Sunteți pe pagina 1din 12

STUDENT NAME : MUHAMMAD AZAMUDDIN ZAMRI

SUPERVISOR : PUAN NUR FAEZAH BINTI FAUZI


VISITING LECTURER : PUAN NORHASNELLY ANUAR
ESTABLISHED ON 1 JUNE 1999 WITH THE NAME OF
PASUKAN PROJEK KERAJAAN (PPK).

DIVIDED INTO FEW DEPARTMENT WHICH ARE :


i. CORPORATE ZONE
ii. SENGGARA ZONE 1
iii. SENGGARA ZONE 2
iv. SENGGARA ZONE 3 - (MY OFFICE DEPARTMENT)
v. SENGGARA QUARTERS
A WORLD CLASS SERVICE PROVIDERS AND CENTERS OF
EXCELLENCE IN THE FIELD OF ASSETS MANAGEMENT,
PROJECT MANAGEMENT AND ENGINEERING FOR THE
DEVELOPMENT OF HUMAN CAPITAL BASED ON THE
COUNTRY INFRASTRUCTURES THAT ARE INNOVATIVE
AND LATEST TECHNOLOGY.
JURUTERA ELEKTRIK
PENGUASA KANAN J55
Ir. SHAMSUREE B. SULAIMAN
SETIAUSAHA PEJABAT N29
ADILAH BT AZMI

JURUTERA ELEKTRIK JURUTERA MEKANIKAL JURUTERA AWAM KANAN JURUTERA AWAM KANAN
PENGUASA J52 PENGUASA J52 J48 J48
HASSIM B IDIN Ir. MASLINDA BT MOHAMED YUSNIZA BINTI MOHD ANWAR IBRAHIM B
KUSNIN THOLPAKAR

JURUTERA ELEKTRIK J41 JURUTERA ELEKTRIK J41 JURUTERA ELEKTRIK J41 JURUTERA BANGUNAN
NOREHAN BT SAID NOREHAN BT SAID NUR FAEZAH BT FAUZI J44
NOOR AZIZI B ARIFFIN

PEN. JURUTERA ELEKTRIK


JURUTERA AWAM J44
JA29
NOOR SHAMIZA BT OTHMAN PEN. JURUTERA MEKANIKAL
SUJENI B SULAIMAN PEN. JURUTERA MEKANIKAL
JA29 JA29
MOHD AZLAN B MOHD AKHIR SOPHIAN B ABDUL MAJID

PEN. JURUTERA AWAM


JA36
JURUTERA ELEKTRIK J41
ROSMAINA BT SALLEH
NUR FAEZAH BT FAUZI
PEN. JURUTERA MEKANIKAL
JA29 PEN. JURUTERA ELEKTRIK
SAIFUL HAZRI B HARUDDIN JA29
PEN. JURUTERA ELEKTRIK PEN. JURUTERA ASMAHANI BT IBRAHIM
JA29 MEKANIKAL JA29
ASMAHANI BT IBRAHIM NOOR SHAHRAZAL B
MUHAMAD

PEN. JURUTERA ELEKTRIK


JA29
SUJENI B SULAIMAN
MAINTENANCE AND MANAGING THE GOVERNMENT
BUILDINGS FACILITIES AND RESIDENTIAL QUARTER
HOUSES.

APPOINTED A QUALIFIED CONTRACTOR TO CARRY


OUT THE MAINTEINANCE WORK.

MONITOR AND SUPERVISED THE MAINTENANCE


WORK PERFORMED BY CONTRACTOR TO ENSURE
THE PHYSICAL CONDITION OF ASSET IS RESTORED
BACK TO ITS ORIGINAL CONDITION.
THE PUMP IS POWERED BY ELECTRIC,
DIESEL OR STEAM.

PUMP INTAKE IS FROM STATIC WATER


SOURCE WHICH IS TANK.

FUNCTION : PROTECTION TO FIRE.


FIRE SPRINKLER SYSTEM
A CABLE TRANSPORT AND AERIAL
LIFT SUPPORTED BY CABLES.

CONSISTS OF LOOP STEEL CABLE


HANG UP BOTH SIDE OF GONDOLA.

FUNCTION : TO LIFT PEOPLE AT HIGH


GONDOLA SYSTEM LEVEL OUTSIDE OF THE BUILDING.
Condition Audit is an inspection on mechanical system, civil
system and electrical system of the building.
UPS OR UNINTERRUPTIBLE POWER
SUPPLY IS A DEVICE THAT PROVIDES
EMERGENCY POWER TO A LOAD
WHEN MAINS POWER FAILS.

PROTECT DATA CENTER AND COMPUTERS BY SUPPLYING


POWER CONTINUOUSLY TO IT WHEN THERE IS POWER
LOSS BEFORE GENERATOR ARE STARTED.
A PRESENTATION BY THE OFFICER FROM NONSTOPOWER
SDN.BHD. ABOUT THEIR PRODUCT (UPS SYSTEM) SUCH AS THE
BATTERY CAPACITY AND POTENTIAL . EXAMPLE : A BATTERY CAN
SUPPLY 240 DC VOLTAGE AND USED A 20 % OF POWER SYSTEM
WHEN CHARGING.

THE PURPOSE OF THE SITE VISIT IS TO CHECK THE QUALITY OF UPS


SYSTEM MADE BY THE NONSTOPOWER AND BUY IT.

S-ar putea să vă placă și