AIR IS ONE OF THE IMPORTANT THINGS IN FACTORY PROCESS OR INDUSTRY. AIR CAN USUALLY
BE USED FOR CHEMICAL REACTION PROCESS. IN THIS FACTORY, AIR NEEDED FOR THE
CHEMICAL REACTION PROCESS IS:
2 Electric Smelting
THIS UNIT OVERSEES SUPPLYING AND TREATING WATER TO MEET WATER REQUIREMENTS
AS FOLLOWS:
2. TERMS OF CHEMISTRY; DOES NOT CONTAIN ORGANIC AND INORGANIC SUBSTANCES THAT
DISSOLVED IN WATER, OTHER HEAVY METALS THAT ARE TOXIC.
b. Air Conditioning
The water required for the processes exchange/heat transfer in a heat exchanger with a purpose to transfer heat of a
substance in a stream into the water. Things that should be considered in the provision of cooling water are:
Water hardness that can cause scale (crust) in piping systems.
Microorganisms, such as bacteria, plankton lives in water rivers, develop and grow, causing fouling means of heat
exchangers.
Iron, which can corrode.
Oil, which is the cause of the disruption of the film corrosion.
Inhibitor, lowers the heat transfer coefficient, can be food microbes causing sediment.
STANDARD QUALITY OF COOLING TOWER IS :
O CA HARDNESS AS CACO3 : < 150 PPM
O MG HARDNESS AS MGCO3 : < 100 PPM
O SILICA AS SIO2 : < 200 PPM
O TURBIDITY : < 10
O CL- AND SO42- : < 1000 PPM
O PH :68
O CA2+ : MAX 300 PPM
O SILICA : MAX 150 PPM
O TDS : MAX 2500 PPM
EQUIPMENT WHICH USES COOLING WATER CAN BE SEEN ON THE FOLLOWING TABLE
THE COOLING WATER COMING OUT OF THE HEAT TRANSFER MEDIA IN THE AREA THE PROCESS WILL BE
CIRCULATED AND COOLED AGAIN ENTIRELY IN IN THE COOLING TOWER. EVAPORATION AND WATER
LEAKAGE WILL OCCUR IN IN THIS COOLING TOWER. THEREFORE, TO KEEP THE AMOUNT OF WATER
COOLING WATER MUST BE ADDED THAT THE AMOUNT OF MAKEUP IN ACCORDANCE WITH THE AMOUNT
OF WATER LOST. THEN THE MAKEUP WATER FOR COOLING TOWERS AMOUNTING TO 207.22 M3/HOUR.
COMPRESSED AIR WILL BE NEEDED FOR THE PROCESS AND FOR GENERAL USE. COMPRESSED AIR IS
USED IN THE ELECTRIC ARC FURNACE. ELECTRICAL ARC FURNACE HAS HIGH PRESSURE ABOUT 1.4 MPA
IN 0.021 M3/MIN.
4. ELECTRICAL NEEDED
COMPLIANCE OF ELECTRICAL NEEDED IN PT. IPDS RAILROAD ARE HELPED BY OUR POWER PLANT THAT
IS BUILT, AND PLN AS A BACKUP DEVICE FOR AVOIDING DISTRACTIONS THAT MAY OCCUR IN OUR POWER
PLANT.
4.1 PROCESSING UNIT
CHEMICAL ENGINEERS HANDBOOK. 3RD ED, IS RECOMMENDED FOR LIGHTING CALCULATION WITH LUMEN UNIT.
BY DETERMINING THE LAMP TYPE WILL BE USED, WE CAN CALCULATE TOTAL ELECTRICAL BEING PREPARED
FOR LIGHTING. THE FORMULA IS:
L : LUMEN PER OUTLET
A : AREA, FT2
596434.85
= 305
1960
= 40 305 = 12200 = .
Area Non-
No. Area (m2) Area (ft2) F U Lumen
Buildings
GIVEN: L = 250 M
W = 30 TONS/HOUR
BELT WIDTH = 20
ASSUMPTION: SCREW CONVEYOR THAT WE USED IS ASSUMED AS BELT CONVEYOR SO THAT THE
POWER CAN BE CALCULATED.
ANSWER:
30
= 100
65
= 46,15 /
= + +
= 0,4 +
300 100
750 30
= 0,4 +
300 100
= 0,87
= 0
1,83
= 46,15
100
= 0,84
= 0,87 + 0 + 0,84
= , = ,
PROCESS FLOW DIAGRAM
COST OF PRODUCTION
MASS BALANCE