Sunteți pe pagina 1din 60

REB500

Sub-System Intertripping
ABB Switzerland Ltd - 1


17-09-16
Consists of

Busbar Replica
Based on switchyard topology
Which CTs are located within one protection
zone. (BBP/EFP).
Which breakers do belong to one protection
zone (BFP,Intertrip).
Which Lines/Transformers cannot be switched
off due to Breaker bypass or 11/2 Breaker.

Triplogic
ABB Switzerland Ltd - 2

Generates trip commands


17-09-16
Busbar Replica

Slow Part (approx. each 128 ms):


General assignment of Protection Zones
according to isolator/breaker positions

Fast Part (approx. each 8 ms):


Merge Protection Zones in case Breaker
without CT between buszones is closing.
ABB Switzerland Ltd - 3


17-09-16
Triplogic

Generates Trip Commands (per zone)


for the following protection functions:
External Trip.
Busbar Protection (The Faulty Prot. Zone)
End Fault Protection (The Prot. Zone in
which the End-Fault is located.
Breaker Failure Protection (The Prot. Zone
in which the faulty Breaker is located).
ABB Switzerland Ltd - 4


17-09-16
Building up a Replica

Using the topological method:


Starting at a busbar, all electrical
connections are checked, and a
protection zone is build, whereby a
protection zone is demarcated by :
A Breaker/CT combination.
A Coupler Breaker.
A CT/Feeder combination.
A Feeder.
ABB Switzerland Ltd - 5

This procedure is repeated until all


busbars are assigned.

17-09-16
Building up a Replica

Topological elements:
Busbar
Isolators,Sectionalizers
Circuit Breaker
CT
Coupler_CT
Buscouplers,Tie-Breaker
Feeder
Junctions
ABB Switzerland Ltd - 6


17-09-16
Building up a replica

Busbar
I
II
Close
d
Isolat
or
CB Open
Isolat
CT Junction or
ABB Switzerland Ltd - 7

Feeder Coupler_CB Coupler_CT



17-09-16
Building up a replica

Topological rules (1):


Busbar:
Starting point of the protection zone assignment.
Isolators,Sectionalizers:
Open => End of a protection zone
CT (Feeder)
Combined with a CB, end of a protection zone
Circuit Breaker (Feeder)
Combined with a CT => End of a protection zone
Open => End of a protection zone
ABB Switzerland Ltd - 8


17-09-16
Building up a replica

Topological rules (2):


Coupler_CT
Combined with a Coupler_CB => End of a
protection zone
Buscouplers,Tie-Breaker
Combined with a Coupler_CT => End of a
protection zone
Feeder
End of a prot. zone, combined with CT without a CB
(e.g. Bypass)
ABB Switzerland Ltd - 9

Junctions
Ordinary connections.

17-09-16
Building up a replica

How to build up a replica using the


topological method.
Double busbar.
1 1/2 Breaker.
ABB Switzerland Ltd - 10


17-09-16
Building up a replica : Double Busbar

I
II
ABB Switzerland Ltd - 11

Start at a
busbar
17-09-16
Building up a replica : Double Busbar

I
II
ABB Switzerland Ltd - 12

Open Isolator,
end of prot. zone
17-09-16
Building up a replica : Double Busbar

I
II
ABB Switzerland Ltd - 13


17-09-16
Building up a replica : Double Busbar

I
II
ABB Switzerland Ltd - 14

Open Isolator,
end of prot zone

17-09-16
Building up a replica : Double Busbar

I
II
ABB Switzerland Ltd - 15


17-09-16
Building up a replica : Double Busbar

I
II
ABB Switzerland Ltd - 16

Closed Isolator,
continue

17-09-16
Building up a replica : Double Busbar

I
II
ABB Switzerland Ltd - 17

Open Isolator,
end of prot. zone

17-09-16
Building up a replica : Double Busbar

I
II
ABB Switzerland Ltd - 18


17-09-16
Building up a replica : Double Busbar

I
II
ABB Switzerland Ltd - 19

Coupler Breaker,
end of prot. zone

17-09-16
Building up a replica : Double Busbar

I
II
ABB Switzerland Ltd - 20


17-09-16
Building up a replica : Double Busbar

I
II
ABB Switzerland Ltd - 21

Open Isolator
end of protection zone
17-09-16
Building up a replica : Double Busbar

I
II
ABB Switzerland Ltd - 22

Breaker / CT arrangement
return

17-09-16
Building up a replica : Double Busbar

I
II
ABB Switzerland Ltd - 23

Repeat procedure for


the next busbar

17-09-16
Building up a replica : Double Busbar

I
II
ABB Switzerland Ltd - 24

Breaker / CT arrangement
end of prot. zone
17-09-16
Building up a replica : Double Busbar

I
II
ABB Switzerland Ltd - 25

Coupler Breaker,
assigned 2nd time

17-09-16
Building up a replica : Double Busbar

I
II
ABB Switzerland Ltd - 26

Assign according CT

17-09-16
Building up a replica : Double Busbar

I
II
ABB Switzerland Ltd - 27


17-09-16
Building up a replica : Double Busbar

I
II
ABB Switzerland Ltd - 28

Open Isolator, end of prot zone



17-09-16
Building up a replica : Double Busbar

I
II
ABB Switzerland Ltd - 29


17-09-16
Building up a replica : Double Busbar

I
II
ABB Switzerland Ltd - 30

Open Isolator, end of prot zone



17-09-16
Building up a replica : Double Busbar

I
II

All busbars have been


ABB Switzerland Ltd - 31

assigned ,
replica is updated/ready

17-09-16
Building up a replica : 1 1/2 Breaker

I
II
ABB Switzerland Ltd - 32

Start at a busbar


17-09-16
Building up a replica : 1 1/2 Breaker

I
II
ABB Switzerland Ltd - 33

Coupler Breaker,
end of prot. zone

17-09-16
Building up a replica : 1 1/2 Breaker

I
II
ABB Switzerland Ltd - 34


17-09-16
Building up a replica : 1 1/2 Breaker

I
II
ABB Switzerland Ltd - 35

Coupler Breaker,
end of prot. zone

17-09-16
Building up a replica : 1 1/2 Breaker

I
II
ABB Switzerland Ltd - 36

Repeat procedure for the next busbar


17-09-16
Building up a replica : 1 1/2 Breaker

I
II
ABB Switzerland Ltd - 37

Coupler Breaker,
end of prot. zone

17-09-16
Building up a replica : 1 1/2 Breaker

I
II
ABB Switzerland Ltd - 38


17-09-16
Building up a replica : 1 1/2 Breaker

I
II
ABB Switzerland Ltd - 39

Coupler Breaker,
end of prot. zone

17-09-16
Building up a replica : 1 1/2 Breaker

I
II
ABB Switzerland Ltd - 40


17-09-16
Building up a replica : 1 1/2 Breaker

I
II
ABB Switzerland Ltd - 41

Repeat procedure for the next busbar


17-09-16
Building up a replica : 1 1/2 Breaker

I
II
ABB Switzerland Ltd - 42

Coupler Breaker,
end of prot. zone

17-09-16
Building up a replica : 1 1/2 Breaker

I
II
ABB Switzerland Ltd - 43

Coupler Breaker,
assigned 2nd time

17-09-16
Building up a replica : 1 1/2 Breaker

I
II
ABB Switzerland Ltd - 44

Assign according CT


17-09-16
Building up a replica : 1 1/2 Breaker

I
II
ABB Switzerland Ltd - 45

Open Isolator,
end of protection zone

17-09-16
Building up a replica : 1 1/2 Breaker

I
II
ABB Switzerland Ltd - 46

repeat procedure
for the next busbar
17-09-16
Building up a replica : 1 1/2 Breaker

I
II
ABB Switzerland Ltd - 47

Coupler Breaker,
assigned 2nd time

17-09-16
Building up a replica : 1 1/2 Breaker

I
II
ABB Switzerland Ltd - 48

Assign according CT

17-09-16
Building up a replica : 1 1/2 Breaker

I
II
ABB Switzerland Ltd - 49

Coupler Breaker,
assigned 2nd time

17-09-16
Building up a replica : 1 1/2 Breaker

I
II
ABB Switzerland Ltd - 50

Assign according CT

17-09-16
Building up a replica : 1 1/2 Breaker

I
II
ABB Switzerland Ltd - 51

Feeder Node,
end of protection zone

17-09-16
Building up a replica : 1 1/2 Breaker

I
II
ABB Switzerland Ltd - 52

repeat, next 2 busbars



17-09-16
What is found in the replica

After building up the replica following


information is available for the different
functions:
Which CB is in which protection zone
Which CT is in which protection zone
Which Feeder is located in which protection
zone
ABB Switzerland Ltd - 53


17-09-16
Dependencies

Wich functions use the information found


in the ITT.
Busbar Protection.
Breaker Failure Protection.
End-Fault.
External Protection.
Transfer Trip
Overview
ABB Switzerland Ltd - 54


17-09-16
Dependencies

Busbar Protection:
Gets information which CT measurements are
located in one protection zone and should be
evaluated for the BBP algorithm.
Indicates which protection zone should trip due
to a busbar fault.
ABB Switzerland Ltd - 55


17-09-16
Dependencies

Breaker Failure:
After a breaker has the trip failed executing
command, the BFP will initiate an intertrip to the
associated protection zone.
A trip command initiated by the intertrip will
start the BFP function.
End-Fault:
A fault between an open Breaker and a CT
initiates an intertrip to the associated protection
zone.
ABB Switzerland Ltd - 56


17-09-16
Dependencies

External Protection:
Ext Tripping per Busbar (CU)
Ext. Tripping per Feeder (BU)

Transfer trip :
Due to a bypass of a CB
Feeder without a CB
ABB Switzerland Ltd - 57


17-09-16
Dependencies ITT/Replica Overview

CU Trip
ITT BBP
EXT

BU
BFP Trip
EFP BBP
ABB Switzerland Ltd - 58

EXT OCP


17-09-16
Intertripping (ITT)

Trip_Prot_Zone BBP
Prot_Zone_Of_CT
ITT BFP_Intert BFP
rip
EFP_Intertrip
EFP

Transfer_Trip Ext_Trip_BU ITT_Trip_B


U
Ext_Trip_Buszone Ext_Trip_Buszone
Trip_Buszo Trip_BU
ne Ext_Release_Busz Switch_Positions
ABB Switzerland Ltd - 59

one
EXT_CU
EXT_BU

17-09-16
ABB Switzerland Ltd - 60
17-09-16
REB500

The End !

S-ar putea să vă placă și