SURFACE WATER DRAINAGE:

BLOCK DRAIN
PRESENTED BY :
1. NOR HAZLINA BINTI TALIB
2. NURALIA BINTI ALI
3. SITI NUR ATIKAH BINTI MOHD YUSOF
4. ZATI IZYANI BINTI ABDUL HADI

WHAT IS SURFACE WATER DRAINAGE ?


Surface water drainage must be designed and
constructed in every building and hard surface
that existed with a building.
Surface drainage is the removal of water that
collects on the land surface for areas which
receive heavy amount of annual rain fall.
Surface water drainage will :
Ensure the disposal of surface water without
threatening the safety and health of the people
in or around the building.
Collect all the surface water and sends it
straight to the local streams, river, bays, and
oceans.
Keep certain areas of land free from excessive
water and acts as a flood control system

SURFACE WATER DRAIN

MAJOR ITEMS THAT RELATED TO


SURFACE WATER DRAINAGE
Overview of surface water channel constructions
Information on the ground and services on site that affecting excavation works.
Work beyond boundary of site.
Excavating trenches
Surface water drain
Cascaded drain
Excavating pit
Sump

OVERVIEW OF SURFACE
WATER DRAINAGE
CONSTRUCTIONS.

OVERVIEW OF SURFACE
WATER DRAINAGE
Heavy rainfall is the major reasons for
having a proper surface water drainage
system.
The system will redistribute the drainage of
rainwater around or near buildings and
directed straight to a public monsoon drain.
The drains in the system will prevent the

accumulation of water within a building and


can also prevent erosion.

SURFACE WATER DRAIN

Strut

Surface drain with cover

Surface drain showing side


walls and struts.

EXCAVATE
TRENCH

CLAUSE RELATED TO THE SWD: BLOCK


DRAIN
I. TRENCH EXCAVATION
TRENCH EXCAVATION
NORMAL
CURVED

E.O FOR ROCK


E.O EXCAVATION BELOW GROUND WATER LEVEL
DISPOSAL OF WATER
EXCAVATING TRENCHES NEXT TO ROADWAY, NEXT TO
EXISTING BUILDING & UNSTABLE GROUND

EXCAVATING TRENCHES
1. NORMAL

Foundation width <300mm wide SMM2, Clause V.2.4a & V.5


Foundation width >300mm wide SMM2, Clause D.12.7, clause
D.10, clause D.11
SW Channel

Excavn. depth
Foundation

Drain foundation width

EXCAVATING TRENCHES
1. NORMAL (CONTD)
By determine the foundation width <300mm wide - measured in linear
metre (SMM2 V.2.4a)
By stating the average depth to nearest 250mm (SMM2 V.2.4a).

By determine the foundation width >300mm wide - measured in cubic


metre (SMM2 V.2.4b)
In accordance with clause D.10, D.11 & D.12.7 (SMM2 V.2.4b).
For width (>300mm) stating the earthwork support, treating bottoms,
compaction, filling in, and disposal of surplus soil (SMM2 V.2.5).

EXCAVATING TRENCHES
2. CURVED
Based on clause D.12.3, by described the irrespective of
radius.

EXCAVATING TRENCHES
EXCAVATION BELOW GROUND WATER LEVEL
Based on clause V.2.6, it occurs and any adjustment to
earthwork support shall be deemed to be included.
Measured in linear metre.
Measured separately from normal excavation as extra over
the item in which it occurs.

EXCAVATING TRENCHES
ROADWAY, NEXT TO EXISTING BUILDING & UNSTABLE GROUND

Based on clause V.2.7, it should be so described.

EXCAVATING TRENCHES
EXCAVATING TRENCHES NEXT TO ROADWAY

Quantities measured in linear metre.


Item measured separately from normal excavation.

EXCAVATING TRENCHES
EXCAVATING TRENCHES NEXT EXISTING BUILDINGS

Quantities are measured in linear metre.


Items are measured separately from normal trench excavations.

EXCAVATING TRENCHES
EXCAVATING TRENCHES NEXT EXISTING BUILDINGS

Quantities measured in linear metre.


Measured separately from normal trench excavation items.

BLOCK DRAIN

BLOCK DRAIN
Carries surface water and waste water from a building
Located outside the boundary of building
Half round pipes can be used as an electrical cable cover
and useful for drain system

SURFACE WATER DRAINAGE :


TYPES OF BLOCK DRAIN

TYPICAL SURFACE WATER DRAIN BLOCK DRAIN

Top view of SWD with


side wall

Inside view of SWD

SURFACE WATER CHANNELS


PRECAST CONCRETE BLOCK DRAIN
Measure in linear metre (SMM V5.6)
State kind, quality, size, and method of jointing

SURFACE WATER CHANNELS


PRECAST CONCRETE HALF ROUND CHANNEL

SURFACE WATER CHANNELS


PRECAST CONCRETE U - DRAIN

CONSTRUCTION PROCESS FOR BLOCK DRAIN


Precast concrete
cover

Ground
level

Stru
t
Brickw
all

Concrete
bed

Lean
concrete

Half round
precast concrete
block drain

Brc / Fabric
reinforcemen
t

CASCADE DRAIN

CASCADED DRAIN
Based on Clause V.5.7
Measured in number as Extra Over the drain
previously measured.
State in the description:
Total number of steps in the cascade
Total height of the drops.

SUMP

SUMP
An infiltration basin that used to manage
surface runoff water and act as a trash track
A low space that collects any undesirable
liquids such as chemicals or water
Use to do an inspection and change the
direction flow of water

SUMP ITEMS TO BE MEASURED


Excavating pit
excavation
disposal
filling

Concrete base
concrete
formwork
reinforcement

Brickwall
Plastering to
wall
Cover

TYPICAL EXAMPLE OF SUMP

Brickwall Sump

TYPICAL EXAMPLE OF SUMP


(CONTD)

Precast concrete
sump

TYPICAL EXAMPLE OF SUMP WITH M.S


GRATING & FRAME

CONSTRUCTION PROCESS OF SUMP


Cover

Platform
Lev.

Concrete
Base

Fabric
Reinforcement

Plasterin
g

Brickwall

Block
drain

Lean
Concrete

EXCAVATE PIT TO RECEIVE PC SUMP


According to clause V.6.3, the excavation, brickwork, and other
work shall be measured in appropriate section or clause.
Excavation pit = clause D.12.6

SUMP
Refer clause V.6 in SMM2
Measured in detail under appropriate heading
Stating the number of sump in the project
Measured in detail under separate heading, stating the

number involved based on clause V.5.7


Measurement rules follow appropriate sections in the SMM.
Typical heading for sump:

The following in 5 nbrick sump

CASE STUDY
OF
SURFACE

WATER

DRAINAGE

CASE STUDY
PROJECT: CADANGAN MEMBINA DAN MENYIAPKAN SEBUAH
KOMPLEKS PEMBANGUNAN INSAN 2 TINGKAT DI ATAS LOT
P.T 51044, MUKIM PEKAN BARU SUNGAI BULOH, DAERAH
PETALING, SELANGOR DARUL EHSAN
CLIENT:
JANNAH

TETUAN YAYASAN ANAK-ANAK YATIM WARDATUL

SITE LOCATION

LAYOUT DRAWING

LAYOUT DRAWING (CONTD)

BLOCK DRAIN

TABLE OF CONTENT :
BLOCK DRAIN
1

TAKING OFF LIST

QUERY LIST

DETAIL DRAWING

COMPLETE BILING FOR BLOCK DRAIN

1.
2.
3.
4.

CLAUSE
SITE CAST
SCHEDULE
BILING FOR EACH ELEMENT

TAKING OFF LIST


Item

Descriptions

Unit

Excavate for trenches.

M3

Extra over for rock excavation

M3

Disposal of water

Lean concrete

M3

Concrete base

Formwork to conc. base

ITEM

TAKING OFF LIST (CONTD)


Item

Descriptions

Unit

Fabric reinforcement to conc. base

M2

Block drain

Brickwall for block drain

M2

10

Plastering to brickwall

M2

11

Graded filter

NO

12

Weep holes

NO

13

M.S grating for cover

14

Struts

M
NO

QUERY LIST
Item
1

Descriptions
Please confirm the platform level

Assumption

Remarks

68.50m

Yes

S9a

Yes

Please confirm the D5 is the


sump Type S9a

Please confirm the invert level of


S9a is similar to the size of S9

67.95m

Please confirm the length of


block drain from S9 S9a

4.00m

Please confirm the length of


block drain from S9a S8

6.50m

Yes

Yes

Yes

QUERY LIST (CONTD)


Item

Descriptions

Assumption

Remarks

Please confirm the the length of


block drain from S1 S3

15.00m

Yes

Please confirm the the the length


of block drain from S3 S3a

5.00m

Yes

Please confirm the invert level of


S3a is similar to the size of S3

67.93m

Yes

Please confirm the size of heavy


duty M.S grating for drain cover

710 x 600 x
50mm thick

Yes

10

Please confirm the size of strut

125mmx125m
m

Yes

11

Please confirm the allowance for


rock excavation

10%

Yes

LENGTH TO BE MEASURED

4.S9S9a
1.D8S11
2.S11S10

3.S10S9

5.S3S3a

EXCAVATING
TRENCHES

EXCAVATING TRENCHES
(M3)

SMM V2.4a & V5


Trenches <300mm width shall be given in M,
Stating the average depth to the nearest 0.25
SMM V2.4b
Trenches > 300mm width shall be given in
cubic metre (M3),
Stating the starting level accordance with sect.
D.10
Max. depth n.e 0.25m, n.e 1.00m, n.e 2.00m,

n.e 4.00m

Excavation = Length x Width x


Depth

LENGTH FOR EXCAVATION :


D8-S11
LENGTH =32.00M (HALF SUMP +
BRICK SUMP)
=32.00M (0.615+ 0.225)
ONE
32.00m
SIDE
=31.16M
0.615
m
0.225m

Length for Excavation D8 S11

D8 S11
1 nos
sump

EXCAVATION (contd)
Width for Excavation
580mm
225mm
225mm
Total=1030mm

EXCAVATION (contd)
Depth of Excavation
Total Depth : D8 S11
= Average Depth + Thick of Drain + Lean
Conc. +
Conc. Base
= 0.73m + 0.09m + 0.05m + 0.10m
= 0.97m
average depth = inlet
+ outlet
2

Not exceeding
1.00m

EXCAVATION (contd)
Average Depth:
Inlet
& Platform
Outlet =level
Platform
level

Inlet =
Invert
level
Invert
level
D8 S11
Inlet = 68.50m 67.80m
= 0.70m
Outlet = 68.50m 67.75m
= 0.75m
Total = 0.70 + 0.75
2
*

= 0.73m
IL 1
67.80m

IL 2
67.75m

PL 68.50m

EXCAVATION (contd)
TOTAL DEPTH OF EXCAVATION
Average
Depth

Thick of
Conc. Base
100mm

Thick of
Drain 90mm

* EXCAVATION TRENCH (M3)

D8 S11
=Length x Width x Depth
= 31.16m x 1.03m x 0.97m
= 31.13m3

SCHEDULE EXCAVATION TRENCH


(M3)
EXCAVATE
TRENCH
(M3)

DEPTH
L

LOCATION

W
AVE.
INLET OUTLET
DEPTH

D8 S11

TOTAL

31.1
1.03
6
0.70

THICK
NOT
LEAN CONC.
OF
TOTAL EXCEEDIN
CONC. BASE
DRAIN
G 1.00

0.75 0.73 0.09 0.05 0.10 0.97

31.13

31.13

Bills of Quantities for Excavation


Trenches (m3)
Item

Descriptions

Unit

Qty

m3

31

ELEMENT: SURFACE
WATER DRAINAGE
Excavating trenches to
A. receive surface water
drainage starting at
platform level maximum
depth not exceeding
1.00m.

Rate

Amount

EXCAVATION IN ROCK
SMM V.2.8

Excavation trenches in rock as define in


Clause D.12.2 shall be described.
SMM D.12.2

Alternatively rock be given as extra over


each of various types of exc. in m3.

Excavation in Rock (m3)


*Allow for 10% :
= % of E.O rock x excavation
=10% x 31.13m3
= 3.11m3

SCHEDULE EXCVATION
FOR ROCK
EXCAVATION TRENCH (M3)
NOT EXCEEDING 1.00

E.O IN ROCK
(M3)
10%

D8-S11

31.13

3.11

TOTAL

31.13

3.11

LOCATION

Bills of Quantities for Excavation in


Rock (m3)
Item

Descriptions

Unit

Qty

m3

ELEMENT: SURFACE
WATER DRAINAGE
A. Extra Over for rock in
excavation of trenches.

Rate

Amount

DISPOSAL OF SURFACE WATER


SMM V3
Measured in accordance with clause D15-16.
SMM D.15
An item shall be given for keeping the
surface of site and the exc. free of surface
water.
E.g.
Allow for keeping the excavation free from
storm and percolating water by pumping or
otherwise

Bills of Quantities for disposal of water.


(Item)
Item

Descriptions

Unit

ELEMENT: SURFACE
WATER DRAINAGE
A. Allow for keeping surface
of the site and the
excavation free from of
surface water.

Item

Qty

Rate

Amount

LEAN CONCRETE
SMM F.1.6

Poured against faces of exc. and beds laid


on earth or hardcore shall each be so
described
Unit in m3
SMM F.2.1

The thickness shall be as following


categories:

Not exceeding 100mm


100mm 150mm
150mm 300mm
Exceeding

300mm

Lean Concrete (m3)


D8 S11
=Length x Width x Depth
= 31.16mx1.03mx0.05m
= 1.60m3

1030mm

SCHEDULE OF LEAN CONCRETE


(M3)
LEAN
CONC.
(M3)

DEPTH
LOCATION

D8 S11

TOTAL

LENGTH WIDTH

31.1
1.03
6

INLET

OUTLET

AVE.
DEPTH

0.70

0.75

THICK
OF
DRAIN

LEAN
CONC.

CONC.
BASE

TOTAL

0.73 0.09 0.05 0.10 0.97

1.60

1.60

Bills of Quantities for Lean Concrete (m3)

Item

Descriptions

Unit

Qty

m3

ELEMENT: SURFACE
WATER DRAINAGE
A. 50mm thick of lean concrete
grade 15, to receive
concrete base and to be laid
on earth

Rate

Amount

CONCRETE BED
SMM V.4
Beds, benchings, and covering shall be
given separately in metres.
Stating nominal size of the pipe to be laid,
widths and thickness of bed, benching, and
the like.

Concrete Bed (m)


D8 S11
Length of concrete bed
= 31.16m

100mm
thick

1030mm

SCHEDULE OF
CONCRETE BED (M)

LOCATION

LENGTH

Same as length
excavation
trench

EXCAVAT
E
TRENCH
LEAN
CONCRETE BED
(M3)
WIDTH
CONCRETE
(M)
(M3)
NOT
EXCEEDIN
G 1.00

D8 - S11

31.16

1.03

31.13

1.60

31.16

TOTAL

31.36

Bills Of Quantities for Concrete Bed


(m)
Item

Descriptions

Unit

Qty

31

ELEMENT: SURFACE
WATER DRAINAGE
A. 1030mm x100mm
Thick reinforced in situ
concrete Grade 20 as
described bed under
430mm width precast
concrete block drain.

Rate

Amount

FORMWORK FOR CONCRETE BED


SMM F.11
Formwork to edges of beds not exceeding
1.00m high shall be given in metres (m)
Stating height following the catagories:
Not exceeding 250mm high
250 500mm
500 1000mm

Formwork for Concrete Bed


(m)
D8 S11
(L) of formwork = (L) of conc. Bed
x2
Both
= 31.16m x 2
side
=62.32m

SCHEDULE OF FWK CONCRETE


BED (M)

EXCAVATE
TRENCH
(M3)
LOCATION

LENGTH

WIDTH

LEAN
CONCRETE
(M3)

NOT
EXCEEDING
1.00

FWK 0F
CONCRETE
BED (M)

CONCRETE
BED (M)

D8 - S11 31.16 1.03

TOTAL

31.13

1.60

31.16

62.32

31.13

1.60

31.16

62.32

Bills of Quantities for Formwork of


Concrete Bed (m)
Item

Descriptions

Unit

Qty

62

ELEMENT: SURFACE
WATER DRAINAGE
A. Formwork to edges of
concrete bed as
described not
exceeding 250mm
high.

Rate

Amount

FABRIC REINFORCEMENT FOR


CONCRETE BED
SMM F.9.3
Shall be given in m2 stating the
mesh, the weight per square meter
and minimum extent of sides and
end laps.
Classification shall be accordance in
clause f.8.4

Fabric Reinforcement for Concrete


Bed (m2)
25m
m
=Length concrete bed Length
D8 S11

conc. cover For Both


Side
=31.16m (0.025X
2)m
= 31.11m

31.16m
Length of Conc.
Bed

BRC

25m
Length of m
Concrete Cover

Fabric Reinforcement for Concrete


Bed (m2) (contd)
Width concrete bed conc.cover
=1.03m (0.025x2)mFor Both
Side
=0.98m
BRC = Length x
Width

= 31.11m x 0.98m
=30.49m
1.03m

Width of Conc.

25mm
BRC
25m
Length ofm
Concrete Cover

SCHEDULE OF BRC CONCRETE


BED (M)
EXCAVATE
TRENCH
(M3)

LEAN
FWK 0F
CONCRETE
CONCRETE
CONCRETE
BASE (M)
(M3)
BED (M)

LOCATION LENGTH WIDTH


NOT
EXCEEDING
1.00

BRC
(M2)

D8 - S11 31.16 1.03

TOTAL

31.13

1.60

31.16

31.16

31.13

1.60

31.16

31.16

30.49

30.49

Bills of Quantities for BRC of


Concrete Base (m)
Item

Descriptions

Unit

Qty

30

ELEMENT: SURFACE
WATER DRAINAGE
A. Layer of steel fabric
reinforcement to BRC
A8 as described well
lapped at joints and
embedded in concrete
bed.

Rate

Amount

SURFACE WATER BLOCK DRAIN


SMM V.5.6
Measured shall be in metres (m)
Stating the kind, quality of drain, size
and method of jointing.

Block Drain (m)


D8 S11
Length of block drain :
Length of excavation + into brick wall
= 31.16m + 0.225m
=31.39m

Length of
block drain

SCHEDULE OF BLOCK
DRAIN (M)

EXCAVATE
TRENCH (M3)

DEPTH
LOCATION

LENGTH

TOTAL

BLOCK
DRAIN (M)

WIDTH

NOT EXCEEDING
1.00

D8 - S11

31.16

1.03

0.97

31.13

31.39

TOTAL

31.13

31.39

Bills of Quantities for Precast Block Drain


(m)
Item

Descriptions

Unit

Qty

31

ELEMENT: SURFACE
WATER DRAINAGE
A. 300mm Precast concrete block
drain Grade 20; laid to fall;
jointed and pointed in cement
and sand (1:3) mortar; bedded
on, in V-shaped drain.

Rate

Amount

BRICKWALL FOR BLOCK DRAIN


SMM G.3.1
Kind, quality and size of bricks shall be
described
Type of bond and composition and mix of
mortar need to be mention as well in
SMM G.3.3
Brickwork for walls shall be given in square
metre (m2).
Stating the wall thickness

Brick Wall (M2)


=Length x height x (2 for both side)
D8 S11
Length

Height

= L of
exc.

= IL (0.73) (0.3+0.15) =
0.28m
=31.16m
Total b/wall:

150m
m

=31.16m x 0.28 x 2(b/side)


IL =
0.73m

=17.45m2

31.16
m

300m
m

SCHEDULE OF BRICKWALL (M2)

LOCATION

D8 - S11 31.16 1.03

TOTAL

BRICKWALL

FWK 0F BLOCK
LENGTH WIDTH CONCRETE DRAIN
BASE (M)
(M)

AREA
B/SIDE
(M2)

LENGTH HEIGHT

31.16

31.39 31.16

31.16

31.39

0.28

17.45

17.45

Bills of Quantities for Brickwall Block


Drain (m2)
Item

Descriptions

Unit

Qty

m2

17

ELEMENT: SURFACE
WATER DRAINAGE
A. 225mm Thick brickwall
laid in common brick in
cement and sand (1:3)
mortar in English Bond

Rate

Amount

Plastering Wall (m2)

Same as
brickwall

Length x height x (2 for both side)


D8 S11
Length

Height

= L of
exc.

= IL (0.73) =
=31.16m x(0.3+0.15)
0.28 x 2(b/side)
= 31.16m
0.28m

=17.45m2

SCHEDULE OF PLASTERING TO
BRICKWALL (M2)

BRICKWALL

BLOCK
LOCATION LENGTH WIDTH DRAIN
(M)

Same as
brickwall

AREA
B/SIDE
(M2)

PLASTERING

AREA
(M2)

D8 31.1
1.03
S11 31.16
31.39 31.16 0.28 17.45 6 0.28 17.45

TOTAL

31.39

17.45

17.45

Bills of Quantities for Plastering to


Brickwall (m2)
Item

Descriptions

Unit

Qty

m2

17

ELEMENT: SURFACE
WATER DRAINAGE
A. 12mm Thick cement and
sand (1:3) mortar
trowelled smooth
internally for plastering to
wall.

Rate

Amount

Concrete Top (m3)

Concrete top = Length x Width x


Thickness
= 31.16m x 0.23m x 0.15m
=1.08m3

Lengt
h

150mm
thick

225mm
Width

Bills of Quantities for Concrete Top (m3)

Item

Descriptions

Unit

Qty

m3

ELEMENT: SURFACE
WATER DRAINAGE
A. 150mm Thick mass
concrete top (1:3) cement
mortar laid on brickwall

Rate

Amount

WEEP HOLE AND GRADED


FILTER
SMM V.5.5
Accessories need to be described and
enumerated stating the kind, quality
and size of the accessory and the
nominal size of each inlet and outlet
The number of weep hole and graded
filter should be the same as they
being construct together.

Weep Holes (No)


D8 S11
=(Length of block drain / 1500mm c/c)
+1
=(31.39 / 1.50m) + 1
=22 nos

Graded Filter (No)


Graded filter as assume as WEEP HOLES
for c/c

D8 S11
=(Length of block drain / 1500mm c/c) +
1
=(31.39 / 1.50m) + 1
=22 nos

SCHEDULE OF WEEP HOLE AND GRADED


FILTER (NO)

LOCATION

D8-S11

TOTAL

GRADED
FILTER
(NO)

WEEP HOLES
(NO)

22

22

22

22

Bills of Quantities for Weep Hole and


Graded Filter (No)
Item

Descriptions

Unit

Qty

A. Extra Over 50mm


Diameter weep holes build
to slope into brickwall at
1500mm centre to centre
No

22

ELEMENT: SURFACE
WATER DRAINAGE

Extra Over 50mm


Diameter graded filter
build to slope into
brickwall at 1500mm
centre to centre

No

22

Rate

Amount

COVERS
SMM V.4
Beds, benchings, and covering shall be
given separately in metres.
Stating nominal size of the pipe to be
laid, widths and thickness of bed,
benching, and the like.

Cover (m)
D8 S11
L cover = Internal to Internal pipe /
External to External sump.
=31.16m

SAME AS
LENGTH OF
EXCAVATION

SCHEDULE OF COVER OR GRATING


(NO)

BRICKWALL
BLOCK
LOCATION LENGTH WIDTH DRAIN
(M)

PLASTERING

AREA
B/SIDE
(M2)

STEEL
GRADED WHEEP
COVER
AREA FILTER HOLES
(M)
(M2)

D8 S11

31.16

TOTAL

1.03

31.1
31.1
17.1
31.39 6 0.28 17.14 6 0.28 4

31.39

17.14

17.1
4

22

22

31.16

31.36

Bills Of Quantities for Covers or Grating


(M)
Item

Descriptions

Unit

Qty

31

ELEMENT: SURFACE
WATER DRAINAGE
A. 710mm x 600mm x 50mm
Thick heavy duty mild
steel grating drain cover

Rate

Amount

R.C Struting
D8 S11
(Length of block drain / 2000mm c/c)
+1
(31.39 / 2.00m) + 1
=17 nos

SCHEDULE OF R.C STRUTING


(NO)

BRICKWALL
LOCATION

BLOCK
DRAIN
(M)

PLASTERING
GRADE
CONC.
WHEEP
STRUT
D
COVER
HOLES
(NO)
FILTER
(M)

AREA
B/SIDE
(M2)

AREA
(M2)

D8 - S11 31.16 1.03 31.39 31.16 0.28 17.14

TOTAL

31.1
17.1
0.28
6
4

22

22

31.16

17

31.39

17.14

17.1
4

31.36

17

Bills Of Quantities for Struts (No)


Item

Descriptions

Unit

Qty

no

17

ELEMENT: SURFACE
WATER DRAINAGE
A. 125mm x 125mm
reinforced concrete strut
at 2000mm center to
center.

Rate

Amount

FULL BILLING FOR


BLOCK DRAIN

ITEM

DESCRIPTION

UNIT

QTY

RATE AMOUNT
(RM)

SURFACE WATER DRAINAGE

Precast Concrete Block Drain

Excavating trenches to receive surface water


drainage starting at platform level maximum
depth not exceeding 1.00m.

Extra Over for rock in excavation of trenches.

M3

70

M3

Allow for keeping surface of the site and the


excavation free from of surface water.
Item

Removed excavated material on site in


permanents spoil heaps 1km from excavation.
M3

70

M3

50mm thick of lean concrete grade 15, to


receive concrete base and to be laid on earth

(RM)

ITEM

DESCRIPTIONS

UNIT

QTY

148

M2

33

M2

33

M3

SURFACE WATER DRAINAGE

Precast Concrete Block Drain

300mm Precast concrete block drain Grade 20; laid to


fall; jointed and pointed in cement and sand (1:3)
mortar; bedded on, in V-shaped drain.

225mm Thick brickwall laid in common brick in


cement and sand (1:3) mortar in English Bond

12mm Thick cement and sand (1:3) mortar trowelled


smooth internally for plastering to wall.

150mm Thick mass concrete top (1:3) cement mortar


laid on brickwall

RATE AMOUNT

SUMP

TABLE OF CONTENT : SUMP


1

DETAIL DRAWING

TAKING OFF LIST

QUERY LIST

COMPLETE BILING FOR SUMP

1.
2.
3.
4.

CLAUSE
SITE CAST
SCHEDULE
BILING FOR EACH ELEMENT

DETAILED DRAWING (SUMP)


SUMP

TAKING OFF LIST (SUMP)


ITEM

DESCRIPTION

UNIT

1.

Exc. Pit to receive sump

M3

2.

E.O in rock

M3

3.

Disposal of water

4.

Lean concrete

M3

5.

BRC

M2

6.

Concrete base

M3

ITEM

TAKING OFF LIST (CONTD)


ITEM

DESCRIPTION

UNIT

7.

Formwork of concrete base

M2

8.

Brick wall

M2

9.

Plastering

M2

10.

Cover

No

11.

Formwork to concrete top

12.

Concrete Top

M2

13.

Connection

No

14.

Testing

ITEM

QUERY LIST
ITEM

DESCRIPTION

ASSUMPTION

REMARK
S

1.

Please confirm the percentage of e.o in


rock

10%

YES

2.

Please confirm the internal size of brick


sump

1.23m

YES

3.

Please confirm the availability of BRC

Yes

YES

4.

Please confirm the size of Mild Steel 1350mmx1350


Grating cover
mmx
75mm

YES

5.

Please confirm the distance of the disposal


excavated material from the site.

1km

YES

6.

Please confirm the size of the concrete top


(in red circle)

225mm x
150mm

YES

LENGTH = WIDTH
B/W INTERNAL INTERNAL B/W
SUMP

Length of sump

= internal internal

sump +
2(width brickwall)
Eg. Length = 1.23m + 2(0.23m)
= 1.68m

DEPTH

Depth

= Depth of sump (PL-SIL) + Concrete Base + Lean

Concrete

Eg. Depth(S11) = 0.75m + 0.15m + 0.05m


= 0.95m3

EXCAVATION PIT (M3)


Based on clause V.6.3, the clause stated that
excavation work refer to clause D.12.6
Excavation work measured in M3

EXCAVATION PIT (M3) (CONTD)


LENGTH = WIDTH
1680

= Length x Width x Height of the

Eg. Exc. (S11) = 1.68m x 1.68m x 0.95m


= 2.68m3

HEIGHT

950

Excavation
sump

SCHEDULE OF SUMP FOR EXCAVATION


LENGTH
LOCATION INTERNAL
INTERNAL BRICKWALL TOTAL
SUMP

S11

TOTAL

1.23

0.45

EXCAVATE
PIT (M3)

DEPTH

1.68

WIDTH

1.68

PL-SIL

CONCRETE
BASE

LEAN
CONCRETE

TOTAL

NOT
EXCEEDING
2.00

0.75

0.15

0.05

0.95

2.68

2.68

BILL OF QUANTITIES FOR EXCAVATION


ITEM

DESCRIPTION

UNIT

QTY

RATE

AMOUNT

( RM )

( RM )

SURFACE WATER DRAINAGE

BRICK SUMP

The following in 1 no. of brick sump;


A

Excavate pit for sump starting from


platform level maximum depth not
exceeding 2.00m

M3

To collection:

EXTRA OVER EXCAVATION FOR


ROCK (M3)
Based on SMM2 clause D.12.2, excavation in rock shall be measured as
extra over for each of various type of excavation by making assumption in
percentage

Eg. (S11)

Assume 10%

= % of E.O rock x excavation (S11)

= 10% x 2.68 m3
= 0.27 m3
EXCAVATE PIT (M3)
LOCATION

E.O IN ROCK 10 %
(M3)

NOT EXCEEDING 2.00


S11

2.68

0.27

TOTAL

2.68

0.27

BILL OF QUANTITIES FOR EXTRA OVER


EXCAVATION FOR ROCK
ITEM

DESCRIPTION

UNIT

QTY

M3

RATE AMOUNT
( RM )
( RM )

SURFACE WATER DRAINAGE (CONTD)


BRICK SUMP (CONTD)
The following in 1 no. of brick sump;
A

Extra over for rock in pit excavation not


exceeding 2.00m deep for sump.

To collection:

DISPOSAL OF WATER (ITEM)


Define in SMM2 clause V.3, given in accordance with D.15-16
Based on clause D.15, the site of excavation should free from
the surface water and measured as item

EXCAVATE PIT (M3)


LOCATION

E.O IN ROCK (M3)

DISPOSAL OF
SURFACE WATER
(ITEM)

NOT EXCEEDING
2.00
S11

2.68

0.27

TOTAL

2.68

0.27

ITEM

BILLS OF QUANTITIES FOR DISPOSAL OF


WATER
ITEM

DESCRIPTION

UNIT

QTY

RATE
( RM )

SURFACE WATER DRAINAGE (CONTD)


BRICK SUMP (CONTD)
The following in 1 no. of sump;
A

Allow for keeping the surface of excavation


free from water

Item

To collection:

AMOUNT
( RM )

LEAN CONCRETE (M3)


Based SMM2 clause F.1.6, pored against faces of excavation and
beds laid on hardcore or earth must be described
Based SMM2 clause F.2.1, thickness shall be stated and
categorized by its thickness
Based on clause F.3.8, lean concrete shall be measured in M3 by
stating the thickness as clause F.2.1

LEAN CONCRETE (CONTD)

WIDTH

LENGTH

Eg. (S11)

= Length of pit exc. x Width x Thk. Lean concrete

= 1.68m x 1.68m x 0.05m


= 0.14 m3

SCHEDULE OF SUMP FOR LEAN CONCRETE

LENGTH
LOCATION

TOTAL

E.O IN
LEAN
ROCK CONCRETE
(M3)
(M3)

WIDTH
INTERNAL
INTERNAL BRICKWALL TOTAL
SUMP

S11

EXCAVATE
PIT (M3)

DEPTH

1.23

0.45

1.68

1.68

PL-SIL

CONCRETE
BASE

0.75

0.15

LEAN
TOTAL
CONCRETE

0.05

0.95

NOT
EXCEEDING
2.00

2.68

0.27

0.14

2.68

0.27

0.14

BILLS OF QUANTITIES FOR LEAN CONCRETE


ITEM

AMOUNT
DESCRIPTION

UNIT

QTY

RATE
( RM )

SURFACE WATER DRAINAGE (CONTD)


BRICK SUMP (CONTD)
The following in 1 no. of sump;
A

50mm thick of lean concrete grade 15 as


described blinding bed, spread and leveled
to receive concrete base and to be laid on
earth

M3

To collection:

( RM )

BRC/ FABRIC
REINFORCEMENT(M2)
SMM2 clause F.9.1, kind and quality of steel, section
bars making up the fabric (plan circular), test of fabric
and restriction on bending must be stated
Based on SMM2 clause F.9.2, fabric reinforcement shall
be measured in M2 by stating the mesh, weight/m2 and
the minimum extend of site and end laps
No allowances for void not exceeding 1.00 m

BRC/ FABRIC REINFORCEMENT(M2) (CONTD)


LENGTH

0.05M = CONCRETE COVER

WIDTH

1680

Eg. (S11) = (Length - 0.05 x Width - 0.05)


= (1.63m x 1.63m)
= 2.66m2

LENGTH

DEPTH

LOCATION

WIDTH
INT-INT
BRICKWALL TOTAL
SUMP

S11

TOTAL

1.23

0.45

1.68

BRC (M2)
PL-SIL

1.68

0.75

CONCRETE
LEAN
TOTAL
BASE
CONCRETE

0.15

0.05

0.95

2.82

2.82

BILLS OF QUANTITIES FOR FABRIC


REINFORCEMENT
ITEM

DESCRIPTION

UNIT

QTY

RATE

AMOUNT

( RM )

( RM )

SURFACE WATER DRAINAGE (CONTD)


BRICK SUMP (CONTD)
The following in 1 no. of sump;
Reinforcement
A

Layer of steel fabric reinforcement type BRC A8


to B.S 4483 as described well lapped at joints
and embedded in concrete bed

M2

To collection:

CONCRETE BASE (M3)


Based on clause F.3.8, the concrete base shall be measured
in M3 by stating the thickness, include thickening as clause
F.2.1
SMM2 clause F.2.1,thickness must be stated and categorized
by its thickness

CONCRETE BASE (CONTD)

WIDTH

LENGTH

Eg. (S11)

=Length of pit exc. x Width x Thk. Concrete Base

= 1.68m x 1.68m x 0.15m


= 0.42 m3

SCHEDULE FOR SUMP FOR CONCRETE BASE

LENGTH

DEPTH

LOCATION

WIDTH
INTERNAL
INTERNAL BRICKWALL TOTAL
SUMP

S11

TOTAL

CONCRETE
BASE
(M3)

1.23

0.45

1.68

1.68

PL-SIL

CONCRETE
BASE
(M)

LEAN
CONCRETE
(M)

TOTAL

0.75

0.15

0.05

0.95

0.42

0.42

BILLS OF QUANTITIES FOR CONCRETE BASE

ITEM

RATE AMOUNT
DESCRIPTION

UNIT

QTY
( RM )
( RM )

SURFACE WATER DRAINAGE


BRICK SUMP
The following in 1 no. of sump;
A

150mm thick reinforce concrete slab


Grade 20, thickness exceeding 150mm
but not exceeding 300mm thick as sump
bed.

M3

To collection:

FORMWORK TO CONCRETE BASE


(M)
SMM2 clause F.11.1 stated formwork must be to edges and faces of
foundations, classified into group depending on heights
Based on clause F.2.1 stated that the formwork shall be measured in M
due to high not exceeding 1.00m
225

225

Formwork= Length x 4
1230

1680

Eg. Fwk. (S11) = 1.68m x 4


= 6.72m2

SCHEDULE FOR SUMP FOR


FORMWORK TO CONCRETE BASE
LENGTH
LOC

S11

TOTAL

DEPTH

INTERNAL
INTERNAL BRICKWALL TOTAL
SUMP

1.23

0.45

1.68

WIDTH
PL-SIL

1.68

0.75

CONCRETE
LEAN
TOTAL
BASE
CONCRETE

0.15

0.05

0.95

FORMWORK
CONCRETE
OF
BASE (M3) CONCRETE
BASE (M)

0.42

6.72

6.72

BILLS OF QUANTITIES FOR FORMWORK TO


CONCRETE BASE
ITEM

AMOUNT
DESCRIPTION

UNIT

QTY

RATE
( RM )
( RM )

SURFACE WATER DRAINAGE


BRICK SUMP
The following in 1 no. of sump;
A

Formwork as described to sides of


concrete base not exceeding 250mm high

M2

To collection:

BRICKWALL (M2)
Based on clause G.2.1 stated that brickwork shall
be measured in M2 by timesing girth and height
SMM2 clause G.3.1(a), type of brick must be
stated
SMM2 clause G.3.1(b), type of bond for brickwall
must be described
SMM2 clause G.3.1(c), composition and mix of
mortar used for brickwall must be stated

BRICKWALL (M2) (CONTD)


225

Brickwall

1230
750

HEIGHT B/WALL

225

1460

= Girth x Height x 4

Eg. B/wall. (S11)


= 1.46m x 0.75m x 4
= 4.38m2

SCHEDULE FOR SUMP FOR BRICKWALL

BRICKWALL
LOCATION

S11

TOTAL

GIRTH

HEIGHT

AREA (M2)

1.46

0.75

4.38

4.38

BILLS OF QUANTITIES FOR BRICKWALL

ITEM

AMOUNT
DESCRIPTION

UNIT

QTY

RATE
( RM )
( RM )

SURFACE WATER DRAINAGE


BRICK SUMP
The following in 1 no. of sump;

225mm thick brickwall in common clay


bricks laid in English bond jointed and
pointed in cement and sand mortar (1:3)
as described per Engineer's detail drawing

M2

To collection:

PLASTERING (M2)
Based on SMM2 clause S.2.1

Type of material
Composition and mix
Method of application
Thickness
Nature of surface treatment
Special cunning of finished work

PLASTERING (M2) (CONTD)


225

225

750

Plastering

HEIGHT B/WALL

1230

= Length (internal to internal) x Height

Eg. Plastering. (S11) = 1.23m x 0.75m


= 0.93m2

SCHEDULE OF SUMP FOR PLASTERING

PLASTERING
LOCATION

S11

TOTAL

LENGTH
(internal to internal)

HEIGHT

AREA (M2)

1.23

0.75

3.69

3.69

BILLS OF QUANTITIES FOR PLASTERING


ITEM

DESCRIPTION

UNIT

QTY

M2

RATE AMOUNT
( RM )
( RM )

SURFACE WATER DRAINAGE


BRICK SUMP
The following in 1 no. of sump;
A

25mm thick cement and sand (1:3) mixed


with an approved plasticiser rendered as
plaster using street trowel on all exposed
surfaces to sides of sump wall

To collection:

COVER/ GRATING (NO)


Based on clause V.6.5, the cover shall be measured in
number by stating the type, quality, size and method of
fixing in the description

SCHEDULE OF SUMP FOR COVER

LENGTH
LOCATION

S11

TOTAL

DEPTH

INTERNAL
INTERNAL BRICKWALL TOTAL
SUMP

1.23

0.45

1.68

COVER
(NO)

WIDTH

1.68

PL-SIL

CONCRETE
BASE

LEAN
CONCRETE

TOTAL

0.75

0.15

0.05

0.95

BILLS OF QUANTITIES FOR COVER


ITEM

DESCRIPTION

UNIT

QTY

No

RATE
( RM )

SURFACE WATER DRAINAGE


BRICK SUMP
The following in 1 no. of sump;
A

Supply and install 1350mm x 1350mm x


75mm thick heavy duty mild steel grating
constructed of 45mm x 6m thick mild steel
plates as framing and filled with 45mm x
6mm thick mild steel plates at 50mm
center on all frame vertically and
horizontally and welded together as
describe

To collection:

AMOUNT
( RM )

CONCRETE TOP (M3)


Based on clause F.2.1, concrete top must include
thickening, and stating the thickness
The thickness shall be stated by its categories (SMM2
clause F.2.1) and measured in M3

CONCRETE TOP (M3) (CONTD)


WIDTH

225

225

150

1230

1450

Concrete Top

= 4 x (Length x Width x Depth)

Eg. Conc. top (S11)

= 4 x 1.45m x 0.23m x 0.15m

= 0.20m3

DEPTH

SCHEDULE OF SUMP FOR CONCRETE TOP

CONCRETE TOP
LOCATION

COVER
(NO)

CONNECTION
(NO)

S11

TOTAL

LENGTH

WIDTH

DEPTH

VOLUME (M3)

5.80

0.23

0.15

0.20

0.20

BILLS OF QUANTITIES FOR CONCRETE TOP

ITEM

DESCRIPTION

UNIT

QTY

RATE
( RM )

SURFACE WATER DRAINAGE


BRICK SUMP
The following in no. of sump;
A

225mm x 100mm thick reinforced concrete M3


Grade 20 as described filled into formwork
and well packed on top of brick sump wall

To collection:

AMOUNT
( RM )

FORMWORK TO CONCRETE
TOP (M)
Based on clause F.11.2 that refers to formwork to kickers for
concrete top shall be measured in M where the height is stated in
description
225

225

1230

Formwork

= Length x 4

1680
Eg. Fwk. (S11)
4
= 6.72m

= 1.68m x

SCHEDULE OF SUMP FOR


FORMWORK TO CONCRETE TOP

CONCRETE TOP
LOCATION

COVER
(NO)

FORMWORK
CONCRETE TOP
(M)

CONNECTION (NO)

S11

TOTAL

LENGTH

WIDTH

DEPTH

VOLUME
(M3)

5.84

0.23

0.15

0.20

11.68

11.68

BILLS OF QUANTITIES FOR


FORMWORK TO CONCRETE TOP
ITEM

AMOUNT
DESCRIPTION

UNIT

QTY

RATE
( RM )
( RM )

SURFACE WATER DRAINAGE


BRICK SUMP
The following in 1 no. of sump;
A

Sawn formwork as described to sides of


concrete top not exceeding 250mm high

M2

12

To collection:

CONNECTION (NO)
SMM2 clause V.7.1, stated that connecting ends of drain and others
which only be carried out by Local Authority shall be given as a
provisional sum
Based on SMM2 clause V.7.2, stated that the connection to the
existing work shall be measured in number and the size of pipe and
type of structure on connection must be described

SCHEDULE OF SUMP FOR CONNECTION

LOCATION

COVER (NO)

CONNECTION (NO)

S11

TOTAL

BILLS OF QUANTITIES FOR CONNECTION


ITEM

DESCRIPTION

UNIT

QTY

RATE

AMOUNT

( RM )

( RM )

SURFACE WATER DRAINAGE


BRICK SUMP
The following in 1 no. of sump;
A

Allow for connection to existing drain with


brickwall including all necessary work

No

To collection:

TESTING (ITEM)
Based on SMM2 clause V.8, testing the drainage
system shall be given as an item.
ITEM

DESCRIPTION

UNIT

QTY

RATE
( RM )

SURFACE WATER DRAINAGE

BRICK SUMP
The following in 1 no. of sump;
A

On completion, allow testing to all surface water


drainage for water tightness, make good any
defects and leave everything in perfect working
order to the entire satisfaction of the S.O

ITEM

To collection:

AMOUNT
( RM )

FULL BILLING FOR


SUMP

RATE
ITEM

DESCRIPTION

UNIT

QTY

( RM )

AMOUNT

ITEM

DESCRIPTION

UNIT

QTY

SURFACE WATER DRAINAGE (CONT'D)

( RM )

SURFACE WATER DRAINAGE

BRICK SUMP (CONT'D)


BRICK SUMP
The following in 8 nos. of brick sump;
The following in 8 nos. of brick sump;

Excavate pit for sump starting from


platform level maximum depth not
exceeding 2.00m

Extra over for rock in pit excavation not


exceeding 2.00m deep for sump

Allow for keeping the surface of


excavation free from water

Removed excavated materials to be


deposited on site in permanent spoil
heaps average distance 1km from
excavation to be reused

50mm thick of lean concrete grade 15 as


described blinding bed, spread and
leveled to receive concrete base and to
be laid on earth

M3

M3

M2

225mm thick brickwall in common clay


bricks laid in English bond jointed and
pointed in cement and sand mortar (1:3) as
described per Engineer's detail drawing

M2

25mm thick cement and sand (1:3) mixed


with an approved plasticiser rendered as
plaster using street trowel on all exposed
surfaces to sides of sump wall

Supply and install 1350mm x 1350mm x


75mm thick heavy duty mild steel grating
constructed of 45mm x 6m thick mild steel
plates as framing and filled with 45mm x
6mm thick mild steel plates at 50mm center
on all frame vertically and horizontally and
welded together as describe

NO

Allow for connection to existing drain with


brickwall including all necessary work

NO

18

225mm x 100mm thick reinforced concrete


Grade 20 as described filled into formwork
and well packed on top of brick sump wall

M3

Sawn formwork as described to sides of


concrete top not exceeding 250mm high

M2

93

17

ITEM

M3

M3

17

27

22

Reinforcement

RATE AMOUNT
( RM )
( RM )

THANK YOU