1 Pb Statement
Description of the problem (what? where? since when? based on which data?
Based on which facts?)
2 Goal Statement
3 Business Case
Why to do the project?
K€
Project Labor
Project Materials
Project Contractors
Equipment investment
Yearly operation cost
TOTAL Costs 0
Incremental Revenues
Labor Savings
Material Savings
TOTAL Benefits (1 year) 0
ROI 0
4 Project scope
Customers:
Others:
Black Belt:
Master Black Belt:
VP Quality / Quality Manager:
6 Planning D M A I C
Dates:
Gantt
7 (SIPOC)
Supplier = My
My Company Customer
Input Step 1 Step 2 Step 3 Output
measurement
*Critical To Quality
Conclusion
•Problem with trend, variability or both?
Equable tous droits réservés. Copyrights Equable. 10 Six Sigma Consulting
Measure Project name
Photography of current performance
Discrete CTQ
M-step 4: •Sample size:
Baseline •Short term data or Long term data?
current (As Is) •Process capability
•Yield (%)=
process •%defects=
capability •DPMO=
•Opportunities per unit=
•DPU=
•Equivalent ZLT=
•Equivalent ZST (ZLT+1.5)=
•95% confidence interval on DPMO:
Conclusion:
•Pb of technology (short term common causes)?
•Pb of control (long term shift due to special causes)?
•Both pbs?
Equable tous droits réservés. Copyrights Equable. 12 Six Sigma Consulting
Analyze Project name
Set expected performance
Improvement Goal
A-step 6: Target (from benchmark) for:
Define Trend:
Performance Variability:
LT DPMO or LT %defects=
Objectives of Yield (%)=
To Be process ZLT=
ZST=(ZLT+1.5)=
Conclusion
Conclusion
Policy analysis:
•Exist
•Are applied
Y/CTQ Output
Conclusion:
Conclusion:
Conclusion:
FMEA:
Conclusion:
I-step 9:
Transfer function:
Discover
Variable
relationships
(if necessary) Proposed Solution: Optimal Settings
I13
X tolerance settings:
I-step 10:
Establish
Operating
Tolerances
(if necessary)
Discrete CTQ:
•Sample size:=
•Short term data or Long term data?
•Process capability
•Yield (%)=
•%defects=
•DPMO=
•Opportunities per unit=
•DPU=
•Equivalent ZLT=
•Equivalent ZST (ZLT+1.5)=
•95% confidence interval on DPMO