ENGINEERING MANAGEMENT
OBIAFU/OBRIKOM OBEN (OB3) GAS PIPELINE
PROJECT - (Lot A OB/OB CTMS to Umukwata IPS)
ENGINEERING MANAGEMENT -
INTRODUCTION
The Nigerian National Petroleum Corporation (NNPC), through its Gas Infrastructure
Division (GID) intends to construct a 48 x 127km, Class 600 trunk gas supply pipeline
from Obiafu/Obrikom (OB/OB) in Rivers State to Oben Node at Ijomi in Oghara in Delta
State with Gas Treatment and Pressure Reduction Facilities of 2Bscf/d capacity.
The Project is expected to be achieved through the award of Engineering, Procurement,
Construction and Commissioning (EPC) Contract of the gas pipeline and its associated
facilities which has been split into two lots namely; Lot A and Lot B.
The Nigerian National Petroleum Corporation (NNPC) has awarded the contract for
Engineering, Procurement and Construction of the Lot A scope (63km x 48) which starts
fromObiafu/Obrikom in Rivers State and terminates at Umukwata Intermediate Pigging
Station (IPS) in Delta State to Nestoil plc.
Nestoil plc has awarded the Engineering aspect of the Contract for the works to Frazimex
Engineering Limited.
Design life of the plant shall be a minimum of 20 years.
PROJECT DESCRIPTION - The project scope of works shall include:
Tie-in station at OB/OB Central Processing Facilities (CPF)
OB/OB Custody Transfer Metering Station.
CP System Groundbed.
63 km x 25m width ROW route of the gas pipeline from OB/OB CTMS to Umukwata
Intermediate Pigging Station.
Sub-surface Geological features of all river crossings and the river bed.
ENGINEERING MANAGEMENT -
PROJECT DESCRIPTION
The project scope of works shall include:
Tie-in station at OB/OB Central Processing Facilities (CPF)
OB/OB Custody Transfer Metering Station.
CP System Groundbed.
63 km x 25m width ROW route of the gas pipeline from OB/OB CTMS to Umukwata
Intermediate Pigging Station.
Sub-surface Geological features of all river crossings and the river bed.
River Crossing (3Nos including River Niger).
Complete Engineering including Process, Calculations, MTO,
Transportation to Nigeria, clearing through port and customs etc
Construction of all temporary and permanent installations, facilities, structures, pipelines etc
Preparation of Operating and Maintenance Manuals.
Provision of classroom and on-the-job training.
Provision of Spare Parts and consumables:
Testing, commissioning and start-up of the Works
Provision of process performance guarantee
Equipment By-pass Requirement / isolation/bypass facility in accordance with ASME VIII.
Document Review Cycle:This programme shall be submitted to the Owner within 15 days of issue of
the Letter of intent, and up-dated as required thereafter.
ENGINEERING MANAGEMENT -
ENGINEERING MANAGEMENT -
To IPS
FROM GAS INLET/ SLUG CATCHER /CTMS FILTER SEP. TO CTMS @ OB/OB & PIG LAUNCHER
ENGINEERING MANAGEMENT -
ENGINEERING MANAGEMENT -
ENGINEERING MANAGEMENT -
ENGINEERING MANAGEMENT -
ENGINEERING MANAGEMENT -