EHS Risk Management

EHS Risk Management


USER GUIDE

L&T Heavy Civil Infrastructure ICs ultimate goal is to achieve Zero Harm at all our
projects & operations globally so as to ensure that everyone goes home safely at the
end of every working shift.
EHS Risk Management
Purpose
L&Ts Risk management process is applied through the five steps to risk management and is
the key driver for risk control in business:
All relevant parties including construction & EHS teams must be involved in risk
assessments and the risk management process;
Risk assessments & Safe Work Method statement must be developed and approved prior
to any work activity starting;
All Identified risks and risk mitigation plans must be documented, approved and simply
communicated to all parties.
This user guide covers..
Key changes in the procedure
Risk Management Flowchart
Risk Assessment & Risk Reviews at various levels
5 Steps EHS Risk Management process
Action Plan
L&T Heavy Civil Infrastructure ICs ultimate goal is to achieve Zero Harm at all our
projects & operations globally so as to ensure that everyone goes home safely at the
end of every working shift.
EHS Risk Management
Key changes in the procedure

Revision 2: Changes in Organisation structure.


The 2015/16 EHS structure was BU driven with EHS BU heads, managing BU by BU.
This has now been changed and is to run on regional /cluster level. The EHS
structure has been developed to provide a robust management framework with
clear functional and administrative reporting lines in the 3 clusters.

L&T Heavy Civil Infrastructure ICs ultimate goal is to achieve Zero Harm at all our
projects & operations globally so as to ensure that everyone goes home safely at the
end of every working shift.
EHS Risk Management

Risk
Management
Flowchart
EHS Risk Management
Risk Assessment & Risk Reviews at various levels
S Corporate EHS Risk Project EHS Risk Activity EHS Risk
Activity
No Register Register Assessment
Who leads the EHS Cluster EHS Head or
1 IC EHS Head Engineer In charge
Risk review? Project EHS In charge
7 days before
30 days from launch of 30 days from start of
2 What is the timeline? commencement of
procedure project
work
What are the Incident statistics, Audit Corporate EHS Risk Project EHS Risk
3
references? results Register Register
Cluster EHS Head,
Who reviews the IC EHS Head & Cluster Engineer In charge &
4 Project Head &
implementation? EHS Head Project EHS Engineer
Project EHS In charge
Whenever any
How often the EHS
Monthly (as a part of significant changes in
5 Risk Register 6 months
EHS committee meet) work process, method,
reviewed?
resources.
L&T Heavy Civil Infrastructure ICs ultimate goal is to achieve Zero Harm at all our
projects & operations globally so as to ensure that everyone goes home safely at the
end of every working shift.
EHS Risk Management

5 Steps EHS Risk Management process

L&T Heavy Civil Infrastructure ICs ultimate goal is to achieve Zero Harm at all our
projects & operations globally so as to ensure that everyone goes home safely at the
end of every working shift.
EHS Risk Management
Evaluating Risk / Impact
Likelihood of occurrence (Probability)
Risk Matrix Probability Descriptions
(The highest category will always be used)
Severity (S) VALUE Status Description
1 2 3 4 The event is almost certain to occur and has occurred
4 Very Likely
1 1 2 3 4 repeatedly in the construction industry
Probability (P)

3 Likely The event will probably occur in most circumstances


2 2 4 6 8 2 Unlikely The event may occur only in exceptional circumstances
1 Very Unlikely Very unlikely but remotely possible
3 3 6 9 12

4 4 8 12 16 Severity
Severity Descriptions
(The highest category shall always be used)
Risk Assessment Format VALUE Result of Hazard to Personnel / Environmental impact
4 Fatality
Reportable Injury or illness resulting in more than 2 days off work / Permanent Total
3
Disability /Major Pollution
2 Non-Reportable Lost Time Injury or Illness resulting in less than 2 days off work
1 Injury or illness requiring First Aid treatment. Minor Pollution

L&T Heavy Civil Infrastructure ICs ultimate goal is to achieve Zero Harm at all our
projects & operations globally so as to ensure that everyone goes home safely at the
end of every working shift.
EHS Risk Management
Determining Controls
Risk Rating
Risk level Recommended actions
(P x S)

1 to 3 Low Risk No additional risk control measures may be needed.

4 to 8 Medium Risk Work can be carried out with Risk controls in place

9 to 16 High Risk Dont start work. Risk level must be reduced to Medium / low before commencing work.

L&T Heavy Civil Infrastructure ICs ultimate goal is to achieve Zero Harm at all our
projects & operations globally so as to ensure that everyone goes home safely at the
end of every working shift.
EHS Risk Management

Safe Work Method


Statement - Flowchart

Safe Work Method - Status clarification


ACC - Accepted (proceed with work)
AAN - Accepted As Noted (incorporate all
comments prior to proceeding with work)
RAR - Revise And Re-submit (rejected)
EHS Risk Management

Risk Management Register

The list of activities under each Engineer Incharge / Section Incharge shall be
detailed with like start and completion dates. The availability of EHS Risk
Assessment and approved Safe Work Method shall be updated on monthly basis.

The Project EHS Incharge maintains the Risk Management Register for whole
project and this will be overseen by Project Head.

L&T Heavy Civil Infrastructure ICs ultimate goal is to achieve Zero Harm at all our
projects & operations globally so as to ensure that everyone goes home safely at the
end of every working shift.
EHS Risk Management

Daily Pre-start verification and Briefing to workmen

The Engineer In charge shall complete the Daily Pre-start verification and Briefing
sheet before starting the work every day.

Pre-start verification ensures that the EHS risks involved in the days task are assessed
and site condition verified for compliance in line with the Risk Assessment and SWM.

Before starting the days work, the workforce shall be briefed about the nature of the
risks involved and the control measures implemented in line with the Risk Assessment
and Safe work method statement. Language of briefing shall be understandable to the
workforce.

L&T Heavy Civil Infrastructure ICs ultimate goal is to achieve Zero Harm at all our
projects & operations globally so as to ensure that everyone goes home safely at the
end of every working shift.
EHS Risk Management
Action Plan
Revision Superseding Implementation
Refresher Training combining L&T LIFE EHS Leadership
& EHS Risk Management shall be delivered to all key
project personnel.
EHS Risk Management
Review and Update the EHS Risk Management
Reference: IM 12 Supersedes existing procedures:
section in the Project EHS Plan.
Align the Project EHS Risk reviews with respective
- Partly superseding IM 08 (EHS
to Corporate EHS Risk Register
Revision:2 Risk Assessment and Operational
Project teams to Initiate project risk review of all
The BU EHS function is controls)
current activities and scheduling of specific risk
now fully removed and
workshops for final development of risk
EHS responsibility is - Fully superseding IM 12
assessment and method statements including
fully assigned to Cluster (Tool Box Talks)
briefing to the workforce, this will enable
function.
demonstration of implementation of safe work
methods.
Project EHS to initiate risk management audits to
measure implementation.

L&T Heavy Civil Infrastructure ICs ultimate goal is to achieve Zero Harm at all our
projects & operations globally so as to ensure that everyone goes home safely at the
end of every working shift.