA : Energy Audit
NA : Network Analysis
WSS : Web Self Service
CCC : Centralized Customer Care Service
SS : System Security
MDAS : Meter Data Acquisition
CCD : Customer Consumer

Database

SUB-MODULES
The other two sub-modules are:Vigilance
Inventory

A further description of
MODULES
Metering : It deals with the total consumption , actual readings etc.
Billing : It deals with the bill rating at every particular connection.
Collection : It collects the rating for each particular reading.
New Connection : This module is used to develop a new connection
that is employing a new meter.
Disconnection : It deals with dismantling any meter permanently or
temporarily.

Management Information System : It provides information about the whole


management no. of connections, no. of disconnections, output reports, bifercations
in report. It also provides JV reports including compensation, sundary report on
wrong bills and power violation, realization and assessment of the capital flow
involved.
Global Information System : It provides information about the whole network. It
reports for each feeder, cabling of each wire,
each connection, all the poles, DT's, etc.

Identity & Access Management : Each user is provided with a unique user id
which is based on designation as it does not change with the user. An example of a
user id is as : ARO_A1_JCC where ARO - user name, A1 - Office/Sub Division,
JCC - Division.
Asset Management : It deals with the management of network and non - network
assets.
Maintenance Management : It deals with the predictive and non - predictive
maintenance.
Energy Audit : It deals with the overall consumption and losses of energy. Each
feeder has its own feeder id in order to know the last node.

Network Analysis : It provides the analysis of overall network i.e.


number of cables from a sub - division, number of poles from a DT,
number of consumers from a DT, etc.
Web Self Service : It a web application which provides all the
information about electricity and allows the consumers to access their data.
System Security : It is the only module which is not viewed on
the system. It is an admin controlled module.

Centralized Customer Care Service : This consumer affair module deals with
the general issues about the malfunctioning of the DT's oil
leakage, etc.
Meter Data Acquisition System : A chip set comprises of 3 items :
Product, Sim and Connectivity is used for acquiring data of the
meter that what actual reading is going on.

The two SUB - MODULES

Vigilance : It deals with all the legal affairs of both the consumer related
issues and non -consumer related issues.
Inventory : It is basically the store related module. It deals with the
number of connections, number of DT's, etc.

SNAPSHOTS

THANK
YOU !!

S-ar putea să vă placă și