SURATGARH THERMAL

POWER STATION

SUBMITTED TO:
MISS SHIVANI JOHRI

SUBMITTED BY :
VINAY SAINI
ROLL NO.13ESBEE042

..
..

CONTENTS
INTRODUCTION
LOCATION
BLOCK DIAGRAM
CONSTITUENTS
1
2
3
4

COAL HANDLING PLANT


ASH HANDLING PLANT
WATER TREATMENT PLANT
BOILER, TURBINE, GENERATOR AND CONTROL UNIT

Introduction of Thermal power


Plant: S.S.T.P.S. is designed in six stages
STAGE I - 1x250 MW
STAGE II - 1X250 MW
STAGE III - 1X250 MW
STAGE IV - 1X250 MW
STAGE V
1X250 MW
STAGE VI - 1X250 MW
STAGE VII1X660MW(Under construction)
STAGE VIII1X660MW(Under construction)
Total Power Generation - 1500 MW

LOCATION

.
.

Suratgarh super thermal power station is located


27 km away from Suratgarh town in
Ganganagar Dist. on the left bank of IGNP at Up
Stream of Suratgarh Barrage.
This station is operated and maintained by Rajasthan
Vidhyut Utpadan Nigam Limited.

BLOCK DIAGRAM OF THERMAL POWER


PLANT

Train containing coal


Wagon Tripler

Rotary Breaker

Coal stock pile

Railway yard

Transfer Point

Bunker

Mill

Hopper

Boiler.

Thermal Power Plant


Constituents: The Thermal Power Plant is basically divided into
four parts. They are as follow: 1. Coal Handling Plant (CHP): - Fuel from the storage

is fed to the boiler through fuel handling device. The


fuel used in S.S.T.P.S. is coal, which on combustion
in the boiler produces ash.
2. Ash Handling Plant (AHP):- The ash produced is

collected in the boiler and is removed to ash storage


tank. Ash produced are of two types: -

(i) wet ash


(ii) dry ash
In S.S.T.P.S both types of ash are utilized in an
economical way.

3. Water Treatment Plant: - In Water


Treatment Plant Water is treated so that
no impurities are left in the water to make
it suitable for the working process of
Power Plant.
4. Boiler, Turbine, Generator and Control
Unit: These are the
parts where steam is generated and
operated. In the Control Unit each and
everything is controlled including auxiliary
as well as main equipment.

1. COAL HANDLING PLANT (CHP)

The function of CHP is automatic feeding of coal


to the boiler furnace. The coal is transported to the
power station by rail..About 18000 tonnes coal
required per day for whole unit.

Overview of coal handling


plant
Raw coal from
bharat coal ltd.
Dhanbad &
bilaspur(MP)
bunkers

Raw coal
feeders

To SSTPS from gudla


via a single railway
track

Crusher house

Coal mills
(pulverization)

Boiler furnace ( tangential firing


of pulverized coal)

Wagon
tippler

hoppers

2. ASH HANDLING PLANT (AHP)


Coal contains a considerable amount of ash. The
percentage of ash in the coal varies from about 5% in good
quality coals to about 40% in poor quality coals.
Generally poor quality coal is used in steam power plant, so
the plant produces hundred tones of ash daily.
For removal of ash from the boilers and its disposal to the
suitable site is quite difficult.
Ash handling comprises the following operation:
1. Removal of ash from the furnace ash hoppers.
2. Transfer of ash to a fill or storage
3. Disposal of stored ash.

3.

Hydraulic system:

In this system stream of water carries


ash along with it in a Closed channel and disposes it of
to the proper site. This is the healthy clean dustless and
completely enclosed system.
The water is used again while the ash is sent out
through the carriages.

4. BOILER:
It is a closed vessel in which water is heated
to generate steam.
stack

DM water

Boiler water tubes


& various stages

Super
heated
steam

Flue gases
Air from
environment
via draft fans

Pulverized
coal

Boiler
furnace

Ash
handling
plant

GENERATOR:
MECHANICAL
ENERGY

GENERATOR

ELECTRICAL
ENERGY

Shaft is connected to a generator. This generator


produces the electricity required. From this point the
electricity produced is sent to the Electrical Switchyard
via transformers. Since generator is producing
electricity and is working continuously heat is
generated in this part also. And hence cooling of
generator is also important.
Generator is cooled using Hydrogen Gas.

TURBINE
In a Thermal Power Plant generally 3 turbines are used to increase
the efficiency.

.High Pressure Turbine(HPT): The superheated steam is directly

fed to this
turbine to rotate it.
Intermediate Pressure Turbine(IPT): The out put from the HPT is
reheated In a reheated(RH) and used to rotate IPT .
Low Pressure Turbine(LPT): The Exhausted steam from the IPT is
directly
fed to rotate the shaft of LPT.
Super
Heater

Steam
Shaft

HPT
HPT
RH

IPT
IPT

LPT

LPT
Steam

Condenser

Generator

Control Unit : In Control Room various controls are

provided simultaneously various


measurement are made. The unit Control
Room has a set of parameter panels for
indicating and recording parameters of
boiler and turbo sets