Sunteți pe pagina 1din 105

1

2
3
Megger - Substation overview

4
170 product groups, 2600 products

5
Megger Brand Names

MEGGER Insulation testers, fibre optic testing


MULTI-AMP Circuit breaker test tests
BIDDLE High voltage test sets
AVO Multimeters,Training, software
DUCTER Ohm meters
FOSTER Oil test sets
STATES Terminal blocks
METROSONICS Critical systems monitoring
PROGRAMMA Relay/ Circuit Breaker/ Battery Testing
PAX DIAGNOSTIC Transformer, Insulation Products

6
IEC 61850 STANDARD IN SUBSTATION AUTOMATION
Main purpose of the standard is to achieve interoperability among
different devices from different vendors within the same substation.

7
IEC 61850 STANDARD IN SUBSTATION AUTOMATION

8
IEC 61850 STANDARD IN SUBSTATION AUTOMATION

What is Substation Automation?

We need to know what we are talking about, in order to


understand what needs to be standardized.

9
10
11
THE POWER SUBSTATION
In a substation there are Primary Equipments:

12
THE POWER SUBSTATION

The Primary equipments in the Substation need


to be controlled.
The word CONTROL in a substation has nothing to do with Process
Control, where the word CONTROL is usually associated to feedback
systems:

13
THE POWER SUBSTATION

14
THE POWER SUBSTATION
Busbar change. Load is on Busbar 2

15
THE POWER SUBSTATION
Busbar change. Connecting Busbar 1 to Busbar 2

16
THE POWER SUBSTATION
Busbar change: Connecting the Feeders to Busbar 1

17
THE POWER SUBSTATION
Busbar change: Disconnecting feeders from Busbar 2

18
THE POWER SUBSTATION
Busbar change: Disconecting Busbar 2 from the system

19
THE POWER SUBSTATION
Busbar change. Busbar 1 in service

20
THE POWER SUBSTATION

21
THE POWER SUBSTATION
One very simple interlocking:
Earthing Switch and Disconnector
I can OPEN / CLOSE the Disconnector ONLY if the Earthing
Switch is OPEN.
If the Earthing Switch is CLOSED I cannot operate the
Disconnector.

22
THE POWER SUBSTATION
EARTHING SWITCH CLOSED

23
THE POWER SUBSTATION
EARTHING SWITCH OPEN

24
THE INTERLOCKING SYSTEM

25
THE INTERLOCKING SYSTEM
A Local Action (open/close) may require:
Local information (from the same bay)
Remote information (from different bays)

26
27
THE INTERLOCKING SYSTEM

28
THE INTERLOCKING SYSTEM

29
THE IEC 61850 INTERLOCKING SYSTEM

30
CONTROL / INTERLOCKING in an IEC 61850 substation

31
IEC 61850 Standard

32
THE POWER SUBSTATION
In a substation there are Primary Equipments..

33
THE POWER SUBSTATION
that must be protected.

34
THE PROTECTION RELAYS

35
THE PROTECTION RELAYS

36
THE PROTECTION RELAYS

The circuit breaker opens and interrupts the fault current. The relay
sees no fault conditions anymore and it resets. Circuit breaker
remains open, the fault has been cleared.

37
THE PROTECTION SYSTEM

38
THE PROTECTION SYSTEM
Radial Feeders: No communication

39
THE PROTECTION SYSTEM
Radial Feeders: No communication

40
THE PROTECTION SYSTEM
Radial Feeders: No communication

41
THE PROTECTION SYSTEM
Radial Feeders: No communication

42
THE PROTECTION SYSTEM
Radial Feeders: Communication

43
THE PROTECTION SYSTEM
Radial Feeders: Communication

44
THE PROTECTION SYSTEM
Radial Feeders: Communication

45
THE PROTECTION SYSTEM
Radial Feeders: Communication

46
IEC 61850 APPLICATION: PROTECTION

PROTECTION signals (Trip, Block, Acceleration..) are sent through


the station bus.
Horizontal communication

47
GOOSE communication for PROTECTION and CONTROL
GOOSE = Generic Object Oriented System Event.
Is an unacknowledged multicast message that is repeated with a certain
strategy allowing the supervision of the Horizontal Communication.

48
GOOSE or Contact (Conventional) ?

49
GOOSE or Contact (Conventional) ?

50
GOOSE or Contact (Conventional) ?

51
GOOSE or Contact (Conventional) ?

52
IEC 61850 Standard

53
54
BEFORE standardisation: REPORTING TO SCADA / RTU

Proprietary communication protocols were / are still available.


Handling correctly all protocols was and is still a challenge

55
BEFORE: PROTOCOL CONVERTERS / IMPLEMENTATIONS

56
IEC 61850 APPLICATION: REPORTING TO SCADA / RTU

IEDs from different vendors can exchange and use information over a
common communications media. No need to have protocol converters.
Reporting: Vertical Communication.

57
IEC 61850 APPLICATION: SCADA/RTU COMMUNICATION

The communication between SCADA / RTU and the IEDs


is defined in the IEC 61850 standard (MMS / FTP).

Data exchanged can be:

Control (operating primary objects)


Log
Reporting of events
Disturbance Files Upload

58
IEC 61850 Standard

59
IEC 61850: NETWORK TOPOLOGY

The data traffic runs on Ethernet, 100 Mbit/s.

This means that in the IEC 61850 substation there are Ethernet switches.

Protection and Control signals are


dependent on the correct
functionality of the communication
system, which has in the Ethernet
switches one of its most important
factors.

60
IEC 61850: NETWORK TOPOLOGY

Star

Ring

61
IEC 61850 Standard

62
IEC 61850: The SCL language
IEDs and Substations are described through XML files.
The IEC 61850 language used in the XML files is called
SCL language.
SCL: Substation Configuration Language.

63
IEC 61850: The SCL language (IED Modelling)

64
IEC 61850: The SCL language (IED modelling)
Bay A Bay Unit (IED)

PTRC (Trip, Operate)

65
IEC 61850: The SCL language (IED modelling)
Bay A Bay Unit (IED) SCL
PTRC (Trip, Operate)

66
IEC 61850: The SCL language (IED modelling)
Bay A Bay Unit (IED) SCL
PTRC (Trip, Operate)

67
IEC 61850: The SCL language (IED modelling)
Bay A Bay Unit (IED)
SCL
PTRC (Trip, Operate)

68
IEC 61850: The SCL language (IED modelling)
SCL SCL
It is possible to structure
the Logical Nodes, and
group them under different
Logical Devices.
The rules of this structure
are described in the XML
file.

69
IEC 61850: Services (IED modelling)
The SCL file also describes
what the IED can do (services).
In this case it seems that the
IED cannot offer upload of
disturbance recorder file, as the
FileHandling Service is not
listed:

While this IED allows to upload


the disturbance recorder files
(FileHandling Service is
listed):

70
IEC 61850: Different SCL files
Depending on the information they carry, there are different types of SCL files:

ICD (IED Capability Description)


CID (Configured IED Description)
SCD (Substation Configuration Description)

SSD (System Specification Description)

IID (Instantiated IED Description)


SED (System Exchange Description)

71
IEC 61850 Standard

72
IEC 61850: Engineering Process

73
IEC 61850: Engineering Process
An IEC 61850 substation is described by one special SCL file, called SCD file
(Substation Configuration Description).

74
IEC 61850: Engineering Process

There are software tools that can extract engineering information from the
SCD file and represent them in a comfortable way to the user:

75
IEC 61850: Engineering Process
REPORTING Vertical Communication

All the IEC 61850 devices (IEDs) describe themselves with


help of the SCL language.

SCL information from all IEDs are integrated into the


IEC 61850 Engineering Tool.

76
IEC 61850: Engineering Process
SCADA / RTU Vertical Communication

The SCADA system is


also IEC 61850
compliant, and it can read
the SCD files
understanding how the
substation looks like,
which IEDs are present
and which information
they send to the SCADA
system .

77
IEC 61850: Engineering Process
GOOSE Horizontal Communication
In the SCL file there is written which IED talks to which IED.
The standard messages among IEDs in the same substation are called
GOOSE messages (Generic Object Oriented Substation Event).
GOOSE messages can contain protection application information (TRIP,
Block etc.).

78
IEC 61850: Engineering Process
The IEC 61850 Engineering Tool
One IEC 61850 Engineering Tool is in principle a software that handles
SCL files.

The initial SCL files are provided by the IED vendor software tools, and they
are called ICD files (IED Capability Description).

The ICD files are imported in the IEC 61850 Engineering TOOL and
GOOSE Reporting information are added for each IED, creating the so
called SCD file (Substation Configuration Description).

The SCD file is then exported from the Engineering Tool. IED vendor tools
will import that file and will download in the IEDs the IEC 61850 information
that are written in the SCD files.

79
IEC 61850:
Engineering Process

80
IEC 61850: Engineering Tools
Documentation
The SCD file describes the
substation in IEC 61850 language
(SCL).
The IEC 61850 tool is able to
elaborate such information and to
show it in human readable format,
like a PDF file.

81
IEC 61850: Engineering Tools

82
IEC 61850 Standard

83
PROCESS BUS

PROCESS
Sampled
Merging Values
IEC 61850-9-2
NCIT
Units
(SV)
9-2
(MU)
BUS

84
FULLY IEC 61850 SUBSTATION

85
THE RELAY

86
Replacement of BO cards

GOOSE OUT

87
Replacement of BI cards

GOOSE OUT

GOOSE IN

88
GOOSE OUT

GOOSE IN

89
THE IEC 61850-8-1 IED

GOOSE IN GOOSE OUT

IEC 61850-8-1 Station Bus

90
Replacement of analog cards + A/D conversion

SAMPLED VALUES (SV)

GOOSE IN GOOSE OUT

IEC 61850-8-1 Station Bus

91
SAMPLED VALUES

GOOSE IN GOOSE OUT

IEC 61850-8-1 Station Bus

92
THE FULLY IEC 61850 COMPLIANT IED

SAMPLED VALUES

IEC 61850-9-2
Process Bus

GOOSE IN GOOSE OUT

IEC 61850-8-1 Station Bus

93
WHERE ARE THE SAMPLED VALUES COMING FROM?

SAMPLED VALUES

94
Merging Units

95
Merging Units

96
IEC 61850 Standard

97
IEC 61850 Standard

98
IEC 61850: TESTING
How do we test all of this?

How do we test the Network Topology (Switches)?

How do we test the Vertical Communication to SCADA?


(IEC 61850-8-1, MMS, Reporting)

How do we test Interlockings?


(IEC 61850-8-1 GOOSE)

How do we test Protection Schemes?


(IEC 61850-8-1 GOOSE and IEC 61850-9-2 SV)

99
IEC 61850: TESTING

100
Information about IEC 61850
KTH: Kungliga Tekniska Hgskolan
University courses on IEC 61850
for SA (Substation Automation)

101
Information about IEC 61850
Tissues (Technical Issues) database
www.tissues.iec61850.com
IEC 61850 standard is a dynamic standard!. You must follow it!

102
Information about IEC 61850
IEC 61850 Blog www.blog.iec61850.com
Competent and fast up to date blog on IEC 61850

Information on new IEC 61850


documents

Information on IEC 61850 events

Information on new instruments and


techniques on the IEC 61850

103
Information om IEC 61850
Elforsk www.elforsk.se

104
Information om IEC 61850
Megger http://www.megger.com
IEC 61850 test equipment, tools and litterature

105

S-ar putea să vă placă și