Documente Academic
Documente Profesional
Documente Cultură
WE19
(SONATA)
EMJIT
JITM
VL02N
Monitoring of PKN
Release PKN for Picking
Change PKN status (Status by
status forward )
Create Outbound Delivery
Additional
Sumitomo Wire Harness activities
in Mexico:
JIT1= Create JIT Call Numbers
Create Billings Document that affect
(PKNs
manually)
8 plantsLedger
for wire
harness production with more
than
18.500
Accounts.
JITE= Change PKN Status (Any
VF01
employees
status, Forward and
Backward)
Page 1
RESPONSIBLE AREA
TOPIC
ACTIVITY
RESPONSIBLE
TRANSACTIO
N
Engineering
MM03
BOM
Phantom components,
warehouses, supply areas.
Engineering
CS03
Routings
Engineering
CA03
Control
Cycles
Engineering
LPK4
Moving Price
Finance
Finance
MM03
Cost Collector
Finance
Finance
KKF6N
Cost Estimate
Finance
Finance
MF30 / CK13N
SA
Logistics
VA33
Stock
transfer
Logistics
PK13N
Engineering
JITL
Engineering
ZJIT_MATBIN
Mater Data
JITL
Modules
Order
Engineering
ZJIT_WCISTART
FTP
137.121.21.10
Released PKN
Logistics
JITM
Change PKN
status
Logistics
JITM
Delivery
Output
Logistics
JITM
Logistics
VL02N
Post Goods
Issue
Seite: 2
STATUS DESCRIPTION
STATU
S
DESCRIPTION
0000
1050
Error in Structure
1000
1100
1150
ACTION EXECUTED
In picking process
On going
(scanning
modules)
Picking finished
2000
2010
picking
and
process
picking
PKN
is
ready
for KSK
assembly in production line.
(carousel)
Clip request
has
successfully tested .
been
2020
Successful checking
Electric
3000
Production finished
KSK completed.
3900
Packing Finished
KSK packed.
4000
4100
4800
Delivery created
5000
Call finished
KSK Invoiced.
8000
Cancel
DESCRIPTION MOVEMENT
Mov.
Type
311
131
261
601
Descriptio
n
Transfer Posting
Storage
Location. to
Storage
Location
Goods Receipt
Goods Issue
Action
The quantity is
transferred from
unrestricted-use
stock of issuing
location (5000) to
unrestricted use in
the receiving
storage location
(5010)
This movement is
generated
automatically and
runs multiple
activities in a single
step, as the goods
receipt of the
finished product,
backflush of
component
materials,
accounting cost in
the collector and
the creation of
material and
accounting
documents.
Is done
automatically when
an order is
confirmed or when
a KSK is deliver to
finished goods
warehouses
In Shipping, this
movement is
created
automatically with
the Goods issue for
delivery function.
Time
Execution
PKN is changed
status from 1150 to
2000.
PKN is changed
status from 3900 to
4000.
PKN is changed
status from 3900 to
4000.
BACKFLUSH
When the PKN is in status 3900 and is changed to 4000 in this
moment the system execute the backflush in components of
the Father Module 1BE13*.
Material
WH
Supplyrea
Whit movement
131 the stock
enters to system,
and with
movement 601
stock leaving the
system.
5020
1BE13AB029S0E
MBE13AB029S0
E
5010
Production Line
5BE*
3000
3000_3M1
3BE*
3000
3000_3M1 / 3P2
9*
1000
ABE13AB029S0
E
5010
Phantom assembly
VTs
5010
Production Line
5BE*
5010
Production Line
3BE*
3000
3000_3P2
2BE*
3000
3000_3M1
1000 / 5010
5010
Phantom assembly
9*
BBE13AB029S0
Action
User Exit
executed
consumption.
Consumption is
made when the
production order
is confirmed.
Excluded all
components by
User Exit.
User Exit
executed
consumption
User Exit