Documente Academic
Documente Profesional
Documente Cultură
Rinse off filter cake from the filter layers and filter plates in
13 the suspension tank.
Volume of Filtrate (L) Time (s)
Volume of Filtrate (L) Time (s)
0 0
28 47.52
2 22.30
30 56.50
4 22.71
32 62.28
6 19.89
8 19.13 34 109.97
10 19.48 36 115.42
12 20.36 38 139.61
14 20.44 40 167.87
16 24.49 42 218.02
20 36.75 44 337.38
22 36.22 46 398.88
24 36.49
48 516.38
26 43.83
Volume of Filtrate (L) Time (s)
Volume of Filtrate (L) Time (s)
0 0
28 47.52
2 22.30
30 56.50
4 22.71
32 62.28
6 19.89
8 19.13 34 109.97
10 19.48 36 115.42
12 20.36 38 139.61
14 20.44 40 167.87
16 24.49 42 218.02
20 36.75 44 337.38
22 36.22 46 398.88
24 36.49
48 516.38
26 43.83
0.6
0.5
0.4
dV/dt
0.3
0.2
0.1
0
0 100 200 300 400 500 600
Time (s)
Coronado, Raniella Bianca Y.
Reyes, Noelle Ivonette Z.
Zapata, Rosette Anne Lea T.
GAS ABSORPTION - a gas mixture consisting mainly of
an inert gas and a soluble gas is made in contact with a liquid
acting as a solvent to separate the gas mixture.
Determined the void fractions of the packed beds,
the effects of liquid holdups on the pressure drop of
the column
Clean the sump tank and fill with water (75% of its
2 capacity)
Make sure that the on-off switch knobs were turned off,
the flow meter and drainage valves were closed and, the
3 return line valve and pressure taps were fully opened
9
Reset gas rate to 60 L/min
10
Open liquid control valve
11
Observe gas flow in packed beds
12
Measure pressure drop (mmH2O)
Turn off pump
13