Test #1 Annular, Manual choke & kill valve,

300psi 10 min , 3000psi 10 min


1.Drain BOP
2. Remove NRV from kill & emergency kill line
TDS
3.Install two stands HWDP+TP with open port + single DP + pup
joint (@ 10 fits) + connect top drive
- SINGLE JONT SOFT TORQUE ON TEST PLUG
4.Test pump connect to stand pipe manifold to record pressure
Kill line
5.Pump through top drive, pressure increased isolate rig pumps
6.Wing valve on wellhead to be open
Remote Choke

Manuel choke Poor boy Degasser

Shaker

Gut line, main pit

HCV
Flare line 1
Sensor valve
Emergency Kill line Flare Pit 2 or NPS

Remote Choke

Valve Open
6 x HWDP Emer. kill line
Valve Closed
Test # 2 Upper P/Ram, HCR choke & kill valves
300psi 10 min , 3000psi 10 min

TDS

Kill line

Remote Choke

Manuel choke Poor boy Degasser

Shaker

Gut line, main pit

HCV
Flare line 1
Sensor valve
Emergency kill line Flare Pit 2 or NPS

Remote Choke

Valve Open
6 x HWDP Emer. kill line
Valve Closed
Test # 3 Upper P/Ram, manual valve kill and & valve upper
emergency kill line, master valve on choke manifold
300psi 10 min , 3000psi 10 min

TDS

Kill line

Remote Choke

Manuel choke Poor boy Degasser

Shaker

Gut line, main pit

HCV
Flare line 1
Sensor valve
Emergency kill line Flare Pit 2 or NPS

Remote Choke

Valve Open
6 x HWDP Emer. kill line
Valve Closed
Test # 4 Upper P/Ram, kill & upper emergency kill line, choke
manifold valves 3,4,6 & sensor valve on choke manifold
300psi 10 min , 3000psi 10 min

TDS

Kill line

Remote Choke

Manuel choke Poor boy Degasser

Shaker

Gut line, main pit

HCV
Flare line 1

Sensor valve
Flare Pit 2 or NPS

Emergency kill line Remote Choke

Valve Open
6 x HWDP Emer. kill line
Valve Closed
Test # 5 Upper pipe rams, NRV kill & emergency kill, choke
manifold valves 2,5,7.
1.Install NRV on kill & upper emergency kill line
300psi 10 min , 3000psi 10 min
TDS

Kill line

Remote Choke

Manuel choke Poor boy Degasser


+ Shaker

Gut line, main pit

HCV
Flare line 1

Sensor valve
Flare Pit 2 or NPS
Emergency kill line
+
Remote Choke

Valve Open
6 x HWDP Emer. kill line
Valve Closed
Test # 6 Shear rams + 16, 11 (HCV) + 2 x remote chokes
1. Remove single + pup joint
2. Pump down kill line
3. Line up adjustable choke to blade off pressure
TDS

300psi 10 min , 3000psi 10 min

Kill line

Remote Choke

Manuel choke Poor boy Degasser


+ Shaker

Gut line, main pit


HCV
Flare line 1

Sensor valve
Flare Pit 2 or NPS
Emergency kill line
+
Remote Choke

Valve Open
6 x HWDP Emer. kill line
Valve Closed
Test # 7 Lower pipe rams, lower TDS IBOP, wing valves on
wellhead
1. Remove test plug
2. Install cup tester + blind X/O with port + single joint + pup
TDS joint + SES
3. Connect top drive
4. Pump down trough top drive, record pressure on SES
5. Pressure increased, close lower IBOP & blade off pressure
from stand pipe manifold
Kill line
300psi 10 min , 3000psi 10 min

Remote Choke

Manuel choke Poor boy Degasser


+ Shaker

Gut line, main pit


HCV
Flare line 1

Sensor valve
Flare Pit 2 or NPS
Test line
+
Remote Choke

Valve Open
6 x HWDP Emer. kill line
Valve Closed
Test # 8 Lower pipe rams, HCR lower emergency kill line,
upper TDS IBOP
1.Pump down trough top drive, record pressure SES
2.Pressure increased close upper TDS IBOP & blade off pressure
TDS from stand pipe manifold

300psi 10 min , 3000psi 10 min

Kill line

Remote Choke

Manuel choke Poor boy Degasser


+ Shaker

Gut line, main pit


HCV
Flare line 1

Sensor valve
Flare Pit 2 or NPS
Emergency kill line
+
Remote Choke

Valve Open
6 x HWDP Emer. kill line
Valve Closed
Test # 9 Lower emergency kill line

300psi 10 min , 3000psi 10 min

TDS

Kill line

Remote Choke

Manuel choke Poor boy Degasser


+ Shaker

Gut line, main pit

HCV
Flare pit 1

Sensor valve
Emergency kill line
+ Flare pit 2 or NPS

Remote Choke

Flare line 1

Valve Open
6 x HWDP Emer. kill line
Valve Closed