Sunteți pe pagina 1din 13

KBR STANDARD PROJECT

IPMS CHAINS
SAFETY
ENGINEERING
Note: Includes Process Safety, Fire Protection & Mechanical Integrity

Safety Engineering/

15 APR 2001

KBR STANDARD PROJECT


IPMS CHAINS
PROCESS SAFETY

Safety Engineering/

15 APR 2001

Chain E-KGEN: General Activities

DD-STP

CPM
CHAIN

100%

DD-CMP

General
Activity

DD-CMP

DD-STP
0%

IPMS
CHAIN

MILESTONES:
DD-STP
DD-CMP

100%

General
Activity

Start General Activity


Complete General Activity

GENERAL ACTIVITIES:
Prepare Process Safety Scope of Work
Review & Input PFDs
Review & Input P&IDs
Review Facility Plot Plan
Review Major Equipment Specifications
Review Electrical Area Classification Drawings
Review Hazardous Area Drawings
Participate in P&ID Review Meetings

Safety Engineering/

Work Package Sub Types:SE1


Document Sub Types: N/A

15 APR 2001

Chain D-KPHR: Process Safety Reviews:


DD-SSU

DD-CSU

DD-SCP

20%

DD-SSU

DD-CSU
20%

Set up
Review
Duration 10d

MILESTONES:
DD-SSU
DD-CSU
DD-SCP
DD-CCP
DD-SWP
DD-CWP
DD-STP
DD-CTP

DD-SCP

DD-CWP

DD-CTP

20%

40%

Conduct
Review
Duration 10d

40%

Write/Distribute
Report

DD-CCP

DD-SWP
40%

Track Action
Items & Report
Status

DD-CWP
60%

Write/Distribute
Report
Duration 10d
Work Package Sub Types: SE2

Start Set up Review


Complete Set up review
Start Conduct Review
Complete Conduct Review
Start Write & Distribute Report
Complete Write & Distribute Report
Start Track Action Items & Report Status
Complete Track Action Items & Report Status

DD-STP

20%

Conduct
Review

10%

IPMS
CHAIN

DD-SWP

20%

Set up
Review

CPM
CHAIN

DD-CCP

Document Sub Types: SE20

Safety Engineering/

DD-STP

DD-CTP

60%

100%

Track Action
Items & Report
Status
Duration 60d
This chain applies to:
Process Hazard Review
Design Hazard Review
Safety Integrity Level Determinations

15 APR 2001

Chain D-KDEL: Engineering Deliverable

100%

DD-STT

CPM
CHAIN

DD-ICM

Prepare & Issue Deliverable

DD-STT

DD-PRC

10%

IPMS
CHAIN

75%

DD-IST
75%

Prepare

Start Prep Deliverable


Complete Prep Deliverable
Finalize Deliverable
Deliverable Issue

100%

Finalize & Issue

Duration_15d_
MILESTONES:
DD-STT
DD-PRC
DD-IST
DD-ICM

DD-ICM

Duration_5d__
Work Package Sub Types: SE2, SE3
Document Sub Types: SE22, SE23, SE30

Safety Engineering/

15 APR 2001

KBR STANDARD PROJECT


IPMS CHAINS
FIRE PROTECTION
Safety Engineering/

15 APR 2001

Chain D-KFPD: Fire Protection Design & Drawing Chains


DD-STT

DD-CID

DD-SIC

80%

CPM
CHAIN

DD-TDC

DD-FDC

45%

5%

IPMS
CHAIN

Issue For
Construction

Internal & Client Review/ IFD

DD-STT

45%

Develop

IDC
Duration__20_
This chain applies to the following:
Electrical Area Classification Dwgs.
Fire Protection Equip. Location Plans
Safety Equip. Location Plans
Fire Detector Layout Dwgs.
Fire Detection Cause & Effect Matrix
Gas Detector Layout Dwgs.
Gas Detection Cause & Effect Matrix
Fire Hazardous Area Dwgs.
Escape Route Dwgs.
P&IDs IPL, IFD, IFC

MILESTONES
DD-STT
DD-TDC
DD-FDC
DD-CIA
DD-FCA
DD-CID
DD-SIC
DD-CIC

DD-CIC
20%

DD-CIA
60%

DD-FCA

DD-CID

60%

80%

Prepare
Client
Approval

Prep Issue
For Design

ICA

IFD

Duration__7_

Safety Engineering/

DD-CIC

80%

100%

Issue For
Construction

IFC

Duration_7__

Start Document
To Discipline Check
From Discipline Check
Issue For Client Approval
From Client Approval
Issue for Design
Start IFC Issue
Issue for Construction

DD-SIC

Duration_30_

Work Package Sub Types: SE6, SE7


Document Sub Types: SE60, SE61, SE62, SE63, SE64, SE65,
SE66, SE71, SE73

15 APR 2001

Chain D-KDEL: Engineering Deliverable

100%

DD-STT

CPM
CHAIN

DD-ICM

Prepare & Issue Deliverable

DD-STT

DD-PRC

10%

IPMS
CHAIN

This chain applies to the following:


Portable Fire Fighting Equip.
Safety Equip.
Breathing Air System
Clean Agent Extinguishing System
Foam Extinguishing System
Water Mist Extinguishing System
Water Spray System
Sprinkler System
Fire Detection and Alarm System
Gas/Toxic Detection Equip.
Fireproofing Material Criteria

75%

DD-IST

DD-ICM

75%

Prepare

100%

Finalize & Issue

Duration_15d_

Duration_5d__
Work Package Sub Types: SE8, SE9
Document Sub Types: SE81, SE82, SE83, SE84, SE85
SE86, SE87

Safety Engineering/

MILESTONES:
DD-STT
DD-PRC
DD-IST
DD-ICM

Start Prep Deliverable


Complete Prep Deliverable
Finalize Deliverable
Deliverable Issue

15 APR 2001

Chain P-TPK:
Procurement (Acquisition) Chain
Tags and Equipment

CPM
CHAIN

AW-INT
DD-STT
DD-RFQ

DD-RFQ

Issue
Eng.
Scope

FQ-ISS

FQ-ISS

Issue
Inquiry

10%

FQ-REC

Evaluate Bids /
Make
Recommendation

0%

30%

FQ-REC

AW-ISS

AWINT

Issue
Interim
Award
(NOC)

15%

0%

Transport
& Deliver

PP-REL
PP-DES

Assemble
& Issue
ERW
5d

(5-20d)

DD-RFQ
10%
RF-ISS
10%
Prep &
Issue
RFQW
2d

RF-ISS
10%
FQ-ISS
10%
Prep &
Issue
RFQ
2d

FQ-BID
FQ-ISS
10%
10%
FQ-BID
FQ-TEC
10%
40%
Supplier
Prep
Bids
20d

Technical
Evaluation
10d

(10-20d)

PP-PHY

Receive & Accept


Initial
Supplier Data
20%

Issue
Formal
Award

Fab &
Ship

DD-STT
0%
DD-RFQ
10%

AW-ISS

FQ-TEC
FQ-REC
AW40%
40%
INT
FQ-REC
AW-INT
DD-REQ
40%
40%
40%
55%
Issue
Issue
Eval Bids
Interim
ERW for
& Issue
Award
Purchase
Recomend
(NOC) 2d
10d
2d

(10-15d)

PP-DES
MM-RAS

DD-REQ
55%
RQ-ISS
55%
Issue
REQ for
Purch
7d

PP-REL
100%
PP-DES
100%

RQ-ISS
55%
AW-ISS
55%
Issue
Forma
l
Award7d

PP-DES
100%
MM-RAS
100%

MILESTONES:
DD-STT
Start Document
RQ-ISS
Req Issued to Purchase
DD-RFQ
Issue ERW, RFS, or MTO
AW-ISS
Award Issue External
RF-ISS
Issue RFQW
DD-ISC
Supplier Prep Initial Data
Transport
Fab &
FQ-ISS
RFQ (Inquiry) Issued
PP-PHY
Receive Initial Supplier Data
& Deliver
Ship
FQ-BID
Bids Return
DD-FSC
Supplier Prep Final Data
60d
10d
FQ-TEC
Engineering Tech Review Complete
PP-CRT
Receive Final Supplier Data
AW-INT
Issue Interim Award
PP-REL
Fab & Ship
FQ-REC
Recommend Issue
PP-DES
Materials Shipped
Work Package Sub Types: SE8
DD-REQ
Update Reqmts for Purchase
MM-RAS
Receipt At Jobsite
Document Sub Types: SE88
NOTES:
1. Percentages shown are for Engineering Progress Only.
2. Dotted boxes represent non-Engineering responsibilities only.
3. International projects may require Consolidation yard milestone.
4. Activity content & durations must be reviewed and modified to fit each projects requirements.

Safety Engineering/

Receive & Accept


Final
Supplier Data
25%
PP-PHY

PP-CRT
DD-ISC
55%
PP-PHY
75%

AW-ISS
55%
DD-ISC
55%
Supplier
Prep/
Submit
Initial Data

Review
Initial
Supplier
Data
10d

(10-60d) 30d

PP-PHY
75%
DD-FSC
75%

Supplier
Prep/
Submit
Final Data

(10-30d)

IPMS
CHAIN

20d

Review
Final
Supplier
Data 10d

15 APR 2001

DD-FSC
75%
PP-CRT
100%

Chains E-KGEN: Fire Protection Documents


& Input to Other Disciplines Specifications
DD-STP

100%

DD-CMP

Prepare
Document

CPM CHAIN

DD-CMP

DD-STP
0%

Prepare
Document

IPMS CHAIN

MILESTONES:
DD-STP
DD-CMP

100%

Work Package Sub Types: SE5, SE8


Start Prepare Document
Complete Prepare Document

Document Sub Types: SE55

Safety Engineering/

15 APR 2001

KBR STANDARD PROJECT


IPMS CHAINS
MECHANICAL
INTEGRITY
Safety Engineering/

15 APR 2001

Chains E-KGEN: Mechanical Integrity Prepare Documents

DD-STP

100%

DD-CMP

Prepare
Document

CPM CHAIN

DD-CMP

DD-STP
0%

Prepare
Document

IPMS CHAIN

MILESTONES:
DD-STP
DD-CMP

100%

Work Package Sub Types: SE4

Start Prepare Document


Complete Prepare Document

Document Sub Types: SE41, SE45, SE47

Safety Engineering/

15 APR 2001

Chain D-KDEL: Engineering Deliverable

100%

DD-STT

CPM
CHAIN

DD-ICM

Prepare & Issue Deliverable

DD-STT

DD-PRC

10%

IPMS
CHAIN

75%

DD-IST
75%

Prepare

Start Prep Deliverable


Complete Prep Deliverable
Finalize Deliverable
Deliverable Issue

100%

Finalize & Issue

Duration_15d_
MILESTONES:
DD-STT
DD-PRC
DD-IST
DD-ICM

DD-ICM

Duration_5d__
Work Package Sub Types: SE4
Document Sub Types: SE46

Safety Engineering/

This chain applies to the following:


Piping Integrity Location Drawings
Vessel Inspection Location Drawings
Tank Inspection Location Drawings

15 APR 2001