Documente Academic
Documente Profesional
Documente Cultură
ARRANGED BY :
AJRIANTO
DBD 112 005
``
BACKGROUND
Could not be denied that coal mining can degrade the quality of
the environment over time. This of course can be detrimental to the
community around the mining area. As for the problems arising from
coal mining, among others, soil balance disorders, decreased land
productivity, soil density be increased, erosion and sedimentation, and
disturbance of flora and fauna .
Thus it is necessary stage of mining activities (reclamation)
where the project was to improve the land that has been damaged.
FORMULATION OF THE PROBLEM
Grahamineral?
Province.
Image Map Location Research Areas
To reach the location permit areas Mining PT. Marunda Grahamineral
can route as follows :
1. From the city of Palangka Raya to Muara Teweh with the land trip for
± 10 hours, traveling as far as ± 300 Km.
2. From Muara Teweh then the journey can be continued through the
waterway along the Barito River to the village of Rice Belange
districts Laung Tuhup by speedboat for ± 2 hour. From Jamut journey
continues by land as far as 40 km to the north toward Menyango
Camp which is the site office of PT. Marunda Grahamineral.
RESEARCH FLOW CHART
Study of literature
Data collection
Data processing :
1. To know how to stages land arrangement at PT. Marunda
Grahamineral.
2. Analyze setting slope to reduce erosion on the land reclamation
area that has been in governance at PT. Marunda Grahamineral.