Enhanced Oil Recovery (EOR)

EOR Screening using IOR


Predictive Software
th

Sudapet H.Q
to 16th May 2013

Khalid Abdulbasit_ RE_


Sudapet

12

Contents

Introduction.

IOR Predictive (SYS 1.0) Software Basic Concepts.

Required Data.

How to Use the Software.

Analysis.

Results.

Introduction
EOR screening is the first step to do EOR project
implementation in he field.
Screening has two sides: Technical screening &
Commercial screening.

EOR phases are:


1.Selection of the best EOR method (Technical & Commercial).
2.EOR Pilot Design.
3.EOR Study.
4.EOR Full Field Implementation.

IOR Predictive Software _


Concepts
IOR Predictive SYS 1.0 software is an Improved Oil
Recovery Software for the Republic of China.
Through the use of this software, the user can
quickly screen oil fields and come up with a
decision on the suitable EOR method to be used.
It is a new EOR screening tools, simple and straight
forward software.
This software can do EOR prediction but it requires
a lot of laboratory data.

Required Data
The process to do EOR screening is to prepare the data,
QC it to be as an input to the software called EOR
screening criteria.
The required data is:
o
o
o
o
o
o
o
o
o

Reservoir Type
Reservoir Depth
Reservoir Pressure
Reservoir Temperature
Water Aquifer Strength
Clay Volume
Net Pay
Water Salinity
Reservoir Permeability, and others

Based on data provided, ranking of the EOR methods in


bar chart will be done by IOR Predictive Software.

How to Use the


Software
successfully use IOR

To
Predictive
SYS
1.0
Software
the
below
steps have to be done:
1- Open the software
from the start menu
(IOR Sys).

2-

Opening
of
the
software:
This step is loading all the
definition, contents and
modules of the software.

3- Opening of the main


page:
It consists of the Six main
part of the software:
o
o
o
o
o
o

Data Management.
IOR Screening
IOR Prediction
Standard Maintenance
Help
Exit

4- Open Data Management


(Project Manager):
o This step is to create new
project to be saved in the
data base (the software
contains many projects in
the data base, where
empirical data can be taken
and used in other projects
especially the lab data).
o Write the name of the
project and click on New in
the (In the New IOR-Sys
DB).

5- Connect the Project:


o This step is to connect
the created project to
the DB (Database) in the
software.
o Click on Connect (in the
Connecting
IOR-Sys
DB).
o After
this
step
the
software will restart.

6- Define the Project :


o This step is to define the
created project in the DB
(Database) in the software.
o Click
on
Data
Management (then on
Data Operation).
o Fill the required data
including,
Country,
Project,
Field,
Reservoir, Block & tick
on Eval

7- Define :
o This step is to connect
the created project to
the DB (Database) in the
software.
o Click on Connect (in the
Connecting
IOR-Sys
DB).
o After
this
step
the
software will restart.

7- Start the screening :


o Close the software and
open it again to start the
screening phase.
o Click on IOR Screening
(in the IOR Screening
part).
o Fill the required data.

Analysis

Results