Sunteți pe pagina 1din 12

WORK PLACE ASSIGNMENT WPA

PAPER 4

SALLEH BIN DAMIRI @ HAIRUN

INDEX NO. EGS346

I/C NO. - 680727-01-6129


INTRODUCTION
1. Company Mitrajaya Homes Sdn Bhd

2. Project KIARA 9, Lot 1897, Jalan Kiara 3, Segambut Dalam, Kuala Lumpur

3. Total of Workers 520

4. Work Activity To build 2 low rise blocks of 16 exclusive 2 storey Garden Villas
with 41 storey block housing 192 luxurious condominium units with 5 star grand
entrance lobby

5. Work Scope
Administrations
Bar Bender
Interior Decorates
Carpenter
MIVAN Aluminium Formworks
Concrete
Electrical
Sanitary
OBJECTIVE

To identify the hazards related to the activities in the KIARA


9 project.

To evaluate and assess the hazards exist.

To propose control measures and evaluate the adequacy of


existing control measures.

To review the current Safe Work System (SWS).


METHOD
Inspection and observation at workplace;
Measurement of the atmosphere, monitoring the environment or medical
surveillance of workers
Hazard checklist;
Review of documents and publications;
Information from publications
Acts, Regulations and Codes of Practice
Statistics
Handbooks
Chemical Safety Data Sheet (CSDS)/ Material Safety Data Sheet (MSDS)
Reports of accidents, accident investigation and audits
Analyzing work processes;
Job safety analysis;
Analyzing unsafe act, unsafe condition, and an accident and injury statistic data;
KIARA 9 WORKING PROCESS 7 DAYS CYCLE

DAY DAY DAY DAY DAY DAY DAY WORK


SER TYPE OF WORK
1 2 3 4 5 6 7 FORCE
1 SETTING OUT 2 2 4
2 ERECT PLATFORM 6 6 11
R.C WALL
3 STEEL BAR REINFORCED 28 28 55
4 ERECT MIVAN FORM 27 27 54
5 MECHANICAL & ELECTRIC

CASTING CONCRETE
6 VENTICALITY MIVAN 9 9 18
7 HORIZONTAL PLOT 4 4 7
SUSPENDED FLOOR
8 ERECT MIVAN FORM 27 27 54
9 FLOOR LEVEL 2 2 4
10 STEEL BAR & BRC REINFORMENT 10 10 19
11 MECHANICAL & ELECTRIC
12 FLOOR DROP 4 4
13 DISMANTLE FORM & MOVE UP 18 18 18 54
14 SEAL HOLES 2 2 4
15 HOUSE KEEPING 2 2 4
TOTAL WORK FORCE 20 53 80 72 53 14 17 156
FLOWCHART OF HIRARC PROCESS

Classify Work activity

Employer Representative Consultation Worker Representative

Identify Hazards

Risk Assessment Review

Prepare Risk Control Action

Plan (If Necessary)

Implement
LIKELIHOOD
LIKELIHOOD EXAMPLE RATING

Most likely The most likely result of the hazard / event being 5
realized
Possible Has a good chance of occurring and is not unusual 4
Conceivable Might be occur at sometime in future 3
Remote Has not been known to occur after many years 2
Inconceivable Is practically impossible and has never occurred 1
SEVERITY
SEVERITY (S) EXAMPLE RATING

Catastrophic Numerous fatalities, irrecoverable property damage 5


and productivity
Fatal Approximately one single fatality major property 4
damage if hazard is realized
Serious Non fatal injury, permanent disability 3

Minor Disabling but not permanent injury 2

Negligible Minor abrasion, bruise, cuts, first aid type injury 1


QUALITATIVE RISK TABLE
SEVERITY (S)
LIKELIHOOD (L) 1 2 3 4 5

5 5 10 15 20 25
4 4 8 12 16 20
3 3 6 9 12 15
2 2 4 6 8 10
1 1 2 3 4 5

RISK DESCRIPTION ACTION


- High
A HIGH risk requires immediate action to control the
15 25 HIGH
- Medium hazard as detailed in the hierarchy of control.
A MEDIUM risk requires a planned approach to
- Low 5 - 12 MEDIUM controlling the hazard and applies temporary measure if
required.
A risk identified as LOW may be considered as acceptable
1-4 LOW
and further reduction may not necessary.
HAZARD IDENTIFICATION, RISK ASSESTMENT AND RISK CONTROL
1. Hazard Identification 1. Risk Analysis 1. Risk Control
Which Can
Existing Risk Control Likeli
No Work Activity Hazard Cause / Effect Severity Risk Recommended Control Measure
(If Any) hood

1 Dismantling aluminium Falling Object Slip down / The working platform Engineering Control
formwork plunge down with toe board and To tie all the leaned aluminium
5 4 20
covered by net. platform to the wall with flexible
wire ropes.
2 Uphold temporary Falling Object Plunge down - Engineering Control
cantilever slab with To tie all the prop length with
4 4 16
prop length timber at the middle and bottom
prop length
3 Working at the edge of Slip, trip and Fall down To tie all the Administrative Control
building fall parameter with Tool Box Talk
flexible wire rope. 3 4 12 PPE
a. Wear Safety Harness
b.Signage at all workers staircase.
Clearing debris and Falling object The bucket - Engineering Control
4 unused material from might snap
high level. 2 3 6 Designed a proper and safe bucket
for the purpose of lifting and
carrying material to high level.
5 Polishing aluminium Dust Cancer Wear dust mask Engineering Control
formworks To provide a big fan which blow all
the dust to the nearest jungle.
2 3 6 PPE
To provide them with proper dust
mask and goggle.
6 Knocking Aluminium Noise Deaf Ear Plug Ear Plug
2 1 2
Formworks
HAZARD RATING

SER HAZARDS IDENTIFICATION RISK RATING

this hazard causes fatality or permanent


1 Dismantling aluminium formworks
disability
Uphold temporary cantilever slab with this hazard causes fatality or permanent
2 prop length (PL) disability
this hazard causes fatality or permanent
3 Working at the edge of building
disability
Clearing debris and unused material from this hazard non fatal injury or permanent
4 high level disability

5 Polishing aluminium formworks non fatal injury and permanent disability

6 Knocking (Noise) first aid type injury


BENEFITS TO THE EMPLOYER AND THE
EMPLOYEES

EMPLOYER
1. GOOD IMAGE AND CREDIBILITY
2. TO IMPROVE THE PRODUCTIVITY AND PROFITS
3. TO PREVENT ACCIDENT FROM HAPPENS

EMPLOYEES
1. NO INCIDENT
2. TO IMPROVE THE MORAL OF WORKERS
3. TO UPGRADE THE KNOWLEDGE TO THE WORKERS IN THE ASPECT OF
OCCUPATIONAL SAFETY AND HEALTH