GENERATION
UNIVERSIDADE FEDERAL DE
PERNAMBUCO
Renewables and the need of Flexible Power Plants
Wrtsil
This is Wrtsil
SERVICES
ENERGY SOLUTIONS
MARINE SOLUTIONS
Services network
Production facilities (fully owned)
Production facilities (joint ventures)
Our personnel
Strategy
Offering
LNG Solutions
Wrtsil
Wrtsila Energy Solutions - Unidade de Negcios GNL
Usina Termeltrica + Terminal de Regasificao de GNL
Wrtsil
BRAZIL INSTALLED BASIS
Wrtsil
Wrtsil Energy Solutions Gerao Solar Fotovoltaca
1# usina Solar FV da Wrtsil 46 MWp AES Jordania
INTERCONNECTING CABLES
Wrtsil
Wrtsil Energy Solutions Algumas referncias no Brasil
Wrtsil
Wrtsil Energy Solutions Algumas referncias no Brasil
Wrtsil
Wrtsil Engines for Flexible Power Production
10 MW 20 MW
Gas, Liquid, Dual-Fuel Gas, Liquid, Dual-Fuel
Wrtsil
INSERO DE NOVAS FONTES RENOVVEIS NO
PLANEJAMENTO ENERGTICO NACIONAL
The Role of Flexible Power Plants
6.00%
4.00%
2.00%
0.00%
-2.00%
2001 Rationing
2008 Financial Crisis Grid Demand Self-Generation Total (TWh)
Globally:
Demand for renewable energy continue to rise
2012: 1470 GW capacity
2011: 19% of final energy consumption
Wind power
2007: <100 GW
2012: 275 GW
Sources: GWEC,
Sources: statista.com/
++44
5533
G
2030
GW
2010
W
+7
26
G W
W
Solar PV; 6% Oher (Geothermal, CSP, Marine); 1%
Oher1%
Bioenergy; 1%Wind; 4%Solar PV; (Geothermal, CSP, Marine); 0% Wind; 11% Coal; 26%
5 183 GW
Nuclear; 8% Hydro; 18%
8 588 GW Oil; 3%
Oil; 8%
Gas; 26%
Nuclear; 6% Gas; 26% +8
83
GW
Source: Vestas
Load % Load %
100 100
90 90
80 80
70 70
60 60
50 50
40 40
30 30
20 20
10 10
0 0
0 5 10 15 20 25 30 35 40 45 50 55 mins
Wartsila unit efficiency exceeds 48%el @ ISO and part load efficiency also
extremely high when units can be started and stopped one by one
GT performances by GTPro
15 C, 10 bar NG
Demand %
100 Regulation
handle sudden starts and
stops as well as varying loads Peak load
80
allow for renewable integration
maximize the use of renewable 60 Intermediate load
capacity
40 Daily load curve
allow baseload plants that are
not designed for such cyclic
20
operation to be relieved of this
Base load
duty 0
contribute to grid frequency 0 6 12 18 Hour 24
Wind generation
Gas generation
40
35
FLEX
30 GEN 1 SOLAR
25
FLEX WIND
GW 20
GEN 2
15
10 COAL
NUCLEAR
0
Hour