ORESUND BRIDGE
The Oresund is an engineering marvel that connects the Danish
capital of Copenhagen to the Swedish city of Malm.
A cable-stayed bridge runs nearly 7.8 km to an artificial island
where it transitions into a tunnel that runs another 3.5 km. The
award-winning double-track railway and motorway opened on
July 1, 2000.
Malmo
Copenhage
n
16 kilometers
Sweden
Denmark
Oresund Strait
3,510 meter
1
4,055
meter
7,845 meters
Peberholm
The concept of a bridge over the Oresund was first formally proposed in
1936 by a consortium of engineering firms who proposed a national
motorway network for Denmark.
The idea was dropped during World War II but picked up again thereafter
and studied in significant detail in various Danish-Swedish government
commissions through the 1950s and 60s.
The governments of Denmark and Sweden eventually signed an agreement
to build a fixed link in 1973.However, that project was cancelled in 1978
due to the economic situation.
August 14, 1999: As the final bridge section is placed in position, the link
between Denmark and Sweden becomes a reality.
December 1, 1999: The final section of the railway between Copenhagen and
Malm is placed in position.
June 9 12, 2000: The resund Bridge opens to the public. Hundreds of
thousands of people cycle, run or walk across the link during the special Open
Bridge days.
Historic Milestone
July 1, 2000: Inauguration of the Oresund Bridge
July 1, 2016: The Oresund Bridge celebrates its Sixteenth
anniversary.
The bridge has reduced the total air pollution due to transport
by almost 50 percent, Prior to the project, ferries that produced
a large amount of air pollution Over US$ 300 million was
spent on environmental protection measures during
construction. In 1992 the Danish and Swedish authorities
concluded that all environmental requirements related to the
construction of the bridge had been fulfilled.
Malmo
Malmo
Copenhage
n
16 kilometers
Sweden
Denmark
Oresund Strait
Suspension
bridge
Deck
Main cable
Cables
arp system)
Various point
on the tower
Suspended lenght: 1
092 m
Longest span:
490 m
Longest span:
490 m
Suspended lenght: 1
092 m
Width: 23.5 m,
for 4 lanes of
traffic
Longest span:
490 m
Suspended lenght: 1
092 m
Width: 23.5 m
Pylon height:
203.5 m
Clearance
below: 57
m
vibrat
or
prob
e
concr
ete
pipe
driver
ski
p
trepan
frame
s
15 meters
20 meters
80 meters
9 500 N
30 meters
80 meters
Peberholm
10m
40m
8.6m
Built:
1993 - 2000
Structural Type:
Immersed
tube tunnel
Function / usage:
Railroad
tunnel
Road tunnel
3 510 m
20
55 000 T
660 000 m3
reinforcing steel
20 000 T
The precast reinforced concrete units were 8m high, 40m wide and 175m
long and they weighed 55,000 metric tons.
Precast reinforced
concrete units
The unit suspended over the dredged trench with the tugs holding
the unit in position, ready for lowering to the sea bed.